| Course | MKT 311 Mobile Marketing |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post evaluating mobile marketing results and permission |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 311 Module 8
Module Eight Discussion
Fifty-Seven Percent, and a June We Would Rather Forget
My MKT 311 composite, Bluff City Bikes, has now run a full season on the mobile plan. Downloaders who took a first ride rose from 41 to 57 percent, short of 60. First riders who rode again within 30 days rose from 45 to 58 percent. Weekday rides reached 27 percent of all rides, below the 30 percent target, and average membership rose from about 1,400 to 1,690. Total rides grew 24 percent, enough to meet the city's request, though a warm, dry September helped more than any message did.
In Bike to Work May, riders who received the campaign took 3.1 weekday rides on average against 2.3 in the random holdout, so the campaign caused roughly 0.8 extra weekday rides per person. Push permission rose from 34 to 52 percent after we started asking after the first ride rather than at sign-up. Kim et al. (2015) found that continued use of a brand's app raised later spending, while dropping the app reversed it; our second-ride gains look like the same pattern in rides. Tucker (2014) found people responded better to personalized messages once they felt in control of their data, which fits the higher opt-in when the request came with a reason at a sensible moment.
In June, a software fault at two stations sent outage pushes to every rider, not just those affected, and 9 percent of push users opted out in one week. Many who left wrote in the app review section that we had become "spam," which undid some of the goodwill the permission change had earned. Grewal et al. (2016) stress that mobile message effects depend on context; an irrelevant alert at dinner is the wrong context, and it cost us permission we had worked to earn.
I would build the frequency cap into the system itself, not just the plan. Which result would you put first for the city: the 24 percent ride growth, the holdout result or the June opt-outs?
References
Grewal, D., Bart, Y., Spann, M., & Zubcsek, P. P. (2016). Mobile advertising: A framework and research agenda. Journal of Interactive Marketing, 34, 3-14. https://doi.org/10.1016/j.intmar.2016.03.003
Kim, S. J., Wang, R. J.-H., & Malthouse, E. C. (2015). The effects of adopting and using a brand's mobile application on customers' subsequent purchase behavior. Journal of Interactive Marketing, 31, 28-41. https://doi.org/10.1016/j.intmar.2015.05.004
Tucker, C. E. (2014). Social networks, personalized advertising, and privacy controls. Journal of Marketing Research, 51(5), 546-562. https://doi.org/10.1509/jmr.10.0355
What the MKT 311 Module 8 instructions ask for
The closing MKT 311 discussion invites you to evaluate mobile marketing results and reflect on what the course taught, often using a plan you developed or a case. A good post sets results beside targets, separates outcomes proven by a comparison group from those that merely moved, explains both gains and setbacks with research and draws a lesson about mobile marketing that goes beyond the example. Setbacks deserve as much space as successes, because mobile channels can lose permission quickly. The reflection should be short and should name something you would do differently, rather than repeating the course schedule. Tested results deserve more weight than numbers that simply rose during the season.
How this MKT 311 Module 8 discussion example is built
The sample reviews Bluff City Bikes' first season under its mobile plan. Downloaders who ride rose from 41 to 57 percent, second rides from 45 to 58 percent, weekday share from 22 to 27 percent and average members from about 1,400 to 1,690. Push permission rose from 34 to 52 percent once it was requested after a first ride. In Bike to Work May, campaign riders averaged 3.1 weekday rides against 2.3 in the holdout. In June, a burst of outage pushes caused a wave of opt-outs. Kim, Wang and Malthouse, Tucker and Grewal and colleagues explain the pattern, and the post asks which result to lead with. It closes with a lesson about building frequency caps into the system.
Where the MKT 311 Module 8 rubric puts the points
In this last discussion, posts earn credit for comparing results with targets, for distinguishing tested effects from correlations, for explaining both successes and setbacks with research, for drawing a transferable lesson and for replies that engage. The best posts give a few clear numbers, name what the holdout test proved, admit what went wrong and say what will change. Points drop for celebrating downloads or opens, for leaving out setbacks, for research mentioned without application and for reflections that summarize modules. Naming a habit you will keep in future mobile work shows the course made a difference. Replies should test classmates' readings of their results. Clear separation of tested and untested results is the mark of a strong evaluation.
MKT 311 Module 8 help: the mistakes that cost points
Lay out the main results beside the targets, including those you missed. Identify which results were tested against a holdout or comparison and say what they show. Then look honestly at a setback and explain it, ideally with research. Draw one lesson that would apply to another mobile plan. A few sentences on what you would change is enough reflection. Ask classmates which result they would put first in a report to decision makers, which forces a choice between good news and important warnings. Give the setback its own paragraph, with its cause and the fix. End with a question that forces a real choice.
Get MKT 311 Module 8 written to your instructions
Share the MKT 311 Module 8 prompt and the results you need to interpret. We set them against the targets, read any holdout test, explain gains and setbacks with research on mobile behavior and permission and leave classmates a question about what to report first. A first post is free; expect it in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 311 papers and related BS Marketing samples
- MKT 311 Module 1 Discussion: A Bike Share That Lives on Phones
- MKT 311 Module 2 Mobile Audit Assignment: Auditing a Bike Share's Mobile Experience
- MKT 311 Module 3 Milestone One: Mobile Objectives, Riders and Moments
- MKT 311 Module 4 Discussion: Geofences, Scooters and Permission
- MKT 311 Module 5 Milestone Two: The Mobile Channel Mix and Budget
- MKT 311 Module 6 Mobile Campaign Assignment: A Bike-to-Work Month in Pushes and Texts
- MKT 311 Module 7 Final Project: The Mobile Marketing Plan
- ACC 425 Module 8 Expert Witness Assignment: The Forensic Accountant on the Stand
- HRM 200 Module 3 Milestone One: Hiring Fifty-Five People in Eighteen Months
- ACC 315 Module 4 Project One: Evaluating the Current System
- ACC 421 Module 5 Fraud Risk Assessment Assignment: The Fraud Triangle at a Family Company
MKT 311 Module 8 questions, answered
Where can I find a free MKT 311 Module 8 Discussion sample?
The full MKT 311 Module 8 post is published here, judging a bike share's mobile marketing season by its funnel, a holdout test and opt-outs.
How do you know a mobile campaign worked?
Compare people who received it with a random holdout group that did not; the difference in behavior shows what the campaign caused.
Why do users turn off push notifications?
Usually because messages are too frequent or not useful to them, so every push should carry a clear benefit and frequency should be capped.
When should an app ask for permissions?
After the user has seen value, with a clear reason; asking after a first successful use tends to earn more permissions than asking at sign-up.
What should a mobile marketing evaluation include?
Results against targets, tested effects from holdouts or comparisons, setbacks and their causes and the changes planned for the next period.