| Course | OL 125 Human Relations in Administration |
|---|---|
| Module | Module 7 |
| Paper type | undergraduate final project presenting a human relations improvement plan for a workplace, built from the course milestones |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 125 Module 7
Keeping the Evening Shift: A Human Relations Improvement Plan for Merrimack Commons
[Student Name]
Southern New Hampshire University
OL 125: Human Relations in Administration
Final Project: Human Relations Improvement Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Keeping the Evening Shift: A Human Relations Improvement Plan for Merrimack Commons
Introduction
Evening aide turnover at Merrimack Commons reached 66 percent last year, against 56 percent on the day shift, and the evening shift averages three call-outs a night, costing the community about $4,200 for each departure and leaving residents waiting longer for help. Across the milestones the causes came into focus: lopsided assignments, effort no one noticed, concerns no one answered, a running feud with the day shift, aides left on the outside and plain fatigue. This plan, written as the evening shift supervisor, sets out actions in five areas that break that cycle, a request to the administrator on pay and the timeline, costs and measures for each.
What Changed From the Milestones
Feedback on Milestone One noted that I had relied heavily on a small survey; the plan therefore adds exit conversations by someone other than the supervisor and a larger survey at six months. Feedback on Milestone Two asked how the day supervisor would be persuaded; the plan now begins with a joint proposal from both supervisors to the director of resident care. Feedback on the inclusion paper asked for attention to night aides; the language policy and training changes now apply to all shifts.
The Cycle the Plan Must Break
Unequal assignments and invisible effort weaken aides' sense that the organization values them. Heavy workload and little reward produce exhaustion. Exhausted aides call out, and the rest work short. The day and evening shifts blame each other for unfinished work, and aides who feel left out, whether because of language or because they are new, have fewer reasons to stay. Maslach et al. (2001) tied burnout to poor fit between people and their jobs across several areas of working life. The evening shift shows strain in nearly all of them, and each action below is aimed at one or more of them.
Area One: Fair and Chosen Assignments
Hallway assignments will follow a published monthly rotation, so no aide works memory care more than two evenings a week unless she asks to. Aides will choose their preferred rotation pattern each month, within rules that keep experienced aides spread across hallways. Deci et al. (2017) found that motivation that lasts depends on autonomy, competence and relatedness; choosing a rotation gives aides a measure of control in a job that offers little.
Area Two: Recognition and Voice
Every aide will receive at least one specific, written note of recognition a month, naming what she did and why it mattered. A weekly ten-minute huddle will ask aides what slowed them down that week, and the supervisor will report back each week on what was done. Voice research points the same way: in the study by Detert and Burris (2007), openness from the manager was what made staff willing to raise problems. Gerstner and Day (1997) linked the quality of supervisor relationships to satisfaction, commitment and lower intention to quit. The supervisor will also meet each aide for fifteen minutes every quarter.
Area Three: Teamwork With the Day Shift
The two supervisors will draft a written task split for baths, laundry, charting and morning preparation, revised with aides from both shifts. A fifteen-minute overlap from 2:50 to 3:05 p.m. will include a joint huddle in which unfinished work that is reported carries no blame. Edmondson (1999) found that psychological safety supported team learning and performance; the no-blame rule exists so that aides report unfinished work instead of hiding it.
Area Four: Inclusion
A rule limited to conversations with residents, handoffs and safety will take the place of the blanket English-only rule, drafted with aides from several language groups. Annual training will add translated handouts and teach-back checks. Two-person transfer partners will rotate across language groups and experience levels. Nishii (2013) showed that departments seen as fair and involving had less of the friction that diversity can bring. Each new aide will have a conversation in the first 90 days about what she brings and what would help her stay.
Area Five: Relief From Exhaustion
A float pool of four part-time aides, shared across shifts, will cover call-outs so the shift rarely works more than one aide short. Thirty-minute breaks will be protected by staggering them on a posted schedule. Aides who work short will receive a small differential for that shift. These steps address workload directly and break the link between one call-out and the next.
