INT 220 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This INT 220 Module 8 Discussion sample asks what sustainability means for a company whose products depend on a scarce shared resource in another country. SNHU INT 220 (INT-220) ends the BS Business Administration course with sustainability and responsibility across borders. The post looks at Harlan Greenhouse Systems, a composite Ohio greenhouse maker, and its sales to tomato exporters in Morocco's Souss valley, where farm pumping has lowered an aquifer that villages also rely on. It weighs walking away against changing what Harlan sells, draws on research about water embedded in trade, sustainable development and shared value, notes a real limitation of efficiency and asks classmates about a sustainability tradeoff in their own industry.

CourseINT 220 Global Dimensions in Business
ModuleModule 8
Paper typeundergraduate discussion post on sustainability and corporate responsibility across borders
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for INT 220 Module 8

1

Module Eight Discussion

Every Tomato Carries Water

Harlan Greenhouse Systems has sold 46 greenhouse projects in Morocco's Souss valley, where export farms grow tomatoes and other vegetables for Europe. The valley's aquifer has fallen sharply after decades of pumping, and authorities have tightened controls. Villages near some farms report wells running dry, and small farmers who cannot afford deeper boreholes have been squeezed out. A Harlan sales manager asked me last week whether we should keep selling there. It is a fair question, because our greenhouses are part of what makes the valley's export model profitable.

What this page is doingThe aquifer under the tomatoes.
2

Hoekstra and Mekonnen (2012), mapping the world's water footprint, showed how much water is embedded in traded agricultural products and how water-scarce regions export large volumes of virtual water through crops. Every tomato shipped from Agadir to Europe carries Souss groundwater with it. Harlan's greenhouses make that trade possible.

What this page is doingWater travels with the crop.
3

If Harlan stopped selling, growers would buy from competitors, some offering cheaper structures with less efficient irrigation. International business can either contribute to or undermine sustainable development, depending on how firms use their capabilities (Kolk & van Tulder, 2010). Porter and Kramer (2011) describe shared value as creating economic value in ways that also address social problems. Harlan's best contribution may be what it sells, not whether it sells.

What this page is doingWhy walking away is not enough.
4

Harlan should lead every Moroccan proposal with closed-loop irrigation that recaptures drainage water, sensors that cut water use and the option of connecting to desalinated supply. It should also require proof of legal water rights before quoting, so it does not equip farms pumping illegally.

What this page is doingWhat Harlan could do.
5

Efficiency does not guarantee savings. If water-saving systems lower a farm's cost per tomato, the farm may expand and pump just as much. Harlan cannot solve that alone; it depends on enforcement of pumping limits. What Harlan can do is support those limits publicly, through its industry association and in conversations with Moroccan officials, rather than quietly benefiting from weak enforcement. A supplier that sells efficiency while lobbying for loose rules would be practicing exactly the kind of responsibility Porter and Kramer warn turns into public relations.

What this page is doingAn honest limit.
6

What sustainability tradeoff does your industry face, and does it have a better option than walking away?

What this page is doingFor classmates.
7

References

Hoekstra, A. Y., & Mekonnen, M. M. (2012). The water footprint of humanity. Proceedings of the National Academy of Sciences, 109(9), 3232-3237. https://doi.org/10.1073/pnas.1109936109

Kolk, A., & van Tulder, R. (2010). International business, corporate social responsibility and sustainable development. International Business Review, 19(2), 119-125. https://doi.org/10.1016/j.ibusrev.2009.12.003

Porter, M. E., & Kramer, M. R. (2011). Creating shared value. Harvard Business Review, 89(1/2), 62-77.

What the INT 220 Module 8 instructions ask for

The final INT 220 discussion usually asks about sustainability and corporate social responsibility in global business, such as environmental effects of operations abroad, the triple bottom line or whether businesses should go beyond legal requirements in other countries. Prompts may ask you to evaluate a company's sustainability practices or propose how it should balance profit with environmental and social responsibility. A good post examines one concrete issue, identifies who bears the costs and benefits, uses research rather than corporate slogans, considers options beyond simply withdrawing, notes unintended consequences and asks classmates to examine a tradeoff in their own industry. Some prompts also ask whether the company should accept limits on its own sales for the sake of a shared resource.

How this INT 220 Module 8 discussion example is built

The sample examines Harlan Greenhouse Systems' sales to tomato exporters in Morocco's Souss valley, where groundwater pumping for export farms has lowered water tables that nearby villages also use. It asks whether Harlan should stop selling there. Drawing on Hoekstra and Mekonnen's work on water embedded in traded crops, Kolk and van Tulder on international business and sustainable development and Porter and Kramer on shared value, it argues against walking away, which would hand sales to less careful competitors, and for leading with closed-loop irrigation and requiring proof of legal water rights. It admits that efficiency can lead farms to expand, and asks peers about tradeoffs in their industries.

Where the INT 220 Module 8 rubric puts the points

Closing INT 220 discussions are typically marked on understanding of sustainability and corporate responsibility, analysis of a specific issue, use of research, realistic recommendations and the quality of exchanges with peers. Top posts name who gains and who bears the costs, weigh options beyond quitting a market, acknowledge unintended consequences and support the argument with research. Credit drops for vague commitments to sustainability, for treating a company's marketing claims as evidence, for ignoring the people affected, for skipping sources and for replies that praise a classmate's values without examining whether the proposed fix would actually work. Naming an unintended consequence, such as the rebound effect, usually separates a thoughtful post from a hopeful one.

INT 220 Module 8 help: the mistakes that cost points

Choose one concrete issue where a business decision affects an environmental or social resource, such as water, land or labor. Identify who benefits and who bears the costs, including people outside the company's customers. Consider several options, from withdrawing to changing products, terms or partners, and say what each would achieve. Use research on sustainability and on how business can contribute to or harm development. Watch for unintended consequences, such as efficiency gains that lead to more use rather than less. Make a recommendation the company could act on. End by asking classmates about a tradeoff in their own industry, which keeps replies specific and comparable. One concrete number or finding about the resource at stake keeps the post grounded.

Get INT 220 Module 8 written to your instructions

Send the INT 220 Module 8 prompt and a sustainability tradeoff you see in business. We lay out who bears the cost, apply research on sustainable development and shared value, propose what the company could change and close with a question peers can test against their own industries. About two days; first posts are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 220 papers and related BS Business Administration samples

INT 220 Module 8 questions, answered

Where can I find a free INT 220 Module 8 Discussion sample?

The full INT 220 Module 8 post is here on this page, asking whether an Ohio greenhouse maker should keep selling in Morocco's water-stressed Souss valley.

What is virtual water?

The water used to produce a good, which is effectively exported when the good is traded, so water-scarce regions that export crops also export their water.

What is shared value?

Porter and Kramer's idea that companies can create economic value in ways that also address social needs, such as products that use fewer resources.

Should companies withdraw from markets with sustainability problems?

Sometimes, but withdrawal can simply hand business to less careful competitors; changing what is sold and the terms of sale may do more good.

What is the rebound effect in sustainability?

When efficiency gains lower the cost of using a resource, leading to more total use, such as farms expanding after adopting water-saving irrigation.