MKT 311 Module 6 Mobile Campaign Assignment Example

Reviewed by Portia Lambrick, MBA

This MKT 311 Module 6 Mobile Campaign Assignment sample designs a complete mobile campaign, from audience and messages to timing, offers and a fair test of its effect. SNHU MKT 311 (MKT-311) asks BS Marketing students to plan a specific mobile campaign that could be launched. Bluff City Bikes, a composite e-bike share in Dubuque, Iowa, wants more weekday commuting riders. The paper defines the audience, writes the texts and push messages with send times and limits, sets an offer and its expiry, adds a station QR challenge, holds out a random group so the effect can be measured and forecasts rides and memberships, using field experiments on mobile context, timing and coupon redemption.

CourseMKT 311 Mobile Marketing
ModuleModule 6
Paper typeundergraduate assignment designing a mobile push and text campaign with a control group
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 311 Module 6

1

Bike to Work May: A Push and Text Campaign With a Holdout Group for Bluff City Bikes

[Student Name]

Southern New Hampshire University

MKT 311: Mobile Marketing

Mobile Campaign Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe campaign, its riders and its forecast are fictional; Bluff City Bikes is a composite.
2

Bike to Work May: A Push and Text Campaign With a Holdout Group for Bluff City Bikes

Introduction

Weekday commuting makes up only 22 percent of Bluff City Bikes' rides, and the mobile plan aims to raise it to 30 percent. May is the best month to start: mornings are mild, the city runs a bike-to-work week and new residents arrive for summer jobs downtown. Bike to Work May is a four-week mobile campaign aimed at riders who could easily commute by bike but rarely do. This paper defines the audience, writes the messages, sets the offer, builds in a test and forecasts the result.

What this page is doingStates the campaign's purpose.
3

Audience

Eligible riders are those who have taken at least one ride, have opted in to texts or push notifications and whose home or work address, or most frequent start station, lies within a quarter mile of a station. About 3,200 riders meet these conditions, roughly 1,100 of them already members. Before the campaign starts, the system will randomly assign 15 percent, about 480 riders, to a holdout group that receives no campaign messages, leaving about 2,720 in the campaign. Holdout riders keep receiving ordinary service messages, such as receipts and station outage notices, so that the only difference between the groups is the campaign itself.

What this page is doingDefines who is eligible.
4

Messages and Timing

Campaign messages

MessageChannelWhenText
Morning ride checkText, opted-in commuters7:05 a.m. on weekdays forecast dry and above 50 degrees"4 bikes at 14th and Main. 11 minutes to the Port of Dubuque. Ride? Reply STOP to end."
Membership offerPush, non-membersMonday of week 1, then once more in week 3 if unused"Ride to work this month for $5. Offer ends Sunday."
Friday tallyPushFriday, 4 p.m."You rode to work 3 times this week. That's 41 car-free miles."
Bus stop challengeQR sign at the bus transfer centerWeekdays, 6:30 to 9 a.m."Bus late? Scan, ride free this morning."

No rider receives more than one text a day or three marketing pushes a week, and rain-day texts are skipped automatically.

What this page is doingWrites what riders will receive.
5

Why These Times and Places

Luo et al. (2014) found in a randomized SMS experiment that for people near a venue, same-day messages produced more purchases than messages sent two days earlier, and that both timing and proximity mattered. The 7:05 text reaches commuters on the morning they decide how to get to work, close to a station. Andrews et al. (2016), working with a telecom provider's field experiment, found that commuters on crowded subway trains were about twice as likely to respond to a mobile offer as those on uncrowded trains, which suggests that the physical situation at the moment of the message shapes response. Dubuque's buses are rarely crowded, but a late bus creates a similar moment of frustration and attention, which is why the QR challenge sits at the transfer center during the morning rush.

What this page is doingGrounds the timing in research.
6

The Offer and Its Expiry

The offer is a first month of membership for $5 instead of $15, valid for seven days from the message. Danaher et al. (2015), studying about 144,000 mobile coupons delivered over two years at a large shopping mall, found that where and when a coupon was delivered strongly affected redemption and that mobile coupons were redeemed much faster than traditional ones, suggesting shorter expiry periods to signal urgency. A seven-day window gives commuters a working week to try the bike without letting the offer fade into the background. Members, who already pay, receive the morning texts and tallies but no price offer.

What this page is doingDesigns the incentive.
7

Measurement

After four weeks, weekday rides per person and new memberships will be compared between the campaign group and the holdout. Because assignment is random, the difference estimates what the campaign caused. QR scans and offer redemptions will be tracked but treated as activity, not proof. A check after two weeks will compare the groups early; if campaign riders show no difference, the morning text will be changed before the second half.

What this page is doingSeparates the campaign's effect.
8

Forecast

In past Mays, eligible riders averaged about 2.4 weekday rides each over four weeks. If the campaign raises that to 3.2 among the 2,720 campaign riders, it would add about 2,180 weekday rides. If about 10 percent of the roughly 1,780 non-members in the campaign group take the $5 offer, some 180 riders, and 85 percent of those stay on at full price, the bike share would gain about 150 lasting members, plus perhaps 30 more from the QR challenge, about 180 in all. At $15 a month, those members would bring in about $2,700 a month while they remain.

