MKT 225 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 225 Module 4 Discussion sample asks whether a small business should pay for search ads on its own name, and how it can tell whether any search ad works. SNHU MKT 225 (MKT-225) turns to paid search and measurement at this point in the BS Marketing course. The post follows Agate Bay Sauna Company, a composite Duluth business, after an eight-week test in which it switched off its brand ads every other week. It reports what happened to bookings, explains the result with large field experiments on paid search and research on ad position and measurement and recommends where the money should go instead.

CourseMKT 225 Digital Marketing
ModuleModule 4
Paper typeundergraduate discussion post on paid search, brand keywords and measuring ad effectiveness
LengthAbout 370 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 225 Module 4

1

Module Four Discussion

Eight Weeks Without Paying for Our Own Name

In the audit for Agate Bay Sauna Company, the composite Duluth business I am following, we found that $840 of its $1,200 monthly search ad budget bought clicks on its own name. So for eight weeks this fall we switched brand ads off every other week and left everything else alone. In the four weeks with brand ads, bookings that came through search, paid and free together, totaled 412. In the four weeks without them, they totaled 405. Normal week-to-week swings are larger than that seven-booking gap, and the company saved $1,680.

What this page is doingWhat we tested.
2

Blake et al. (2015) ran large field experiments at eBay and found that ads on brand keywords had no measurable short-term benefit, because people searching for eBay simply clicked the free result; for generic keywords, ads helped new and infrequent users but much of the spending reached frequent users who would have bought anyway. Agate Bay's brand searchers are much the same: they already know the name. Ghose and Yang (2009) found that conversion rates in sponsored search are highest at the top of the page and fall lower down, which matters because our generic ads, the ones that could reach newcomers, run in low positions on thin bids. Lewis and Rao (2015), after 25 large advertising experiments, concluded that ad returns are very hard to measure because individual purchases vary so much; our eight-week test is small, so I treat it as a strong hint, not proof.

What this page is doingWhy the ads did so little.
3

Move the $840 into generic terms such as "sauna Duluth" and "things to do in Duluth in winter," bid for top positions on a few of them and send those clicks to a fast first-timer page rather than the home page. Keep a small brand budget only if a competitor starts bidding on our name. Then test the generic ads the same way, on and off by week, and report the result in bookings rather than clicks, since a click on a generic ad by someone who never books costs us money and fills nothing.

What this page is doingWhat I would do.
4

Can you think of a case where paying for your own name is worth it, and how would you prove it to an owner who has just seen this test?

What this page is doingQuestion.
5

References

Blake, T., Nosko, C., & Tadelis, S. (2015). Consumer heterogeneity and paid search effectiveness: A large-scale field experiment. Econometrica, 83(1), 155-174. https://doi.org/10.3982/ECTA12423

Ghose, A., & Yang, S. (2009). An empirical analysis of search engine advertising: Sponsored search in electronic markets. Management Science, 55(10), 1605-1622. https://doi.org/10.1287/mnsc.1090.1054

Lewis, R. A., & Rao, J. M. (2015). The unfavorable economics of measuring the returns to advertising. Quarterly Journal of Economics, 130(4), 1941-1973. https://doi.org/10.1093/qje/qjv023

What the MKT 225 Module 4 instructions ask for

The Module 4 discussion in MKT 225 often asks you to explain search engine marketing, including the difference between organic search and paid search, and to discuss how businesses decide what to bid on and how they measure results. Some prompts mention keywords, quality, cost per click or return on ad spend. A strong post uses a concrete account with real or realistic numbers, distinguishes brand from generic keywords, explains why a click is not the same as a sale the ad caused and uses research from controlled experiments rather than platform claims. It ends with a recommendation and a way to test it, since measurement is the theme the rest of the course returns to.

How this MKT 225 Module 4 discussion example is built

In the sample, Agate Bay Sauna Company spends $1,200 a month on search ads, $840 of it on its own name. Over eight weeks it switched brand ads off in alternate weeks. Search-driven bookings were 412 in the weeks with brand ads and 405 in the weeks without, a gap well within normal weekly swings, because people searching the name clicked the free listing instead. The post explains the result with Blake, Nosko and Tadelis's eBay experiments, in which brand keyword ads showed no measurable short-term benefit, adds Ghose and Yang on position and conversion and Lewis and Rao on how hard ad returns are to measure, and recommends shifting the money to generic terms.

Where the MKT 225 Module 4 rubric puts the points

Paid search discussions are commonly graded on accurate explanation of organic and paid search, the distinction between brand and generic keywords, the quality of the measurement reasoning, use of research and replies. Strong posts present numbers, separate correlation from causation in ad results, cite experimental evidence and offer a practical test. Credit drops for posts that equate clicks with sales caused by the ad, for repeating platform marketing claims, for recommendations without a way to check them and for replies limited to agreement. A sentence on when a brand ad might still make sense, such as when a competitor bids on your name, shows balanced judgment. Readers value posts that report a test, even a small one.

MKT 225 Module 4 help: the mistakes that cost points

Find out what the business spends on search ads and which keywords take the money. Separate brand terms, which people search because they already know the business, from generic terms, which reach new customers. Ask what would have happened without the ad: would the person have clicked the free listing? A simple test, turning ads off in alternate weeks or regions, can answer that roughly. Use one or two experimental studies to support your reasoning. Recommend where to move the money and how to check the result. Keep numbers in the post, since they make the argument. Ask peers when they would still buy brand ads, because the answer depends on competition.

Get MKT 225 Module 4 written to your instructions

Post the MKT 225 Module 4 prompt and what the business spends on search ads. We explain brand and generic keywords, design or interpret a simple on-and-off test, apply the research on paid search returns and end with a question that tests classmates' assumptions. A first post is free and turns around in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 225 papers and related BS Marketing samples

MKT 225 Module 4 questions, answered

Where can I find a free MKT 225 Module 4 Discussion sample?

The full MKT 225 Module 4 post is published here, testing whether a sauna company's ads on its own name add any bookings.

What is the difference between brand and generic keywords?

Brand keywords include the company's own name and reach people who already know it; generic keywords describe the product or need and reach people who may not.

Do brand keyword ads increase sales?

Large field experiments at eBay found brand keyword ads had no measurable short-term benefit, because searchers clicked the free listing instead.

How can a small business test whether search ads work?

Turn ads off and on in alternate weeks or areas, compare bookings or sales, and treat small differences with caution because weekly sales vary.

Why are advertising returns hard to measure?

Individual sales vary so much relative to ad spending that very large experiments are often needed to detect an effect with confidence.