OL 328 Module 7 Final Project Example

Reviewed by Portia Lambrick, MBA

This OL 328 Module 7 Final Project sample is a complete leadership development plan for a leader and the team around her. SNHU OL 328 (OL-328) uses the plan to close its BS Business Administration leadership course, pulling together the self-assessment, the leadership challenge, the shared leadership approach and the crisis analysis. The leader is the new manager of the Eastside Branch, a composite Ohio library branch that lost the one person it relied on. The plan sets development goals for her, builds stretch roles and training for four department heads, adds coaching, repeats the 360 survey with written goals, names successors and sets a budget and measures.

CourseOL 328 Leadership
ModuleModule 7
Paper typeundergraduate final project presenting a leadership development plan for a leader and a team, built from the course milestones and assignments
LengthAbout 1,640 words, 8 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 328 Module 7

1

Leadership That Outlasts the Manager: A Development Plan for the Eastside Branch

[Student Name]

Southern New Hampshire University

OL 328: Leadership

Final Project: Leadership Development Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingRiverbend's Eastside Branch, its people and every score, cost and date below are invented to illustrate the OL 328 final project.
2

Leadership That Outlasts the Manager: A Development Plan for the Eastside Branch

Introduction

A year ago the Eastside Branch said goodbye to a manager who had run it for 23 years, and I was promoted from the children's room to take her place. This course has made one thing plain: the branch did not lose a leader so much as it lost its only source of leadership. My 360 survey, the analysis of the branch's problem, the shared leadership approach and the review of the reading-room incident each point in the same direction. This plan sets out how I will develop as a leader and, just as important, how the branch will develop leaders other than me, so that the next departure or the next emergency does not leave staff waiting for someone to arrive.

What this page is doingStates the purpose of the plan.
3

Revisions From Instructor Feedback

Three comments shaped this version. On the self-assessment, my instructor asked whether my low score on empowering others came from habit or from a lack of trust in particular staff; after reflection I think it is habit, and the plan treats it as a behavior to practice. On Milestone One, the comment asked for the voices of newer staff, so the plan now includes a newer-staff representative on the safety response team. On Milestone Two, the instructor questioned whether the targets were achievable in a year; I have kept the turnover target but moved the safety rating target to eighteen months.

What this page is doingShows what changed after grading.
4

The Leader and the Setting

The branch serves about 1,400 visitors a day with 22 staff and roughly 15 regular volunteers. The 360 survey I took in my first month showed a manager whom staff trust and find approachable but who, in their words, "fixes things before we finish describing them." Staff rated me highest on helping people grow and on behaving ethically and lowest on empowering others and putting them first, with the widest gap between my own view and theirs on empowering. A second survey found my working relationships far warmer with my old children's and teen colleagues than with circulation staff, who handle the hardest encounters at the desk and most need to feel trusted.

What this page is doingSummarizes the assessment.
5

The Challenge in Brief

In the predecessor's last year, turnover nearly doubled, reported safety incidents rose by about 60 percent and the share of staff who said they knew what was expected of them fell by twenty points. Staff described a branch where everyone waited for the manager to come, because no one else had the authority, the training or the habit of stepping forward. The grant-funded makerspace, now weeks from opening, will bring machines, programs and hazards outside every staff member's experience.

What this page is doingRestates the problem.
6

The Chosen Approach

Milestone Two settled on servant leadership for my own conduct and shared leadership for the branch's structure. In practice that means short daily huddles, monthly one-on-ones, a weekly shift at the busiest desk, debriefs after serious incidents and protected training time, alongside a weekly leadership team of department heads with real authority, a safety response team and two staff-chosen makerspace leads. The crisis assignment added prepared procedures, naloxone at each service desk, a clear rule that the senior person on site leads until the manager arrives and same-day care for staff afterward. What those pieces lack is a deliberate way of growing the people expected to lead, which is the work of this plan.

What this page is doingSummarizes the leadership model.
7

Development Activity One: The Acting-Manager Rotation

Each department head will serve one week per quarter as acting manager while I work from the system office or take the closing desk. During that week the acting manager runs the huddles, approves schedule changes, leads any incident response and signs off on the week's decisions. DeRue and Wellman (2009), following 60 managers through 225 job experiences, found that more challenging experiences built more leadership skill only up to a point, after which the gains flattened, and that the flattening was offset when the person had access to feedback. The rotation is therefore paired with a 30-minute review on the following Monday, using three questions agreed in advance: which decision was hardest, what would you do differently and what support was missing. A second department head attends each review, so the four learn from each other's weeks as well as their own.

