HRM 425 Module 6 Retention Assignment Example

Reviewed by Portia Lambrick, MBA

This HRM 425 Module 6 Retention Assignment sample looks at why people leave an organization and, just as importantly, why others stay. SNHU HRM 425 (HRM-425) asks BS Human Resource Management students to use data to target retention efforts instead of offering general perks. For Holston Electric Company, a composite Knoxville electrical contractor, the paper analyzes three years of turnover by tenure, role and foreman, reports forty stay interviews with apprentices and journeymen, interprets both through research on job embeddedness and reasons for staying, and recommends four targeted actions with their costs, owners and the measures that will show whether they work.

CourseHRM 425 Employee Life Cycle Management
ModuleModule 6
Paper typeundergraduate retention assignment analyzing turnover and stay interview data
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Human Resource Management
UpdatedOctober 2026

Free sample paper for HRM 425 Module 6

1

Why Electricians Stay: Turnover Patterns and Stay Interviews at Holston Electric Company

[Student Name]

Southern New Hampshire University

HRM 425: Employee Life Cycle Management

Retention Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHolston Electric Company and its turnover and interview data are an invented teaching case.
2

Why Electricians Stay: Turnover Patterns and Stay Interviews at Holston Electric Company

Introduction

The five-year staffing forecast for Holston assumes the company can cut journeyman quits from 4 to 3 percent a year and raise apprentice completion to 75 percent. Both depend on knowing why electricians leave and why others stay. This paper analyzes three years of separations by tenure, role and foreman, reports forty stay interviews with current apprentices and journeymen, interprets the findings through retention research and recommends four targeted actions, naming for every one who runs it, what it costs and how its effect will be counted.

What this page is doingAsking the people who stay.
3

Turnover Analysis

Over the past three years Holston recorded 112 separations from its field workforce of about 295, an average of 37 a year, or 12.7 percent. Of these, 31 were retirements, 14 were dismissals and 67 were voluntary quits. Quits are the avoidable part and the focus here. They are not spread evenly.

Voluntary quits over three years, by group

GroupAverage headcountQuitsAnnual quit rate
Apprentices, year 1241419 percent
Apprentices, year 2222132 percent
Apprentices, years 3 and 43998 percent
Journeymen, under 5 years62158 percent
Journeymen, 5 years and more11862 percent
Foremen3022 percent

Two concentrations stand out: second-year apprentices and journeymen in their first five years. A third appears when quits are grouped by foreman: crews under three of Holston's thirty foremen lost people at more than twice the company rate. Exit forms list pay for 41 of the 67 quits, but the forms offer only five boxes, and most exits happen in December through February, when work slows.

What this page is doingWhere exits cluster.
4

Stay Interviews

HR held forty stay interviews of about twenty minutes each with a stratified sample of apprentices and journeymen, using the same five prompts each time, covering what holds them at Holston, what could pull them away, the best part of the week, the worst irritation and the one change they would make. Answers were coded by two HR staff, who agreed on more than 85 percent of codes.

Most frequent themes in forty stay interviews

ThemeMentions
My crew and the people I work with29
A fair foreman who teaches24
Steady hours, including winter18
Building toward my license and a career17
Pay15
Risk: winter layoffs or short weeks21
Risk: being moved between crews without notice16
Risk: a foreman who yells or plays favorites12

Pay mattered, but crews, foremen, steady hours and career progress were mentioned more often as reasons to stay, and winter instability and erratic crew moves were the most common reasons people said they might leave.

What this page is doingWhy people remain.
5

Interpretation

Mitchell et al. (2001) proposed that employees stay because they are embedded: linked to coworkers, fitting their job and community and facing sacrifices if they leave, and found that embeddedness predicted turnover beyond job satisfaction. Holston's interviews describe exactly these links. Electricians who stay talk about their crew and their foreman, and those at risk describe being moved between crews, which cuts the links. In the Hausknecht et al. (2009) data, why someone stayed depended partly on how well they performed and how senior they were, with high performers more likely to cite advancement and organizational prestige and lower performers more likely to cite extrinsic rewards. Rubenstein et al. (2018) combined results from many turnover studies and showed that attitudes, the work environment, including supervisor relations, and embeddedness each predicted voluntary turnover. The high quit rate under three foremen and the winter pattern fit these findings better than the pay explanation on exit forms.

What this page is doingEmbeddedness and reasons for staying.
6

Recommendations

First, foreman coaching. The trio of foremen with the leakiest crews will work with the operations manager and an outside coach for six months on giving instructions, handling mistakes and teaching apprentices, with their crews' quit rates and stay interview themes reviewed quarterly. All foremen will receive a half-day session on the stay interview findings. Cost: about $24,000.

Second, a crew stability rule. Apprentices and journeymen in their first five years will stay with the same foreman for at least six months unless they ask to move or a project ends, and any move will be explained in advance. This costs some scheduling flexibility but almost no money.

Third, a winter hours guarantee. Holston will guarantee at least 32 paid hours a week from December through February for apprentices and journeymen with good attendance, filling slow weeks with prefabrication work, training center classes and shop maintenance. Cost: up to about $110,000 in a slow winter, partly offset by prefabrication output.

Fourth, stay conversations for high performers. Each foreman will hold a short stay conversation every six months with the two or three people on the crew he or she most wants to keep, focusing on their next rung on the career ladder.