A Request to the Administrator
The supervisor cannot change pay, but the plan asks the administrator to compare aide wages with five nearby employers and to consider a stay bonus for aides who reach their half-year and one-year marks. The case is financial: at $4,200 per departure, reducing evening turnover from 66 to 45 percent would save about $14,000 a year on the evening shift alone, and more across all shifts.
Timeline and Costs
Timeline and first-year costs
| Action | Start | Annual cost |
|---|---|---|
| Rotation rules and choice | Month 1 | $0 |
| Recognition notes and weekly huddle | Month 1 | $1,200 (cards, small items) |
| Task split and paid 15-minute overlap | Month 2 | $19,000 (overlap pay, both shifts) |
| Inclusion practices and translated training | Months 2 to 4 | $6,500 |
| Float pool of four part-time aides | Month 3 | $62,000 (partly offset by lower overtime) |
| Short-shift differential | Month 3 | $8,000 |
| Quarterly one-on-one meetings | Month 1 | $0 |
| Total | $96,700 |
Overtime on the evening shift cost about $135,000 last year. If the float pool and lower call-outs cut it by half, the plan pays for most of itself before counting savings from lower turnover.
Measures
Measures and targets
| Measure | Now | Six months | Twelve months |
|---|---|---|---|
| Evening aide turnover (annualized) | 66% | 55% | 45% |
| Call-outs per evening | 3.1 | 2.2 | 1.5 |
| Evening overtime hours (annualized) | 4,700 | 3,200 | 2,400 |
| Aides agreeing "my work is noticed" | 25% | 50% | 65% |
| Aides agreeing "assignments are fair" | 21% | 55% | 70% |
| Moved baths and undone morning tasks | 23% and 31% | Under 15% | Under 10% |
Conclusion
None of these actions would solve the problem alone. Fair assignments without recognition still leave aides invisible; recognition without coverage still leaves them exhausted; and teamwork with the day shift depends on aides feeling safe to say what they did not finish. Together they address the fairness, reward, control, community and workload behind the cycle, while the request to the administrator addresses the part a supervisor cannot reach. The evening shift will know the plan is working when aides start recommending the job to their friends.
References
Deci, E. L., Olafsen, A. H., & Ryan, R. M. (2017). Self-determination theory in work organizations: The state of a science. Annual Review of Organizational Psychology and Organizational Behavior, 4, 19-43. https://doi.org/10.1146/annurev-orgpsych-032516-113108
Detert, J. R., & Burris, E. R. (2007). Leadership behavior and employee voice: Is the door really open? Academy of Management Journal, 50(4), 869-884. https://doi.org/10.5465/amj.2007.26279183
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Gerstner, C. R., & Day, D. V. (1997). Meta-analytic review of leader-member exchange theory: Correlates and construct issues. Journal of Applied Psychology, 82(6), 827-844. https://doi.org/10.1037/0021-9010.82.6.827
Maslach, C., Schaufeli, W. B., & Leiter, M. P. (2001). Job burnout. Annual Review of Psychology, 52, 397-422. https://doi.org/10.1146/annurev.psych.52.1.397
Nishii, L. H. (2013). The benefits of climate for inclusion for gender-diverse groups. Academy of Management Journal, 56(6), 1754-1774. https://doi.org/10.5465/amj.2009.0823
What the OL 125 Module 7 instructions ask for
For the OL 125 final project, students typically lay out a full plan to improve human relations in one workplace, drawing on your milestones and the course's topics. Expect to restate the problem with evidence, analyze its causes, recommend actions in areas such as communication, motivation, conflict, teamwork and inclusion and explain how the plan will be carried out and judged. Strong plans connect each action to a cause identified earlier and to research, assign owners and dates, estimate costs and set measures. They show where milestone feedback changed the plan and separate what a supervisor can do now from what requires decisions by higher managers.
