INT 220 Module 6 Trade Agreements Assignment Example

Reviewed by Portia Lambrick, MBA

This INT 220 Module 6 Trade Agreements Assignment sample examines how trade agreements and global institutions shape a company's costs and markets. SNHU INT 220 (INT-220) asks BS Business Administration students to go beyond describing the WTO and regional agreements to show what they change for a business. For Harlan Greenhouse Systems, a composite Ohio maker of commercial greenhouses, the paper explains the rules that govern its sales to Mexico, Morocco and Kenya, adds the agreements that govern its customers' own exports of berries, tomatoes and flowers, reviews research on whether agreements and the WTO raise trade and recommends how Harlan should use the agreements.

CourseINT 220 Global Dimensions in Business
ModuleModule 6
Paper typeundergraduate assignment analyzing how trade agreements and global institutions affect a company
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for INT 220 Module 6

1

Rules of Origin and Rose Exports: How Trade Agreements Shape Harlan's Three Markets

[Student Name]

Southern New Hampshire University

INT 220: Global Dimensions in Business

Trade Agreements Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHarlan Greenhouse Systems is an invented teaching case; agreement descriptions are general and should be checked against current official texts.
2

Rules of Origin and Rose Exports: How Trade Agreements Shape Harlan's Three Markets

Introduction

Harlan Greenhouse Systems ships steel greenhouse frames, glazing and climate-control systems from Ohio to growers in Mexico, Morocco and Kenya. Each shipment crosses a border governed by a different arrangement. So do the berries, tomatoes and flowers its customers grow, which travel to the United States and Europe. This assignment explains the agreements and institutions that govern both sets of crossings, reviews research on whether such agreements actually increase trade and recommends how Harlan should use them. All agreement details should be confirmed against current official texts before contracts are signed, since tariff schedules and rules change.

What this page is doingMany borders, many rules.
3

Mexico

The United States-Mexico-Canada Agreement, which replaced NAFTA in 2020, allows most goods made in member countries to cross duty-free. The key condition is the rules of origin: a product qualifies only if enough of its value or processing comes from North America, under product-specific rules. Harlan builds frames from U.S. steel and assembles climate systems in Ohio, but some controllers and sensors come from Asia. To claim duty-free treatment, Harlan must determine under the applicable product rules whether each item qualifies and keep records to support a certification of origin. Non-qualifying items would face Mexico's normal tariffs, which would raise prices for growers. The agreement also matters for Harlan's customers, since it keeps U.S. markets open to Mexican berries and tomatoes, although tomato trade has long been subject to special arrangements negotiated between the two governments.

What this page is doingUSMCA and rules of origin.
4

Morocco

The U.S.-Morocco Free Trade Agreement, in force since 2006, eliminated tariffs on most U.S. industrial goods entering Morocco, giving Harlan an advantage over competitors from countries without such an agreement. For Harlan's customers, the more important agreement points north: Morocco's association agreement with the European Union governs its tomato and vegetable exports, which face seasonal quotas and price rules. When the EU adjusts those terms, Souss valley growers' ability to invest in new greenhouses rises or falls.

What this page is doingTwo agreements, two directions.
5

Kenya

Kenya has no free trade agreement with the United States, so Harlan's equipment faces Kenya's import duties, which follow the East African Community's common external tariff because Kenya belongs to that customs union. The United States and Kenya have discussed a trade and investment partnership, but it does not provide tariff preferences. For Harlan's customers, the decisive arrangement is with Europe: Kenya's economic partnership agreement with the European Union allows its cut flowers to enter the EU duty-free, protecting the flower farms that buy Harlan's greenhouses. Kenya is also part of the African Continental Free Trade Area, which may in time expand regional markets for its produce.

What this page is doingNo deal with Washington, a deal with Brussels.
6

Global Institutions

All three countries and the United States are members of the World Trade Organization, whose rules on nondiscrimination and tariff bindings set the baseline for all of these agreements. Membership limits how suddenly a country can raise tariffs and provides a dispute settlement process between governments, though Harlan cannot use it directly. Its practical value for a firm of Harlan's size is predictability: bound tariff rates set ceilings that governments cannot exceed without consequences, which makes long-term quotes less risky.

What this page is doingThe WTO in the background.
7

What Research Says

The evidence on whether trade agreements and institutions raise trade is more nuanced than either supporters or critics suggest. Rose (2004) found little evidence that membership in the GATT or WTO, in itself, increased countries' trade. Subramanian and Wei (2007) challenged that finding, showing that the WTO promoted trade strongly but unevenly, with larger effects for industrial countries and for members that actually liberalized. Baier and Bergstrand (2007), accounting for the fact that countries choose which agreements to join, found that free trade agreements roughly doubled members' bilateral trade over about ten years. Together these studies suggest that specific agreements with real tariff cuts, such as those covering Harlan's Mexican and Moroccan sales and its customers' exports, matter more than general membership.

What this page is doingDo agreements work?
8

Implications

How trade arrangements affect Harlan and its customers

MarketHarlan's exportsCustomers' exportsNet effect
MexicoDuty-free if rules of origin are metOpen U.S. market, special tomato arrangementsStrong, depends on origin records
MoroccoDuty-free on most goods under the FTAEU access with quotas and price rulesStrong, sensitive to EU policy
KenyaEAC external tariff appliesDuty-free EU access for flowersModerate for Harlan, strong for customers
What this page is doingWhat the agreements change for Harlan.
9

Limits of the Agreements

Trade agreements reduce tariffs but leave many costs untouched. Product standards, electrical certification and customs procedures still differ, and a greenhouse controller certified for U.S. use may need additional testing for local grid conditions in Kenya. Agreements can also change: the USMCA includes a joint review mechanism that allows members to revisit its terms, and Europe periodically renegotiates quotas for Moroccan produce. Finally, agreements do not protect against currency swings or customers' financing problems, which the earlier economic analysis showed matter at least as much for Harlan's sales. Treating an agreement as a permanent advantage would therefore be a mistake; it is a favorable rule that must be monitored and used carefully.

