| Course | MKT 311 Mobile Marketing |
|---|---|
| Module | Module 1 |
| Paper type | undergraduate discussion post on how mobile devices change marketing and the customer journey |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 311 Module 1
Module One Discussion
When the App Is the Front Door
I ride a bike share at home, so for MKT 311 my example is a composite one: Bluff City Bikes, a nonprofit e-bike share in Dubuque, Iowa. It runs 240 e-bikes from 38 stations, mostly along the Mississippi riverfront and downtown, and charges $1 to unlock plus 25 cents a minute or $15 a month for members. There is no kiosk and no key card. Every ride begins in the app.
A visitor walking the riverfront on a Saturday searches "bike rental near me." A map shows Bluff City Bikes first, with a station 200 yards away. She taps the result, downloads the app and meets seven onboarding screens: account, email verification, phone verification, payment, a waiver, a safety video and a map tutorial. Standing in the sun with a friend waiting, she nearly gives up at the safety video. She finishes, rides along the river for forty minutes and loves it. The company's data say only 41 percent of people who download the app ever take a first ride, and fewer than half of those come back for a second.
Shankar and Balasubramanian (2009) define mobile marketing as two-way or multi-way communication and promotion of an offer between a firm and its customers using a mobile medium, and they stress that mobile adds location and constant presence to ordinary digital marketing. Ghose et al. (2013), comparing mobile and computer browsing on a microblogging site, found that links at the top of the screen and options located close to the user drew far more clicks on phones, because searching costs more on a small screen and nearby places matter more on the go. That explains why the map pin brought her in. Grewal et al. (2016) offer a framework in which the effect of mobile advertising depends on the context, the ad's goals and its elements, which suggests that the same message works differently on a Saturday riverfront and at a Monday bus stop.
For a business whose phone is the store, which moment would you fix first: being at the top of the map, getting through onboarding or getting the second ride?
References
Ghose, A., Goldfarb, A., & Han, S. P. (2013). How is the mobile Internet different? Search costs and local activities. Information Systems Research, 24(3), 613-631. https://doi.org/10.1287/isre.1120.0453
Grewal, D., Bart, Y., Spann, M., & Zubcsek, P. P. (2016). Mobile advertising: A framework and research agenda. Journal of Interactive Marketing, 34, 3-14. https://doi.org/10.1016/j.intmar.2016.03.003
Shankar, V., & Balasubramanian, S. (2009). Mobile marketing: A synthesis and prognosis. Journal of Interactive Marketing, 23(2), 118-129. https://doi.org/10.1016/j.intmar.2009.02.002
What the MKT 311 Module 1 instructions ask for
Week one of MKT 311 pairs a short hello with a look at how mobile technology has changed marketing and consumer behavior, often with an example from daily life. Some prompts ask how mobile marketing differs from other digital marketing. A strong post picks one business and follows a customer through its mobile touchpoints in order, explains what is different about doing those steps on a small screen in a specific place and supports the explanation with research rather than statistics about phone ownership. It also identifies where the mobile path loses people, which sets up the audit and planning work the course builds toward. Screenshots or a quick count of steps make the example easier to follow.
How this MKT 311 Module 1 discussion example is built
The sample introduces Bluff City Bikes, a composite nonprofit bike share in Dubuque, Iowa, with 240 e-bikes at 38 stations that unlock only through its app. The post follows a visitor on the riverfront who searches "bike rental near me," sees the bike share pinned on a map, downloads the app, scrolls through seven onboarding screens and nearly quits before the first ride. It explains the experience with Shankar and Balasubramanian's definition of mobile marketing, Ghose, Goldfarb and Han's evidence that on phones the top-ranked and closest options win far more clicks and Grewal and colleagues' framework for mobile advertising. It asks peers which mobile moment they would fix first.
Where the MKT 311 Module 1 rubric puts the points
Grading for this opening discussion usually rests on four elements: a clear sense of what makes mobile marketing different, a concrete example followed step by step, research that explains the example and replies that add to the conversation. Posts score well when they connect features of phones, such as small screens, location and constant presence, to specific customer behavior. They lose points for general statements about how many people own smartphones, for examples with no sequence, for sources named without findings and for replies that only agree. A brief, honest account of where the example business loses customers sets up the rest of the course. Linking the cited study directly to a step in the example shows real understanding.
MKT 311 Module 1 help: the mistakes that cost points
Pick a business you mostly meet on your phone, and walk through one real visit or purchase step by step: what you searched, what appeared at the top, what you tapped, what you had to fill in and where you hesitated. Then ask what was different because it happened on a phone, in a particular place, rather than on a laptop at home. Find one study that compares mobile and desktop behavior or describes mobile marketing, and use its finding. Keep your introduction brief. Ask classmates which step they would fix first, which usually brings out their own frustrations as mobile customers. Counting the taps between search and purchase is a quick way to make your point concrete.
Get MKT 311 Module 1 written to your instructions
Share the MKT 311 Module 1 question and a business you see mostly through your phone. We trace a customer's mobile path, show where it breaks, explain the difference with research on mobile behavior and close with a question for classmates. The opening post is free and arrives in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 311 papers and related BS Marketing samples
- MKT 311 Module 2 Mobile Audit Assignment: Auditing a Bike Share's Mobile Experience
- MKT 311 Module 3 Milestone One: Mobile Objectives, Riders and Moments
- MKT 311 Module 4 Discussion: Geofences, Scooters and Permission
- MKT 311 Module 5 Milestone Two: The Mobile Channel Mix and Budget
- MKT 311 Module 6 Mobile Campaign Assignment: A Bike-to-Work Month in Pushes and Texts
- MKT 311 Module 7 Final Project: The Mobile Marketing Plan
- MKT 311 Module 8 Discussion: What a Season of Mobile Changes Did
- FIN 460 Module 8 Discussion: Telling the Children
- HRM 425 Module 5 Milestone Two: From Apprentice to Foreman
- OL 322 Module 8 Discussion: Sustaining Change
- QSO 328 Module 8 Discussion: Reporting Progress Without Greenwashing
MKT 311 Module 1 questions, answered
Where can I find a free MKT 311 Module 1 Discussion sample?
The complete MKT 311 Module 1 post sits on this page, following a first-time rider from a phone search to an e-bike share ride.
What is mobile marketing?
Two-way or multi-way communication and promotion of an offer between a firm and its customers using a mobile medium, device or technology.
How is mobile browsing different from desktop browsing?
Research found that on phones, top-ranked links and nearby options attract a much larger share of clicks, because searching is harder on small screens and location matters more.
Why does location matter in mobile marketing?
Phones go everywhere, so a customer's physical location and nearby options shape what they search for and choose in the moment.
What makes an app onboarding process lose users?
Too many screens and required fields before the first useful action, which on a small screen in a public place feels like too much work.