OL 125 Module 2 Communication Analysis Assignment Example

Reviewed by Portia Lambrick, MBA

This OL 125 Module 2 Communication Analysis sample examines how a message failed to reach the person who needed it, and what a supervisor can change so it does not happen again. SNHU OL 125 (OL-125) has BS Business Administration students analyze real communication at work. The case is a fall at Merrimack Commons, a composite assisted living community, after a resident's new fall risk was mentioned in a hallway at shift change and never reached the evening aide. The paper traces the breakdown to rushed handoffs, an unofficial group text and aides who had stopped speaking up, applies research on media richness and employee voice and recommends specific changes.

CourseOL 125 Human Relations in Administration
ModuleModule 2
Paper typeundergraduate assignment analyzing a workplace communication breakdown and recommending changes to channels, listening and employee voice
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 125 Module 2

1

What Gets Lost at Three O'Clock: A Communication Analysis of Shift Change at Merrimack Commons

[Student Name]

Southern New Hampshire University

OL 125: Human Relations in Administration

Communication Analysis Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe fall, the residents and the staff are fictional, invented for OL 125.
2

What Gets Lost at Three O'Clock: A Communication Analysis of Shift Change at Merrimack Commons

Introduction

On a Tuesday in March, Mrs. Okafor, an 87-year-old resident of Merrimack Commons, fell in her bathroom at 9:40 p.m. and fractured her wrist. That morning her physician had changed her blood pressure medication, and by lunch she was unsteady on her feet. The day aide who noticed told another aide in the hallway at 2:55 p.m. The evening aide assigned to Mrs. Okafor never heard. This paper traces how the message traveled and where it failed, explains why with research on communication and employee voice and recommends changes to how the community passes information from shift to shift.

What this page is doingFrames the incident and the question.
3

How the Message Traveled

The path of one message

TimeWhoWhat happened
11:30 a.m.Day nurseRecorded the medication change in the electronic record
12:15 p.m.Day aide (Grace)Saw Mrs. Okafor sway while standing; helped her sit
2:55 p.m.Grace to evening aide (Paul)Mentioned it in the hallway while both were moving between rooms
3:05 p.m.PaulAssigned to a different hallway by the supervisor; did not pass it on
3:10 p.m.Evening aide (Lena)Took Mrs. Okafor's hallway; received a printed list with no notes
9:40 p.m.Mrs. OkaforGot up alone to use the bathroom and fell

Four people knew about the risk by early afternoon, and the one who needed to know did not. The nurse's note was in the record, but aides do not routinely read medication changes, and nothing linked the change to Mrs. Okafor's mobility. Grace told the right shift but the wrong person, and the assignment change ten minutes later broke the chain.

What this page is doingFollows the message step by step.
4

The Channel Problem

Daft and Lengel (1986) ranked ways of communicating by how many cues they carry, how quickly the listener can answer back and how personal they feel, and that uncertain or ambiguous messages need richer channels. On that scale, a conversation in person carries the most, and a printed list of names carries almost nothing. The shift change at Merrimack Commons mismatches messages and channels in both directions. Complicated information about how a resident is doing today travels in hurried hallway exchanges without a shared record, which is rich but unreliable, or on a printed list of names and room numbers, which is reliable but empty. The message about Mrs. Okafor needed both: a conversation in which Lena could ask what "unsteady" meant and a written note that would survive a change in assignment.

What this page is doingApplies media richness theory.
5

The Group Text

Over the past year, the aides have built a private group text to swap shifts and warn each other about difficult evenings. It has become the real report. Aides post short notes such as "Rm 14 grumpy today" and "12 refused dinner." The channel is fast and trusted, but it is lean, it excludes the four newest aides, who were never added, and it leaves no record the nurses can see. Lena joined Merrimack Commons six weeks ago and is not in the group. Grace said afterward that she would normally have posted about Mrs. Okafor but was too busy that afternoon.

What this page is doingExamines an unofficial channel.
6

Why Aides Stopped Speaking Up

Morrison and Milliken (2000) described organizational silence, the habit of a whole workforce keeping quiet about problems it can see, and traced it partly to managers' beliefs that employees cannot be trusted with decisions and that disagreement is unhealthy, and reinforced when speaking up seems futile or risky. Interviews with nine evening aides found that most had raised concerns about the handoff over the past two years, asking for time to talk at shift change and for the list to include notes. Nothing changed, and some were told they were "complaining about the schedule." Detert and Burris (2007), surveying staff and managers across a large restaurant chain, found a manager's openness consistently tied to whether staff raised ideas and problems, mostly because an open manager made raising a hand feel low-risk for the aides of that chain. The aides' silence about the handoff was learned. When they stopped expecting anyone to listen, they built their own channel instead.

What this page is doingApplies research on silence and voice.
7

What Worked

The analysis also found things that worked. Grace noticed the problem and acted on it at once, helping Mrs. Okafor sit and telling another aide. The group text shows that aides want to share information and will do it without being told. And the nurse's note was accurate and timely. The breakdown happened in the space between these good actions, which is the space a supervisor controls. That matters for how the recommendations are presented to the aides: they are a repair to the system, not a judgment on anyone who worked that day.