What this page is doingWhat they do not cover.
10

Recommendations

First, Harlan should audit its bill of materials for Mexican orders, determine which components meet USMCA origin rules and consider sourcing qualifying controllers from North American suppliers to protect duty-free status. Second, it should feature the U.S.-Morocco agreement in Moroccan sales materials, since competitors from Asia face higher tariffs. Third, it should price Kenyan quotes with the common external tariff included and ask its customs broker about any duty relief available for agricultural equipment. Fourth, it should track changes in the EU's arrangements with Morocco and Kenya, because they determine its customers' ability to invest. Finally, it should join the industry association that represents U.S. agricultural equipment exporters in trade policy discussions.

What this page is doingUsing the rules.
11

Conclusion

Harlan's export business depends not only on the agreements that cover its own shipments but on those that cover its customers' produce. USMCA and the Moroccan agreement lower Harlan's costs; Europe's agreements with Morocco and Kenya keep its customers in business. Managing both sets is part of selling greenhouses abroad. In practice, that means one person at Harlan, probably the export manager, should own a short annual review of every agreement touching its markets and report changes to sales and pricing before they surprise a customer.

What this page is doingTwo sets of borders.
12

References

Baier, S. L., & Bergstrand, J. H. (2007). Do free trade agreements actually increase members' international trade? Journal of International Economics, 71(1), 72-95. https://doi.org/10.1016/j.jinteco.2006.02.005

Rose, A. K. (2004). Do we really know that the WTO increases trade? American Economic Review, 94(1), 98-114. https://doi.org/10.1257/000282804322970724

Subramanian, A., & Wei, S.-J. (2007). The WTO promotes trade, strongly but unevenly. Journal of International Economics, 72(1), 151-175. https://doi.org/10.1016/j.jinteco.2006.07.007

What the INT 220 Module 6 instructions ask for

The trade agreements assignment in INT 220 usually asks you to explain the role of international institutions such as the WTO, IMF and World Bank, or of regional trade agreements, and how they affect a company or industry. Expect to describe the relevant agreements, explain tariffs, rules of origin and other provisions, analyze their effects on the business and evaluate their benefits and limits. A strong paper explains only the agreements that actually touch the company, translates provisions into costs and opportunities, considers the agreements that affect the company's customers and suppliers as well as its own exports, uses research on the effects of trade agreements and ends with concrete actions.

How this INT 220 Module 6 trade agreements assignment example is built

The sample explains three arrangements. Under the United States-Mexico-Canada Agreement, Harlan Greenhouse Systems' steel frames and climate systems enter Mexico duty-free only if they meet rules of origin, so Harlan must document where its components come from. The 2006 U.S.-Morocco free trade agreement removed most tariffs on U.S. industrial goods, while Morocco's agreement with the European Union governs its customers' tomato exports. Kenya has no free trade agreement with the United States, but its flowers enter Europe duty-free under an economic partnership agreement. Citing Baier and Bergstrand, Subramanian and Wei and Rose, the paper argues that customers' trade access matters as much as Harlan's own. A limits section reminds the reader that agreements leave standards, certification and currency risk untouched and can be renegotiated.

Where the INT 220 Module 6 rubric puts the points

This assignment is usually scored on the explanation of the agreements and institutions, accuracy, analysis of effects on the company, evaluation of benefits and limitations, use of research and sources, and APA style. Top papers explain provisions accurately, connect them to costs and markets, consider customers' and suppliers' trade as well as the company's own and draw on evidence about whether agreements work. Papers lose points for long histories of the WTO with no link to the business, for confusing free trade areas with customs unions, for claiming tariff rates without sources, for ignoring rules of origin and for conclusions that do not suggest any action. Pointing out what an agreement does not do, such as removing product standards, signals a careful reading.

INT 220 Module 6 help: the mistakes that cost points

Identify every border your company's goods and its customers' goods cross, then find the agreement or rule that governs each crossing. Explain the provisions that matter, especially tariffs and rules of origin, in plain terms and with official sources. Ask what each provision costs or saves the company. Then look one step further: if your customers export, the agreements covering their exports affect whether they can afford to buy from you. Use research on whether trade agreements and the WTO actually increase trade, since the evidence is mixed in interesting ways. End with specific actions, such as documenting origin, using a preference or lobbying through an industry group.

Get INT 220 Module 6 written to your instructions

Upload the INT 220 Module 6 instructions and the markets your company trades with. We explain the agreements and institutions that apply, show what they change in costs and access, review the research on their effects and recommend how to use them. Turnaround is about two days; first assignments are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 220 papers and related BS Business Administration samples

INT 220 Module 6 questions, answered

Where can I find a free INT 220 Module 6 Trade Agreements Assignment sample?

The full INT 220 Module 6 assignment is on this page, examining how USMCA, the U.S.-Morocco FTA and Kenya's trade ties affect a greenhouse exporter.

What are rules of origin?

Requirements that determine whether a product counts as made within a trade agreement's member countries and therefore qualifies for reduced or zero tariffs.

Do free trade agreements increase trade?

Research by Baier and Bergstrand found that free trade agreements roughly doubled trade between members over about a decade, once the choice to join was accounted for.

Does WTO membership increase trade?

Rose found little effect of membership alone, while Subramanian and Wei found strong but uneven effects, larger for industrial countries that liberalized more.

What is the difference between a free trade area and a customs union?

In a free trade area members remove tariffs among themselves but keep their own outside tariffs; in a customs union they also adopt a common external tariff.