What this page is doingUses real experience with feedback.
8

Development Activity Two: Incident Leadership Training

All staff who may become the senior person on site, currently eleven people, will complete four 90-minute sessions held a month apart in the branch's meeting room. Each session includes a short briefing from the county crisis team, a rehearsal of one scenario drawn from our own incident log and a debrief. Lacerenza et al. (2017), pooling 335 samples, reported that leadership training produced meaningful gains in on-the-job behavior and that programs did better when they began by diagnosing what participants actually lacked, used practice rather than lecture alone, were delivered on site and were spread across several sessions. Our design follows those features deliberately: the scenarios come from the branch's own records, the practice happens in the rooms where incidents occur and the sessions are spaced so people try skills between them.

What this page is doingDesigns training that transfers.
9

Development Activity Three: Coaching for the Manager

The library system offers six months of external coaching to new managers, and I will use it, meeting every two weeks by video. The coaching will focus on one behavior: letting staff finish describing a problem and asking what they would do before offering my view. Theeboom et al. (2014), combining coaching studies conducted inside organizations, reported gains on every outcome group they examined, from skills and well-being to attitudes toward work, and the biggest gain was in people's ability to set goals and steer their own behavior toward them. Self-regulation is the point here: the habit I am trying to break shows up in the moment, so the coaching will use a simple tally I keep at the desk and review with the coach.

What this page is doingAddresses the empowering gap.
10

Development Activity Four: A Second 360 With Written Goals

I will repeat the same 360 survey at the twelve-month mark. Smither et al. (2005), reviewing 24 longitudinal studies, found that ratings from direct reports, peers and supervisors usually improved only slightly after multisource feedback, and that improvement was more likely when recipients accepted the need to change, set specific goals and took concrete action. A survey by itself is not a development plan. Within two weeks of each round, I will share a one-page summary with staff, name two goals and list the actions behind them, and the department heads will be invited to do the same with their own upward feedback, which the system has agreed to collect for them for the first time.

What this page is doingTurns feedback into change.
11

Building a Bench

By the end of eighteen months, at least two department heads should be ready to act as branch manager for a month, which is the test of whether the branch is still exposed. The assistant manager, who already leads the safety response team, and the adult services head have asked for that path; both will take the system's supervisory certificate, and each will lead one branch-wide project, the makerspace launch and the volunteer program redesign. The other department heads have said they prefer to stay in their current roles, and the plan respects that: the bench needs depth, not everyone on it.

What this page is doingPlans for succession.
12

Measures

Leadership development measures

MeasureBaselineTargetWhen checked
Annual staff turnover27%15% or lower12 months
Staff who say they know what is expected63%80%12 months
Staff who say they feel safe at work52%70%18 months
Serious incidents led by someone other than the managerNot tracked until nowAt least 3 in 4Quarterly log
Manager's 360 rating on empowering others (7-point scale)4.15.012 months
Staff other than the manager rated ready to run the branch for a month0218 months
What this page is doingDefines what success looks like.
13

Timeline and Cost

In months one to three, the first acting-manager rotations begin, coaching starts and the first two training sessions run. In months four to six, the remaining sessions run, the makerspace opens under its staff-chosen leads and the first quarterly incident review compares who led each response. In months seven to twelve, the second round of rotations completes, the repeat 360 is taken and the goals are published. Months thirteen to eighteen focus on the two bench candidates.

First-year cost

ItemCost
Staff time for training sessions (11 people, 4 sessions, with backfill)$7,900
County crisis team presenter fees$1,200
Supervisory certificate tuition for two bench candidates$3,400
Repeat 360 survey licenses for manager and four department heads$900
Backfill hours during acting-manager weeks$1,200
External coaching$0 (paid by the system)
Total$14,600

The amount comes from the branch's training line, with $3,400 requested from the system's leadership fund for the certificates.

What this page is doingSequences and budgets the plan.
14

Risks and Limits

Three risks stand out. Staff already stretched by difficult afternoons may experience extra roles as more work, so rotations and training replace other duties rather than adding to them, and the leadership team will review workload each quarter. The system may promote a trained department head to another branch; that would be a loss for Eastside but a gain for Riverbend, and the bench is meant to absorb it. Finally, many measures here are survey ratings, which can shift with mood or a single bad week, so they are read alongside harder numbers such as turnover and the incident log rather than alone.

What this page is doingAdmits what could go wrong.
15

Conclusion

The former manager was loved because she always came. The aim of this plan is a branch where staff are confident because they know someone capable is already there, and where that someone is not always me. My development goals are narrow and observable, and the development of others carries equal weight. If the plan works, the measure that matters most will be a quiet one: an afternoon emergency handled well, reported the next morning, by people who did not wait.

