| Course | OL 328 Leadership |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post reflecting on how leaders develop and what the writer will do to keep developing |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 328 Module 8
Module Eight Discussion
What Actually Made Me a Better Manager
In Module 1 I asked whether my predecessor was "a natural leader" and whether I was one. A year into the job and eight modules later, I think the question was mostly the wrong one, though not entirely.
Arvey et al. (2006) compared identical and fraternal male twins and put the inherited share of differences in holding leadership positions at work at roughly 30 percent. That is real, and it fits the sense that some people step forward more easily. But it also means that most of the variation came from something else. Avolio et al. (2009) gathered 200 experimental and quasi-experimental studies in which leadership was deliberately trained or manipulated and found that participants had roughly a two-in-three chance of a better outcome than comparison groups, with results that varied by the type of program. Dragoni et al. (2009), using ratings from several sources on early-career managers, found that the developmental quality of their assignments predicted their competence beyond how long they had been managers, and that people with a stronger drive to learn were more likely to end up in those assignments.
The first was hearing, after the fact, how Jamal at the circulation desk and our assistant manager handled the reading-room overdose while I sat in a meeting across town. Neither waited for me, and together they did it better than I would have. The second was my first week away while a department head ran the branch, which showed me how many decisions I had been making out of habit rather than need. The third was a one-on-one in which a circulation clerk told me that my quick fixes made her feel I did not trust her. Each was uncomfortable, and each changed something I do.
Through next spring I am marking a card at the desk each time I hear a colleague's proposal before offering mine, and my coach and I go over the marks every other week. I also want to take on one assignment outside my comfort zone, so I have asked to co-lead the system's review of weekend security staffing.
Which single experience, at work or elsewhere, did the most to change how you lead, and what do you do differently because of it?
References
Arvey, R. D., Rotundo, M., Johnson, W., Zhang, Z., & McGue, M. (2006). The determinants of leadership role occupancy: Genetic and personality factors. The Leadership Quarterly, 17(1), 1-20. https://doi.org/10.1016/j.leaqua.2005.10.009
Avolio, B. J., Reichard, R. J., Hannah, S. T., Walumbwa, F. O., & Chan, A. (2009). A meta-analytic review of leadership impact research: Experimental and quasi-experimental studies. The Leadership Quarterly, 20(5), 764-784. https://doi.org/10.1016/j.leaqua.2009.06.006
Dragoni, L., Tesluk, P. E., Russell, J. E. A., & Oh, I.-S. (2009). Understanding managerial development: Integrating developmental assignments, learning orientation, and access to developmental opportunities in predicting managerial competencies. Academy of Management Journal, 52(4), 731-743. https://doi.org/10.5465/amj.2009.43669936
What the OL 328 Module 8 instructions ask for
The final OL 328 discussion asks students to reflect on how leaders develop, often by revisiting the born-or-made question from Module 1 with a term's worth of research behind them. You will explain what the evidence says about where leadership comes from, describe the experiences that have shaped your own leadership or the leader you studied and say what you will do to keep growing. The prompt rewards honesty: naming a mistake and what it taught is worth more than a list of strengths. Good posts connect each claim about development to a study and to a specific episode, and they avoid treating any single influence, whether genes, training or experience, as the whole story. Replies should push classmates to describe an experience rather than a lesson in general terms.
How this OL 328 Module 8 discussion example is built
The sample comes from the Eastside Branch's new manager, a composite librarian who was promoted to lead former peers at a busy Ohio library branch. It returns to her Module 1 question about natural leaders with three studies: a study of male twins that traced roughly three tenths of the differences in who held leadership roles to inherited factors, a review of 200 intervention studies showing that deliberate leadership development usually works, and a study of early-career managers showing that demanding assignments built competence beyond what tenure explained. She then names three moments that taught her the most, including learning how two colleagues handled a reading-room overdose without her, and closes by asking classmates which single experience changed how they lead.
Where the OL 328 Module 8 rubric puts the points
Instructors grading the closing OL 328 discussion usually look for an accurate summary of research on leader development, honest reflection tied to specific experiences, a clear link back to earlier modules, a concrete statement of what the writer will do next and replies that draw out classmates' experiences. The best OL 328 reflections report research with its limits, so a heritability figure is not read as destiny and a training effect is not read as a guarantee. Credit is lost when a post lists course topics without reflection, claims growth without an example, treats leadership as fixed after all, or replies with agreement alone. A one-line plan such as "keep learning" also tends to score low against the rubric's next-steps criterion.
OL 328 Module 8 help: the mistakes that cost points
Reread your Module 1 post before writing this one, since the strongest reflections show how your view changed and why. Pick two or three studies on where leadership comes from and summarize each in a sentence you could defend, including what it did not find. Then choose specific experiences from the term or your career and say what each taught you in behavioral terms, such as "I now ask before I answer," not "I learned patience." Name one development step for the coming half year and the sign that would tell you it succeeded. Keep the tone reflective but concrete. Close by inviting classmates to share one experience of their own, and in replies ask a follow-up about what they did differently afterward.
Get OL 328 Module 8 written to your instructions
Tell us about the leader or the role you have followed in OL 328 and paste the Module 8 prompt. We draft a closing reflection that weighs research on how leaders develop, names the experiences that mattered in your case and closes by inviting OL 328 classmates to compare it with their own careers. Your first OL 328 reflection costs nothing and typically lands in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 328 papers and related BS Business Administration samples
- OL 328 Module 1 Discussion: What Leadership Is
- OL 328 Module 2 Leadership Self-Assessment Assignment: Leadership Self-Assessment
- OL 328 Module 3 Milestone One: Leadership Challenge Analysis
- OL 328 Module 4 Discussion: Gender and Leadership
- OL 328 Module 5 Milestone Two: Leadership Approach Plan
- OL 328 Module 6 Crisis Leadership Assignment: Leading Through a Crisis
- OL 328 Module 7 Final Project: Leadership Development Plan
- BUS 206 Module 8 Discussion: Legal to Fly, Right to Fly?
- HRM 300 Module 7 Final Project: An Employee Experience Strategy for Tidewater
- QSO 440 Module 6 Discussion: An Ice Storm Takes Every Line Crew
- PSY 270 Module 1 Roles of the I/O Psychologist Essay: An I/O psychologist at a farm
OL 328 Module 8 questions, answered
Where can I find a free OL 328 Module 8 Discussion sample?
The full OL 328 Module 8 reflection is on this page: a composite library branch manager weighs research on how leaders develop and names the experiences that taught her most.
Is leadership genetic?
A study of twins estimated that genes explained about 30 percent of the differences in whether people held leadership roles, which leaves most of the variation to experience and environment.
Does leadership development actually work?
A review of 200 experimental and quasi-experimental studies found that leadership interventions gave participants about a two-in-three chance of a positive outcome, compared with even odds by chance alone.
What kind of experience develops leaders most?
Assignments that stretch people, such as leading a change or a team in difficulty, tend to build more competence than time on the job, especially for people eager to learn.
How should I write a leadership reflection post?
Tie each lesson to a specific episode, describe what you now do differently and connect it to a study, then close with one concrete next step.