How this OL 125 Module 7 final project example is built
The sample plan addresses evening shift turnover at Merrimack Commons, a composite assisted living community in Concord, New Hampshire, where evening aide turnover reached 66 percent and call-outs average three a night. It acts in five areas: chosen hallway rotations under fair rules, specific recognition and a weekly huddle that acts on aides' concerns, a joint handoff and written task split with the day shift, inclusion practices for aides from fourteen countries and a float pool and protected breaks to ease exhaustion. It asks the administrator to review pay. Research on burnout, supervisor relationships, psychological safety, motivation, inclusion and voice supports each part, and a timeline, budget and measures complete the plan. It closes by explaining how the five areas reinforce one another.
Where the OL 125 Module 7 rubric puts the points
The OL 125 final project is generally graded on a clear problem statement with evidence, sound analysis of causes, recommendations tied to those causes and to course research, a realistic plan with owners, timing and costs, meaningful measures, the use of milestone feedback and professional, organized writing with sources. The best plans read as one argument and show how the actions reinforce each other. Plans lose marks for repeating milestones without connecting them, recommending vague improvements such as better communication, promising changes a supervisor cannot make, omitting costs or measures or ignoring the feedback received on earlier work.
OL 125 Module 7 help: the mistakes that cost points
Start by revising each milestone with your instructor's feedback, then build the plan around the problem statement. Group your actions by cause, not by course topic, so each action clearly answers something you found. For each action, say what will happen, who will do it, when it starts and what it costs. Separate actions you can take yourself from those that need approval, and make the case for the latter. Choose a few measures, such as turnover, absences, complaints and survey results, with targets and dates. Note where feedback changed your thinking. Close by explaining how the actions work together to break the cycle you identified. Show the arithmetic behind any savings you claim.
Get OL 125 Module 7 written to your instructions
Send the guidelines for the OL 125 final project and your milestones. We combine and revise them into one human relations improvement plan with a clear problem, actions grounded in research, owners, a timeline, costs and measures, and we show where feedback changed the plan. Your first OL 125 final project is free, typically delivered in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 125 papers and related BS Business Administration samples
- OL 125 Module 1 Discussion: Why Human Relations Matter
- OL 125 Module 2 Communication Analysis Assignment: Communication Breakdown at Shift Change
- OL 125 Module 3 Milestone One: Human Relations Problem Analysis
- OL 125 Module 4 Discussion: What Motivates Employees
- OL 125 Module 5 Milestone Two: Conflict and Teamwork Plan
- OL 125 Module 6 Diversity and Inclusion Assignment: Diversity and Inclusion on a Work Team
- OL 125 Module 8 Discussion: Reflecting on Human Relations Skills
- FIN 355 Module 4 Life Insurance Policy Assignment: Keep, Convert or Surrender a 1995 Whole Life Policy
- INT 315 Module 7 Final Project: The International Management Plan
- ACC 330 Module 1 Discussion: Who Should Pay, and How We Know
- FIN 485 Module 6 Insurance and Education Assignment: Protecting Income and Paying for College
OL 125 Module 7 questions, answered
Where can I find a free OL 125 Module 7 Final Project sample?
The complete OL 125 final project on this page presents a human relations improvement plan for an evening shift at a composite assisted living community.
What goes in a human relations improvement plan?
The problem and its evidence, the causes, actions tied to each cause and to research, owners, timing, costs, measures and the decisions needed from higher managers.
How do I make recommendations practical?
Give each one an owner, a start date and a cost, and choose a measure that will show whether it worked.
How can supervisors reduce burnout?
By addressing workload, control, reward, fairness and community, for example through fair assignments, recognition, input into decisions and coverage for absences.
What if part of the problem is pay?
Separate it from what you can change, and make a clear case with data to the managers who control pay, while acting on the causes within your reach.