What this page is doingCloses the plan.
16

References

DeRue, D. S., & Wellman, N. (2009). Developing leaders via experience: The role of developmental challenge, learning orientation, and feedback availability. Journal of Applied Psychology, 94(4), 859-875. https://doi.org/10.1037/a0015317

Lacerenza, C. N., Reyes, D. L., Marlow, S. L., Joseph, D. L., & Salas, E. (2017). Leadership training design, delivery, and implementation: A meta-analysis. Journal of Applied Psychology, 102(12), 1686-1718. https://doi.org/10.1037/apl0000241

Smither, J. W., London, M., & Reilly, R. R. (2005). Does performance improve following multisource feedback? A theoretical model, meta-analysis, and review of empirical findings. Personnel Psychology, 58(1), 33-66. https://doi.org/10.1111/j.1744-6570.2005.514_1.x

Theeboom, T., Beersma, B., & van Vianen, A. E. M. (2014). Does coaching work? A meta-analysis on the effects of coaching on individual level outcomes in an organizational context. The Journal of Positive Psychology, 9(1), 1-18. https://doi.org/10.1080/17439760.2013.837499

What the OL 328 Module 7 instructions ask for

The OL 328 final project gathers the self-assessment, both milestones and the crisis assignment into one leadership development plan. It expects a description of the leader and the setting, a clear statement of the leadership challenge, the approach chosen and the research behind it, then concrete development activities for the leader and for other people in the organization. Each activity should name an owner, a schedule and the evidence that will show results. Strong plans explain why a given activity should change behavior, citing studies of training, feedback, coaching or on-the-job experience rather than assuming that any workshop helps. Expect to show where instructor comments on the milestones changed your thinking. The plan also needs measures, a timeline, an honest account of costs and a short discussion of risks or limits, written in APA style with a title page and references.

How this OL 328 Module 7 final project example is built

Here the leader is the newly promoted manager of the Eastside Branch, a composite branch in a seven-branch Ohio library system, and the challenge is a branch that relied on a single person to lead. The paper restates the 360 results in fresh terms, then builds a development plan on four supports: a rotating acting-manager week for each department head with structured feedback afterward, a four-session on-site series on incident leadership spaced a month apart, six months of external coaching for the manager and a repeat 360 survey tied to written goals. A successor bench, a cost table of about $14,600 and a measures table close the plan. Each activity cites a study explaining why it should work, and a short section admits what could go wrong, including staff fatigue and the chance that the system moves a trained department head to another branch.

Where the OL 328 Module 7 rubric puts the points

Marks on the OL 328 final project tend to follow the guideline headings: an accurate picture of the leader and the setting, a clearly stated challenge, an approach justified by leadership research, development activities that are specific and supported by evidence, measures and a timeline, attention to the people being led and clear APA writing. The highest scores go to plans where every activity answers a weakness found earlier in the course. Plans lose credit when development means reading a book or attending a seminar, when the leader develops but nobody else does, when results are described as feelings instead of numbers, when costs are left out or when instructor comments on the milestones are ignored. Graders also check that research is summarized correctly, not inflated to claim more certainty than the studies show.

OL 328 Module 7 help: the mistakes that cost points

Reread the grader's notes on both OL 328 milestones and repair what they flagged before adding new sections. Then list each weakness your self-assessment and challenge analysis found and match it to one development activity; if a weakness has no activity, the plan has a gap. For each activity say who runs it, how often, what it costs and what result you expect. Mix methods: real assignments with feedback usually teach more than a single class, and coaching or practice spread over months beats a one-day event. Plan for other people's development, not just your own, since the course treats leadership as something a team holds. Add a measures table with a starting value and a target. Cite the studies you lean on and describe them accurately. Finish with risks and what you would do if a measure stalls.

Get OL 328 Module 7 written to your instructions

Send the OL 328 final project guidelines together with your milestone drafts and the grader's notes on them. We assemble a single leadership development plan from that material: the leader's assessment, the challenge, the chosen approach, development activities for the leader and for others, measures, cost and a timeline. The first OL 328 capstone draft is free of charge and usually arrives within forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 328 papers and related BS Business Administration samples

OL 328 Module 7 questions, answered

Where can I find a free OL 328 Module 7 Final Project sample?

A complete OL 328 final project is on this page: a leadership development plan for a composite library branch manager and four department heads, with costs and measures.

What goes in a leadership development plan?

An assessment of the leader, the challenge being addressed, the chosen approach, specific activities for the leader and for others, a timeline, a budget, measures with targets and the risks that could get in the way.

Do stretch assignments develop leaders?

Studies of managers find that challenging assignments build skill, though gains level off at very high challenge unless the person also gets regular feedback on how they are doing.

Is leadership training worth the money?

A meta-analysis of 335 samples found that leadership courses changed what managers knew, how they acted at work and the results of their units, with bigger gains when it included practice, feedback and sessions spread out over time.

How do you measure a leader's development?

Repeat the same multisource survey after six to twelve months, track team outcomes such as turnover and safety, and check whether written development goals were met.