What this page is doingNotes strengths to keep.
8

Recommendations

Changes, owners and checks

ChangeWhoHow it addresses the failureCheck after 60 days
Fifteen-minute overlap, 2:50 to 3:05 p.m., with a walking handoff at each resident's door for any changeEvening supervisor; schedulerGives a rich, two-way channel at the moment it is neededAudit 20 handoffs a week
A written change log on the unit tablet: one line per resident whose condition, medications or mobility changedDay and evening aides; day nurseCreates a record that survives a change in assignmentLog entries for every medication change
Nurse flags any medication change that can affect balance or alertness on the logDay nurseLinks the clinical record to what aides seeFlags on 100% of relevant changes
Weekly ten-minute huddle, one question: what got in your way this week?Evening supervisorRestores voice by acting visibly on what aides raiseTwo changes made from huddle ideas per month
Add all aides to an official shift group, with no clinical details in textsEvening supervisorKeeps the speed of the group text without excluding new staffAll 16 evening aides included
What this page is doingProposes specific changes.
9

Conclusion

Mrs. Okafor's fall was not caused by a careless aide. It was caused by a handoff that relied on hallway luck, a lean list, an unofficial channel that excluded newcomers and a history of ignored suggestions that taught aides to stop asking. The recommendations match each message to a channel that can carry it and give the aides a reason to speak up again: a supervisor who listens and changes something they can see.

What this page is doingSummarizes the finding.
10

References

Daft, R. L., & Lengel, R. H. (1986). Organizational information requirements, media richness and structural design. Management Science, 32(5), 554-571. https://doi.org/10.1287/mnsc.32.5.554

Detert, J. R., & Burris, E. R. (2007). Leadership behavior and employee voice: Is the door really open? Academy of Management Journal, 50(4), 869-884. https://doi.org/10.5465/amj.2007.26279183

Morrison, E. W., & Milliken, F. J. (2000). Organizational silence: A barrier to change and development in a pluralistic world. Academy of Management Review, 25(4), 706-725. https://doi.org/10.5465/amr.2000.3707697

What the OL 125 Module 2 instructions ask for

The Module 2 assignment in OL 125 usually asks you to analyze a communication problem in a workplace and recommend improvements. Expect to describe a specific incident or pattern, explain how the message was sent and received and identify where it broke down, whether in the channel, the sender, the receiver, the timing or the climate. Strong papers apply communication concepts such as channel richness, listening and feedback, consider whether employees feel safe raising concerns and recommend changes concrete enough that someone could put them in place next week. They avoid concluding only that people should communicate better, and they explain why the recommended channel suits the message.

How this OL 125 Module 2 communication analysis assignment example is built

The sample analyzes a fall at Merrimack Commons, a composite assisted living community in Concord, New Hampshire. At the 3 p.m. shift change, a day aide mentioned in a hallway that Mrs. Okafor had been unsteady after a medication change; the evening aide never heard it, and Mrs. Okafor fell that night. The paper traces the failure to rushed verbal handoffs, a private group text that had replaced the written report and aides who no longer raised concerns. Daft and Lengel's media richness theory, Morrison and Milliken on organizational silence and Detert and Burris on manager openness support recommendations for a bedside handoff, a written change log and a weekly huddle.

Where the OL 125 Module 2 rubric puts the points

Graders of OL 125 communication analyses generally look for a clear account of the incident, accurate identification of where and why the message failed, correct use of communication concepts, attention to climate and employee voice, practical recommendations and organized writing with sources. The best papers follow the message step by step from sender to receiver and match each kind of message to a suitable channel. Papers lose marks for blaming one person, describing the problem without analyzing it, recommending more meetings or emails without explaining why they would work or ignoring why employees had stopped speaking up in the first place.

OL 125 Module 2 help: the mistakes that cost points

Choose one incident or recurring problem and describe it step by step: who knew what, how they passed it on, who should have received it and what happened. Identify each point where the message could have failed. Then ask why. Was the channel too thin for a complicated or urgent message? Was there no time to ask questions? Had people stopped speaking up because nothing changed? Use research on channels and employee voice to explain the pattern. Recommend specific changes, such as a structured handoff or a regular huddle, and explain how each addresses a failure point. Say who will do what, and how you will know it worked. Keep names out of the analysis unless the instructions ask for them.

Get OL 125 Module 2 written to your instructions

Share the OL 125 Module 2 directions and the communication problem you are examining. We trace how the message traveled and where it failed, match messages to the right channels, look at whether employees feel able to speak up and recommend specific changes, with research behind each point. Your first OL 125 analysis is written free, usually within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 125 papers and related BS Business Administration samples

OL 125 Module 2 questions, answered

Where can I find a free OL 125 Module 2 communication analysis sample?

This page includes the full OL 125 Module 2 analysis of a missed handoff and a resident's fall at a composite assisted living community.

What is media richness theory?

Daft and Lengel's proposal that a phone call, an email and a face-to-face talk carry different amounts of meaning, so complicated or uncertain messages need rich channels such as face-to-face conversation.

What is organizational silence?

A pattern in which employees collectively hold back information about problems, often because they believe speaking up is useless or risky.

How can supervisors encourage employees to speak up?

Research found that employees spoke up more when managers were open to their ideas and acted on them, which made speaking up feel safe.

What makes a good shift handoff?

A structured exchange, ideally at the bedside or workstation, covering changes and risks, with time for questions and a written record.