OL 125 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 125 Module 1 Discussion sample asks why human relations skills matter so much to a new supervisor, and what happens to a team when they are missing. SNHU OL 125 (OL-125) opens with this question for BS Business Administration students. The post introduces Merrimack Commons, a composite assisted living community in Concord, New Hampshire, where the writer has just been promoted from resident care aide to evening shift supervisor over her former coworkers. It ties aide turnover of 58 percent to relationships on the shift, uses research on engagement, supervisor relationships and perceived support and asks classmates which relationship matters most where they work.

CourseOL 125 Human Relations in Administration
ModuleModule 1
Paper typeundergraduate discussion post on why human relations skills matter to a new supervisor, introducing the workplace to be studied
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 125 Module 1

1

Module One Discussion

From Aide to Supervisor in One Week

For this course I will study Merrimack Commons, a composite assisted living community in Concord, New Hampshire. It has 84 apartments, a 22-bed memory care neighborhood and 118 employees. Sixty-one of them are resident care aides, licensed nursing assistants who help residents bathe, dress, eat and take their medications. I was one of them for six years. Two weeks ago I became the evening shift supervisor, from 3 p.m. to 11 p.m., over sixteen aides who were my coworkers last month.

What this page is doingThe workplace.
2

Aide turnover was 58 percent last year, and the evening shift is the worst. We average three call-outs a night, which means aides working short, residents waiting longer for help and $310,000 in overtime across the building. The aides who left told the exit interviewer about pay, but most of them told me something else first: nobody noticed when they did good work, and nobody asked what would help. One aide who left in January had trained four new hires in a year without a word of thanks; another asked three times to rotate off the memory care hallway and was never answered. Both took jobs at a nursing home ten minutes away for twenty-five cents more an hour.

What this page is doingThe problem I inherited.
3

Harter et al. (2002) pooled results across thousands of business units in dozens of companies and reported that the more engaged units had better customer satisfaction, productivity and safety and lower turnover. Gerstner and Day (1997) found that the quality of an employee's relationship with a supervisor was associated with job satisfaction, commitment and lower intentions to quit. Eisenberger et al. (1986) showed that employees form a belief about whether the organization values them, and that this belief was linked to fewer absences. On my shift, the organization is mostly me. I cannot raise wages, but I decide who gets the hard hallway, whether I thank someone by name and whether I listen when an aide says a resident seems different tonight.

What this page is doingWhy relationships are the work.
4

Which single working relationship at your job most affects whether people stay, and why?

What this page is doingYour workplace.
5

References

Eisenberger, R., Huntington, R., Hutchison, S., & Sowa, D. (1986). Perceived organizational support. Journal of Applied Psychology, 71(3), 500-507. https://doi.org/10.1037/0021-9010.71.3.500

Gerstner, C. R., & Day, D. V. (1997). Meta-analytic review of leader-member exchange theory: Correlates and construct issues. Journal of Applied Psychology, 82(6), 827-844. https://doi.org/10.1037/0021-9010.82.6.827

Harter, J. K., Schmidt, F. L., & Hayes, T. L. (2002). Business-unit-level relationship between employee satisfaction, employee engagement, and business outcomes: A meta-analysis. Journal of Applied Psychology, 87(2), 268-279. https://doi.org/10.1037/0021-9010.87.2.268

What the OL 125 Module 1 instructions ask for

The opening OL 125 discussion usually asks you to introduce a workplace and explain why human relations skills matter there, often from your own position as an employee or supervisor. Expect to describe the organization, your role and the people you work with, then show how relationships at work affect results such as turnover, quality or customer satisfaction. Strong posts use a specific situation rather than general statements about teamwork, connect it to research on engagement, supervisor relationships or support and avoid blaming problems on individual attitudes alone. A figure or two, such as turnover or absences, makes the stakes clear and hands peers a concrete OL 125 case to answer in their replies.

How this OL 125 Module 1 discussion example is built

The sample introduces Merrimack Commons, a composite assisted living community in Concord, New Hampshire, with 118 employees, 61 of them resident care aides. The writer was an aide for six years before becoming evening shift supervisor over her former coworkers. Aide turnover reached 58 percent last year, and the evening shift averages three call-outs a night. Harter, Schmidt and Hayes's meta-analysis linking engagement to turnover, Gerstner and Day's review of supervisor relationships and Eisenberger and colleagues' work on perceived organizational support explain why the new supervisor's relationships with aides may matter more than any policy. The post asks classmates which working relationship matters most where they work.

Where the OL 125 Module 1 rubric puts the points

Marks in the first OL 125 discussion usually reflect a clear introduction to a real workplace, a specific link between human relations and results, use of research rather than opinion, a thoughtful question for peers and replies that add something. The best posts show how a relationship or a supervisor's behavior changes what employees do, such as whether they stay or speak up. Posts lose credit when they describe the organization without connecting it to human relations, list qualities of a good boss without evidence, blame problems on lazy or difficult employees or answer classmates with short agreement instead of a related example from their own work.

OL 125 Module 1 help: the mistakes that cost points

Start with the workplace: what it does, how many people work there and your role. Pick one result that depends on people, such as turnover, absences, mistakes or customer complaints, and give a figure if you can. Then describe a moment that shows how relationships affect that result, such as how a supervisor treats a late arrival or how coworkers share work. Use one or two studies on engagement, supervisor relationships or perceived support to explain what you saw. Avoid blaming individuals; look for what the supervisor or organization controls. End with a question for classmates, and in replies share a similar moment from your own workplace. A single honest number about your workplace makes the post far stronger than adjectives.

Get OL 125 Module 1 written to your instructions

Send the Module 1 prompt for OL 125 and a few lines about the workplace you will study. We explain why human relations decide how that team performs and who stays, support the point with workplace research and finish with a question for classmates. Your first OL 125 post is free and usually reaches you within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 125 papers and related BS Business Administration samples

OL 125 Module 1 questions, answered

Where can I find a free OL 125 Module 1 Discussion sample?

The complete OL 125 Module 1 post appears on this page: a new evening supervisor at a composite assisted living community on why human relations decide who stays.

Why do human relations skills matter for supervisors?

Research links employees' engagement and the quality of their relationship with a supervisor to satisfaction, commitment and turnover, so a supervisor's everyday behavior shapes results.

What is perceived organizational support?

Workers' overall sense of whether the organization appreciates what they contribute and looks out for them, which research links to lower absenteeism and stronger commitment.

What is leader-member exchange?

The quality of the working relationship between a supervisor and each employee; higher-quality relationships are associated with better performance, satisfaction and commitment.

How does engagement affect business results?

A large meta-analysis found that business units with more engaged employees tended to have better customer satisfaction, productivity, profit, safety and lower turnover.