What this page is doingEstimates the result.
9

Example Week

A rider who lives near the 14th and Main station and works at the port would see the campaign this way in week one. Monday at 7:05 a.m., a text says four bikes are waiting and the ride takes eleven minutes; she rides. Monday at noon, a push offers her a first month of membership for $5, valid until Sunday; she ignores it. Tuesday it rains and no text arrives. Wednesday and Thursday she rides again after the morning text. Friday at 4 p.m., the tally tells her she rode three times and saved 41 miles of driving, and on Saturday she taps the offer before it expires. A holdout rider on the same street would see none of these messages, and her week shows what would have happened anyway.

What this page is doingShows the campaign as a rider would experience it.
10

Costs and Risks

The campaign costs about $1,400: $600 in text messages, $500 for QR signs and $300 in discounts beyond regular price, plus staff time. The main risk is message fatigue; the caps and the automatic rain-day skip guard against it. A second risk is that the holdout group hears about the offer from friends, which would understate the effect; that would make the estimate cautious rather than misleading.

What this page is doingNotes what it costs and what could go wrong.
11

Conclusion

Bike to Work May reaches riders at the moment and place they decide how to commute, gives them a reason to try it for a week and measures honestly whether it worked. If it does, the same design can run each spring and fall, and the holdout comparison will tell the board exactly how many rides and members each run produces, which is the evidence the city has asked to see before renewing its support.

What this page is doingSums up.
12

References

Andrews, M., Luo, X., Fang, Z., & Ghose, A. (2016). Mobile ad effectiveness: Hyper-contextual targeting with crowdedness. Marketing Science, 35(2), 218-233. https://doi.org/10.1287/mksc.2015.0905

Danaher, P. J., Smith, M. S., Ranasinghe, K., & Danaher, T. S. (2015). Where, when, and how long: Factors that influence the redemption of mobile phone coupons. Journal of Marketing Research, 52(5), 710-725. https://doi.org/10.1509/jmr.13.0341

Luo, X., Andrews, M., Fang, Z., & Phang, C. W. (2014). Mobile targeting. Management Science, 60(7), 1738-1756. https://doi.org/10.1287/mnsc.2013.1836

What the MKT 311 Module 6 instructions ask for

The mobile campaign assignment in MKT 311 typically asks you to design a campaign using one or more mobile tools, such as push notifications, text messages, in-app messages, mobile coupons or location triggers, with objectives, audience, message content, timing, offer and measurement. A strong paper writes the actual messages, sets when they go out and how often, chooses an offer with an expiry suited to mobile behavior, respects permission and builds a control or holdout group so the campaign's effect can be separated from what would have happened anyway. It forecasts the result with simple arithmetic and explains how results will decide whether the campaign continues. Including the cost of the campaign helps the reader judge whether the forecast justifies it.

How this MKT 311 Module 6 mobile campaign assignment example is built

The sample designs Bike to Work May for Bluff City Bikes. About 3,200 riders who live or work within a quarter mile of a station and have opted in to messages are eligible; 15 percent are held out at random. The rest receive a 7:05 a.m. text on fair-weather weekdays with bike counts at their home station, a push offer of a $5 first month of membership valid for seven days and a Friday tally of their rides. A QR challenge at the bus transfer center offers a free ride to anyone who scans and rides that morning. The forecast is about 2,180 extra weekday rides and 180 new members, reasoned from Andrews and colleagues, Luo and colleagues and Danaher and colleagues.

Where the MKT 311 Module 6 rubric puts the points

Mobile campaign assignments are usually assessed on clear objectives and audience, specific and well-timed messages, the offer design, attention to permission and frequency, a credible measurement design and a reasoned forecast, along with writing. Top papers show message text, send times and caps, choose offer expiry deliberately, hold out a random group and forecast with stated assumptions. Points drop for campaigns described only as "send push notifications," for messages with no timing logic, for long-dated offers that remove urgency, for success measured by opens alone and for forecasts without assumptions. A plan to stop or change the campaign based on early results shows professional discipline. A cost estimate beside the forecast lets graders see whether the campaign pays.

MKT 311 Module 6 help: the mistakes that cost points

Define who receives the campaign and why they are likely to respond. Write each message in full, with the exact send time and the reason for that time. Pick an offer that helps people try the behavior you want, and give it a short expiry, since mobile offers are acted on quickly or not at all. Cap how many messages anyone receives. Hold out a random share of eligible people who receive nothing, so you can compare. Forecast the result with a few numbers and say what they assume. Decide in advance what result after two weeks would make you change course. Keep each message to one action and one link.

Get MKT 311 Module 6 written to your instructions

Upload the MKT 311 Module 6 instructions and describe the users you can message. We define the audience, write the messages with send times and limits, set an offer with a sensible expiry, build in a random holdout and forecast the result with research behind each choice. A first campaign is free, typically ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 311 papers and related BS Marketing samples

MKT 311 Module 6 questions, answered

Where can I find a free MKT 311 Module 6 Mobile Campaign Assignment sample?

A full MKT 311 Module 6 mobile campaign is posted here, a bike-to-work push and text program with a random holdout group.

How long should a mobile coupon be valid?

Research on mobile coupons at a shopping mall found they were redeemed much faster than traditional coupons, suggesting shorter expiry periods to signal urgency.

Does context affect how people respond to mobile offers?

A telecom field experiment found commuters in crowded subway trains were about twice as likely to buy in response to a mobile offer as those in uncrowded trains.

What is a holdout group in a mobile campaign?

A random share of eligible users who receive no campaign messages, making them the yardstick for what the campaign actually changed.

When should a mobile message be sent?

When the person is close to the decision in time and place; for nearby users, same-day messages often work better than ones sent days ahead.