OL 328 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 328 Module 1 Discussion sample asks what leadership is and whether good leaders are born or made. SNHU OL 328 (OL-328) begins its BS Business Administration leadership course by putting this question to students. Here the post opens on the Eastside Branch of the Riverbend Public Library, a composite Ohio branch whose manager of 23 years has retired, and the children's librarian promoted to replace her, who keeps hearing that her predecessor was "a natural leader." It weighs research on personality traits and leadership against evidence that behaviors matter more, separates developing one leader from developing leadership across a team and asks classmates which leader behavior they have seen matter most.

CourseOL 328 Leadership
ModuleModule 1
Paper typeundergraduate discussion post defining leadership and comparing trait and behavioral views, introducing the leader and organization to be studied
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 328 Module 1

1

Module One Discussion

Nine Years a Colleague, One Week the Boss

For this course I will study the Eastside Branch of the Riverbend Public Library, a composite seven-branch system in Ohio. Eastside is the busiest branch: about 1,400 visitors a day, 22 staff and about 15 regular volunteers, a children's room, a teen space, public computers that are always full and, starting next spring, a makerspace with 3D printers and a sewing studio. Its manager for 23 years retired in June. I was the children's librarian here for nine years, and two weeks ago I became the branch manager. Seven of the people I now supervise were my lunch companions last month.

What this page is doingThe branch and the new manager.
2

I have heard that sentence about my predecessor a dozen times since June. She was warm, funny and remembered every patron's name. I am quieter. The question under the compliment is whether leadership is something a person has or something a person does.

What this page is doing"She was a natural leader."
3

Judge et al. (2002), combining dozens of studies, found that personality traits were related to leadership: extraversion most strongly, followed by conscientiousness and openness, while agreeableness had a weak relationship. The relationships were real but modest, which means plenty of introverts lead well and plenty of extroverts do not. DeRue et al. (2011), integrating trait and behavioral research, found that leaders' behaviors, such as structuring work, showing consideration and inspiring change, explained more of their effectiveness than their traits did. Day et al. (2014), looking back over a quarter century of studies, separated growing one person's capacity to lead from growing a whole group's capacity to lead together.

What this page is doingTraits, behaviors and the studies.
4

My predecessor's warmth was real, but what made the branch work was what she did: a five-minute huddle every morning, noticing who was struggling and stepping in when a patron got difficult. Those are behaviors I can learn. Day and colleagues' distinction also matters here: a branch that runs on one person's personality is fragile, and my job may be to build leadership in the team rather than to replace hers.

What this page is doingWhat it means for me.
5

Which leader behavior, something you could see a leader do, has mattered most in your experience?

What this page is doingYour experience.
6

References

Day, D. V., Fleenor, J. W., Atwater, L. E., Sturm, R. E., & McKee, R. A. (2014). Advances in leader and leadership development: A review of 25 years of research and theory. Leadership Quarterly, 25(1), 63-82. https://doi.org/10.1016/j.leaqua.2013.11.004

DeRue, D. S., Nahrgang, J. D., Wellman, N., & Humphrey, S. E. (2011). Trait and behavioral theories of leadership: An integration and meta-analytic test of their relative validity. Personnel Psychology, 64(1), 7-52. https://doi.org/10.1111/j.1744-6570.2010.01201.x

Judge, T. A., Bono, J. E., Ilies, R., & Gerhardt, M. W. (2002). Personality and leadership: A qualitative and quantitative review. Journal of Applied Psychology, 87(4), 765-780. https://doi.org/10.1037/0021-9010.87.4.765

What the OL 328 Module 1 instructions ask for

The first OL 328 discussion has students define leadership and introduce the leader or setting they will study through the term, often by asking whether leaders are born or made. You will describe the organization and a leader's role, offer a working definition of leadership and weigh what research says about traits and behaviors. OL 328 posts that do well move past admiring adjectives such as "inspiring" to observable behaviors, represent the research on traits accurately, including how modest the links are, and connect the debate to a real leader's situation. A short, honest introduction, including the writer's own doubts if they are leading, hands peers a concrete case to answer and frames the eight OL 328 modules ahead.

How this OL 328 Module 1 discussion example is built

The sample introduces the Eastside Branch of the Riverbend Public Library, a composite seven-branch system in Ohio, where a manager of 23 years has retired and a children's librarian with nine years at the branch has been promoted to replace her. Colleagues call the former manager "a natural leader," and the new manager wonders whether she is one. Judge, Bono, Ilies and Gerhardt's meta-analysis of personality and leadership, DeRue and colleagues' finding that leader behaviors predict effectiveness better than traits and Day and colleagues' review of leader and leadership development support the conclusion that leadership is mostly a set of learnable behaviors, and the post asks OL 328 classmates which leader behavior they have seen matter most.

Where the OL 328 Module 1 rubric puts the points

For this opening OL 328 post, instructors look first at whether a real leader and setting come through clearly, then at a working definition of leadership grounded in behavior, an accurate account of research on traits and behaviors, an honest application to the case and replies that push classmates to name specific behaviors. Strong OL 328 posts admit uncertainty where it exists. Posts lose credit when they define leadership with a famous quotation and nothing more, treat traits as destiny, praise or criticize a leader without describing what the leader does, ignore the people being led or answer peers with compliments rather than a question about a specific behavior.

OL 328 Module 1 help: the mistakes that cost points

Describe the setting and the leader you will study; if that leader is you, say what has changed in your role. Write a one-sentence definition of leadership that you can observe in action. Then look at the research: what do studies say about traits such as extraversion, and what do they say about behaviors? Apply both to your leader honestly. Consider whether leadership in your setting depends on one person or is spread across a team. End with a question that asks OL 328 classmates which leader behavior has mattered most in their experience, and reply by asking for an example of that behavior in action. Keep the introduction short enough that classmates can reply to one clear claim.

Get OL 328 Module 1 written to your instructions

Send the Module 1 prompt for OL 328 and tell us briefly about the leader or setting you will study. We define leadership in that setting, weigh research on traits and behaviors and on developing leadership and close with a question that invites OL 328 classmates to name the behaviors they have seen matter. There is no charge for your first OL 328 opening post, and it is usually back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 328 papers and related BS Business Administration samples

OL 328 Module 1 questions, answered

Where can I find a free OL 328 Module 1 Discussion sample?

The full OL 328 Module 1 post is on this page: a new library branch manager asks whether leaders are born and what research says about traits and behaviors.

Are leaders born or made?

Research suggests some traits, such as extraversion and conscientiousness, relate modestly to leadership, but leader behaviors, which can be learned, explain more of leadership effectiveness.

Which personality traits relate to leadership?

A meta-analysis found extraversion most strongly related to leadership, followed by conscientiousness and openness, with agreeableness weakly related.

What is the difference between leader development and leadership development?

Leader development builds an individual's capacities; leadership development builds the shared capacity of a group to lead together.

How should leadership be defined in a post?

In terms of what a leader does with and for others, such as setting direction, building relationships and helping a group achieve goals, so it can be observed.