| Course | OL 125 Human Relations in Administration |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate milestone analyzing a workplace conflict and teamwork problem and planning how a supervisor will address it |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 125 Module 5
Day Shift, Evening Shift and the Blame Between Them: A Conflict and Teamwork Plan for Merrimack Commons
[Student Name]
Southern New Hampshire University
OL 125: Human Relations in Administration
Milestone Two: Conflict and Teamwork Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Day Shift, Evening Shift and the Blame Between Them: A Conflict and Teamwork Plan for Merrimack Commons
Introduction
The first milestone showed evening turnover at Merrimack Commons feeding on unequal assignments, unnoticed effort, ignored concerns and fatigue. One part of that cycle is a conflict I have lived inside for six years: the feud between day and evening aides. This milestone analyzes the conflict, explains it with research and plans how I will address it as evening supervisor, working with the day supervisor.
The Conflict From Both Sides
Day aides say the evening shift leaves residents unprepared: hearing aids not charged, clothes not laid out, residents put to bed late and therefore hard to wake. Evening aides say the day shift leaves them the work it did not finish: baths scheduled for the day but not done, laundry left in machines and charting incomplete, so evening aides spend their first hour catching up. Both are partly right. A two-week log kept by both supervisors found that 23 percent of scheduled day baths were moved to evenings and that evening aides left 31 percent of morning preparation tasks undone.
When It Turned Personal
The dispute has spread beyond tasks. Aides leave anonymous notes on the break room board ("Some of us actually work"). Two formal complaints were filed this year, each accusing an aide on the other shift of rudeness at handoff. New aides are warned within their first week about which day aides "dump" on evenings. Three of the ten evening aides who left in the past year mentioned the day shift in conversations with me.
Task Conflict and Relationship Conflict
Jehn (1995), studying work groups in a large freight company, separated arguments over the work itself, such as who should do a task or how, from personal friction and dislike between members, and found that the personal kind hurt both how satisfied members were and how well the group performed, whereas arguing over the work could actually help groups whose tasks were complex and far from routine. De Dreu and Weingart (2003), combining results from many studies, found that both kinds of conflict were on average associated with lower team performance and member satisfaction, and that task conflict was most harmful when it occurred alongside relationship conflict. The conflict here began as a task dispute, about which shift owns baths, laundry and morning preparation, and has become a relationship conflict. The research suggests that it will not settle on its own and that the task questions must be resolved before relationships can recover.
Why It Keeps Going
The conflict persists because of how the work is set up. No written agreement says which shift owns which tasks. The 3 p.m. handoff is rushed, so aides rarely speak face to face. The day and evening supervisors had not met as a pair in a year. And each shift experiences only the other's leftovers, never its pressures, which makes every unfinished task look like a choice rather than a consequence: day aides do not see an evening with three call-outs, and evening aides do not see a morning with four physician visits and a fire drill.
Psychological Safety
Edmondson (1999), who followed several dozen teams inside one manufacturer, reported that teams whose members trusted they would not be punished or mocked for speaking up were the ones that learned openly, seeking help and talking through errors, and that teams learning this way performed better. At the 3 p.m. handoff, neither shift feels safe admitting that it fell behind, because admitting it hands the other side ammunition. Aides hide unfinished work rather than report it, which is how residents end up with uncharged hearing aids and missed baths. Any plan must make it safe to say, "We didn't get to it, and here's why."
The Plan
Conflict and teamwork plan
| Step | Owner | When | What it addresses |
|---|---|---|---|
| Joint meeting of day and evening supervisors to draft a task split | Both supervisors | Week 1 | No written ownership of tasks |
| Task split reviewed by aides from both shifts in two mixed groups; changes made | Supervisors with four aides from each shift | Weeks 2 to 3 | Fairness and buy-in |
| Fifteen-minute overlap with a joint huddle at 2:50 p.m.: what was finished, what was not and why | Both supervisors | From week 4 | Rushed handoff; safety to admit unfinished work |
| Rule for the huddle: no blame for unfinished work that is reported; unreported work is the issue | Both supervisors | From week 4 | Psychological safety |
| Dispute process: an aide raises a handoff problem with her supervisor, who meets the other supervisor within 48 hours | Both supervisors | From week 4 | Notes and complaints as the only outlet |
| Shadow shifts: each aide spends two hours on the other shift once a year, paid | Scheduler | Months 2 to 6 | Each shift sees only the other's leftovers |
| Remove the anonymous board; replace with a suggestion box both supervisors read weekly | Both supervisors | Week 4 | Personal attacks |
Measures
The supervisors will repeat the two-week task log at three and six months, aiming to cut moved baths from 23 percent to under 10 percent and undone morning preparation from 31 percent to under 10 percent. Formal complaints about handoff should fall to zero. A three-question survey of both shifts at six months will ask whether handoffs are respectful, whether it is safe to report unfinished work and whether the task split is fair, with a target of 75 percent agreement on each.