What this page is doingFour targeted actions.
7

Costs and Benefits

The four actions cost up to about $134,000 a year. A second-year apprentice who leaves takes about $18,000 of sunk wages and fees with him or her, and a journeyman costs more. Cutting second-year apprentice quits by a third and early journeyman quits by a quarter would prevent about four quits a year in those groups, saving about $80,000, before counting the value of having enough electricians to take on the backlog. The winter guarantee is the largest cost and will be reviewed after the first winter. If prefabrication work covers most of the guaranteed hours, the real cost will be far lower, since the shop output replaces work that would otherwise be done more slowly on site. If it does not, leaders can narrow the guarantee to apprentices and early-career journeymen, the two groups where the data show winter exits concentrate.

What this page is doingIs it worth it?
8

Measures

Exit interviews will also change: a short conversation with HR replaces the five-box form, so that pay can be separated from the reasons that often sit beneath it. HR will track quarterly quit rates by group and by foreman, the share of crew moves made with notice, winter hours paid, stay interview themes repeated each year and the retention of employees rated as high performers.

What this page is doingKnowing within a year.
9

Conclusion

Holston's turnover is concentrated, not general: second-year apprentices, early-career journeymen, three crews and the winter months. Stay interviews show that crews, foremen and steady hours keep people. Retention actions aimed at those concentrations will do more than a general pay increase.

What this page is doingTargeted, not general.
10

References

Hausknecht, J. P., Rodda, J., & Howard, M. J. (2009). Targeted employee retention: Performance-based and job-related differences in reported reasons for staying. Human Resource Management, 48(2), 269-288. https://doi.org/10.1002/hrm.20279

Mitchell, T. R., Holtom, B. C., Lee, T. W., Sablynski, C. J., & Erez, M. (2001). Why people stay: Using job embeddedness to predict voluntary turnover. Academy of Management Journal, 44(6), 1102-1121. https://doi.org/10.2307/3069391

Rubenstein, A. L., Eberly, M. B., Lee, T. W., & Mitchell, T. R. (2018). Surveying the forest: A meta-analysis, moderator investigation, and future-oriented discussion of the antecedents of voluntary employee turnover. Personnel Psychology, 71(1), 23-65. https://doi.org/10.1111/peps.12226

What the HRM 425 Module 6 instructions ask for

The retention assignment in HRM 425 usually asks you to analyze turnover in an organization and recommend strategies to keep valued employees. Expect to calculate turnover rates, look for patterns by group, explain causes using theory, gather or interpret evidence from employees, recommend strategies and estimate costs or benefits. Some versions specifically ask about stay interviews or engagement surveys. A strong paper breaks turnover down by tenure, role, unit and performance, distinguishes avoidable from unavoidable exits, asks current employees why they stay as well as asking leavers why they left, ties recommendations to the patterns found and sizes each recommendation against the cost of turnover.

How this HRM 425 Module 6 retention assignment example is built

The sample analyzes 112 exits at Holston Electric Company over three years. Quits cluster among second-year apprentices and journeymen with under five years of service, and crews under three foremen lose people at twice the company rate. Forty stay interviews find electricians staying for their crew, a fair foreman, steady winter hours and the feeling of building a career, and considering leaving over winter layoffs and erratic crew moves. The paper reads this through Mitchell and colleagues' job embeddedness and Hausknecht and colleagues' reasons for staying, then recommends foreman coaching, a crew stability rule, a winter hours guarantee and stay conversations with high performers, each costed against about $18,000 per lost apprentice.

Where the HRM 425 Module 6 rubric puts the points

The rubric commonly scores turnover analysis, use of employee evidence, application of retention theory, the quality and targeting of recommendations, cost and benefit reasoning and writing with APA style. High-scoring papers find where turnover is concentrated, explain it with theory and evidence from employees, and recommend actions aimed at those concentrations with costs and measures. Papers lose points for overall turnover rates with no breakdown, for relying only on exit interviews, for generic perks such as pizza days, for recommendations with no link to the data and for ignoring which employees the organization most wants to keep. Reporting how interview answers were coded, even in one sentence, shows the evidence was handled with care.

HRM 425 Module 6 help: the mistakes that cost points

Calculate turnover overall, then break it down by tenure, role, location or supervisor and by voluntary versus involuntary; the averages usually hide where the real problem lies. Ask current employees why they stay, through stay interviews or survey items, since leavers' reasons on exit forms are often incomplete. Use theory, such as job embeddedness, to explain why some people stay despite better offers. Then target: one action for each concentration you found, with an owner, a cost and a measure. Compare each cost with what a lost employee costs. Mention high performers specifically, since losing them costs most. Close with how you will know within a year whether retention improved. If your course gives you no data, build a small table from the case facts and state that the figures are assumptions.

Get HRM 425 Module 6 written to your instructions

Send the HRM 425 Module 6 instructions and the turnover or survey data you have. We find where exits cluster, add what stay interviews or surveys reveal, read it through retention research and recommend targeted, costed actions. About two days; your first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More HRM 425 papers and related BS Human Resource Management samples

HRM 425 Module 6 questions, answered

Where can I find a free HRM 425 Module 6 Retention Assignment sample?

The full HRM 425 Module 6 assignment appears here, analyzing turnover and stay interviews at an electrical contractor with targeted retention actions.

What is a stay interview?

A short, planned talk in which a manager or HR asks someone still on the payroll what keeps them, what could pull them away and what they would change, long before any resignation.

What is job embeddedness?

A theory that people stay because of their links to others at work and in the community, their fit with the job and place and what they would sacrifice by leaving.

How do you calculate turnover rate?

Divide the number of separations in a period by the average number of employees in that period and multiply by 100, then break it down by group and type of exit.

What are the most effective retention strategies?

Strategies aimed at the specific causes found in an organization's own data, such as supervisor quality, scheduling or career paths, work better than general perks.