Conclusion
The feud between shifts is not a clash of personalities. It is what happens when two groups share work without agreeing who owns it, meet only in a rushed hallway and can win only by blaming each other. The plan fixes the structure first, in writing and with both shifts at the table, makes it safe to report what was not done and gives the shifts a fair way to settle problems. It will become one part of the final human relations improvement plan, and its measures will be reported alongside the turnover and call-out figures so that the two supervisors can see whether better teamwork is helping aides stay.
References
De Dreu, C. K. W., & Weingart, L. R. (2003). Task versus relationship conflict, team performance, and team member satisfaction: A meta-analysis. Journal of Applied Psychology, 88(4), 741-749. https://doi.org/10.1037/0021-9010.88.4.741
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Jehn, K. A. (1995). A multimethod examination of the benefits and detriments of intragroup conflict. Administrative Science Quarterly, 40(2), 256-282. https://doi.org/10.2307/2393638
What the OL 125 Module 5 instructions ask for
In OL 125, Milestone Two typically centers on a conflict or teamwork problem connected to your workplace issue and plan how to address it. Expect to describe the conflict, the people or groups involved and its effects, analyze its sources and types, apply research on conflict and teams and propose specific steps. Strong milestones distinguish disagreement about tasks and processes from conflict about relationships, identify the structural causes that keep the conflict going, consider whether people feel safe raising problems and plan interventions with owners, timing and measures. They avoid assuming that a single team-building event will repair a conflict rooted in how work is divided.
How this OL 125 Module 5 milestone two example is built
The sample analyzes the conflict between day and evening aides at Merrimack Commons, a composite assisted living community in Concord, New Hampshire. Day aides say evening aides leave residents unprepared for breakfast; evening aides say day aides leave baths, laundry and charting unfinished. The blame has turned personal, with notes left on the break room board and two formal complaints. Jehn's research on task and relationship conflict, De Dreu and Weingart's meta-analysis showing both kinds harm team performance and Edmondson's work on psychological safety support a plan with a written task split agreed by both shifts, a joint ten-minute huddle at handoff, a fair dispute process and measures for each step.
Where the OL 125 Module 5 rubric puts the points
The second OL 125 milestone usually earns its marks through a clear account of the conflict and its effects, analysis of its types and sources, accurate use of research on conflict and teamwork, a practical plan with owners and timing, measures of success and organized writing with sources. The best submissions show how the way work is divided creates the conflict and fix that first. Submissions lose credit for treating the conflict as a personality clash, proposing only a team-building event, taking one side's account as fact, overlooking whether people feel safe speaking up or offering steps without a way to tell whether they worked.
OL 125 Module 5 help: the mistakes that cost points
Describe the conflict from each side's point of view, using what people actually say and do. List the specific disputes and sort them: which are about tasks, processes or resources, and which have become personal? Look for structural causes, such as unclear task ownership, overlapping duties or schedules that keep groups apart. Use research on conflict and teams to explain the pattern and to judge whether any of the disagreement is useful. Consider whether people can raise problems safely. Then plan steps that address the structure first and relationships second, each with an owner and date. Choose measures, such as complaints, unfinished tasks or survey results, to show progress. Listen to each side separately before bringing them together.
Get OL 125 Module 5 written to your instructions
Send the brief for Milestone Two in OL 125 and a description of the conflict at your workplace. We sort disagreements about tasks from conflict that has turned personal, explain both with research, and plan the agreements, meetings and processes a supervisor can put in place, with measures. Your first OL 125 conflict milestone is free and usually ready within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 125 papers and related BS Business Administration samples
- OL 125 Module 1 Discussion: Why Human Relations Matter
- OL 125 Module 2 Communication Analysis Assignment: Communication Breakdown at Shift Change
- OL 125 Module 3 Milestone One: Human Relations Problem Analysis
- OL 125 Module 4 Discussion: What Motivates Employees
- OL 125 Module 6 Diversity and Inclusion Assignment: Diversity and Inclusion on a Work Team
- OL 125 Module 7 Final Project: Human Relations Improvement Plan
- OL 125 Module 8 Discussion: Reflecting on Human Relations Skills
- QSO 450 Module 4 Discussion: Private Fleet or Dedicated Carriage?
- ACC 202 Module 2 Project Milestone One: A candle maker's cost formula
- OL 328 Module 8 Discussion: How Leaders Develop
- OL 322 Module 8 Discussion: Sustaining Change
OL 125 Module 5 questions, answered
Where can I find a free OL 125 Module 5 Milestone Two sample?
The complete OL 125 Milestone Two on this page analyzes a feud between day and evening aides at a composite assisted living community and plans how to fix it.
What is the difference between task and relationship conflict?
Task conflict means arguing over the work itself, for instance which shift owns baths; relationship conflict involves personal friction, tension and dislike between people.
Is task conflict good for teams?
Some research found it could help on complex, nonroutine tasks, but a meta-analysis found both task and relationship conflict were on average linked to lower team performance and satisfaction.
What is psychological safety?
The shared sense on a team that people will not be punished or embarrassed for admitting mistakes or raising concerns, which research links to team learning and performance.
How do supervisors resolve conflict between shifts?
By clarifying who owns each task, bringing the groups together at handoff, creating a fair process for disputes and measuring whether problems decline.