| Course | OL 321 Business Plan Preparation |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment preparing a venture's start-up budget, financial projections, break-even analysis and funding plan |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 321 Module 6
Hours Sold, Break-Even and Three Ways to Fund It: The Financial Plan for Second Shift Kitchen
[Student Name]
Southern New Hampshire University
OL 321: Business Plan Preparation
Financial Plan Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Hours Sold, Break-Even and Three Ways to Fund It: The Financial Plan for Second Shift Kitchen
Introduction
Earlier sections of the plan have described what this kitchen will sell, to whom and how. This section shows whether the numbers work: what the kitchen will cost to open, what it will earn and spend over its first three years, how many hours it must sell to break even, what happens if it sells fewer and how it will be funded. Every figure traces to an assumption stated below.
Start-Up Costs
Start-up budget
| Item | Cost |
|---|---|
| Build-out: electrical service, walk-in coolers, sinks, grease interceptor, graywater point, flooring | $185,000 |
| Equipment: ranges, convection ovens, mixers, prep tables, dish machine, smallwares | $120,000 |
| Design, permits, licensing, legal and initial insurance | $15,000 |
| Cash cushion for first-year losses and working capital | $90,000 |
| Total | $410,000 |
Revenue Assumptions
Hours sold start from the evidence. Eleven letter-of-intent members committed to about 4,100 hours a year, and the market analysis estimated about 8,000 capturable hours once the kitchen is established. The projection assumes 6,500 hours in year one as members join over the first months, 9,000 in year two and 11,000 in year three as the kitchen becomes known and graduating members are replaced. The average realized rate is $27 an hour in the first two years, blending membership hours and extra hours, rising to $28 in year three with a modest price increase. Membership fees, parking and storage add about $45,000 in year one, $60,000 in year two and $70,000 in year three, and labeling and permit help adds a small amount.
Cassar (2010), following people as they started businesses, found that what they expected to sell and how many people they expected to hire ran well ahead of what their firms later achieved. For that reason the projection discounts the survey-based estimate, uses the lower producer hours found in the trial and treats the year three figure as a target rather than a forecast.
Operating Costs
Annual operating costs (year two)
| Item | Cost |
|---|---|
| Rent | $60,000 |
| Utilities (gas, electric, water, waste) | $30,000 |
| Insurance | $10,000 |
| Kitchen manager | $46,000 |
| Part-time attendants | $24,000 |
| Founder's salary | $40,000 |
| Cleaning, pest control, maintenance | $15,000 |
| Software, supplies and other | $8,000 |
| Marketing | $6,000 |
| Debt and lease payments | $65,500 |
| Total | $304,500 |
Three-Year Projection
Projected results
| Year 1 | Year 2 | Year 3 | |
|---|---|---|---|
| Hours sold | 6,500 | 9,000 | 11,000 |
| Hourly revenue | $175,500 | $243,000 | $308,000 |
| Memberships, parking, storage, services | $45,000 | $60,000 | $70,000 |
| Total revenue | $220,500 | $303,000 | $378,000 |
| Operating costs including debt payments | $304,500 | $304,500 | $312,000 |
| Result after debt payments | -$84,000 | -$1,500 | $66,000 |
The first year loses about $84,000, which the $90,000 cushion covers with little to spare. Year two is close to break-even, and year three produces a surplus that can rebuild the cushion and fund a second set of stations.
Monthly Cash in Year One
Annual figures hide a difficult first year. In the first two months after opening, only the eleven founding members are expected to book, and hours run at about 340 a month, bringing in roughly $13,000 including memberships, against monthly costs of about $25,400. The gap narrows as members join, reaching about $19,000 in monthly revenue by month six and about $23,000 by month twelve. The cushion therefore falls fastest in the first quarter: by month three the kitchen will have used about $36,000 of its $90,000. The founder will review cash weekly with her bookkeeper in the first six months, and the downside plan is triggered automatically if cash on hand falls below $35,000 before month six.
Sensitivity to Price
The projection assumes an average realized rate of $27 an hour. Each dollar of difference in that rate moves annual revenue by about $9,000 at year-two volume, which is why pricing decisions will be reviewed with the lenders' figures in mind. At $25 an hour, break-even would rise to about 9,800 hours; at $29, it would fall to about 8,400. The interviews suggest that truck owners are less sensitive to the hourly rate than to parking and storage, which is why the plan bundles those into membership rather than discounting hours.
Break-Even
Fixed costs, including debt payments, are about $304,500 a year. At maturity, memberships, parking and storage contribute about $60,000 of that. The remaining $244,500 must come from hours at about $27 each, which requires about 9,000 hours a year. With about 30,000 station-hours of capacity, the kitchen breaks even at about 30 percent utilization, which it is projected to reach in year two.
Downside Case
If hours run a quarter below projection, 4,900 in year one and 6,750 in year two, the first-year loss rises to about $128,000 and the second-year loss to about $62,000. The cushion would be exhausted early in year two. The response is decided now, not in a crisis: the founder defers her salary, the kitchen trims its hours to cut attendant costs and it opens the stations to a nearby culinary training program for paid evening classes. Kerr et al. (2014) argue that founders are always running trials whose outcomes no one can forecast; a downside plan prepared now is cheaper than one improvised in a crisis.
Funding Plan
Sources and uses of funds
| Source | Amount | Terms | Use |
|---|---|---|---|
| Founder's savings | $60,000 | Equity | Design, permits, part of cushion |
| SBA-guaranteed bank loan | $170,000 | About 10 years at roughly 10.5% | Build-out and working capital |
| Community development lender loan | $100,000 | 7 years at about 7% | Remaining build-out and cushion |
| Equipment lease | $80,000 | 5 years | Ranges, ovens, dish machine |
| Total | $410,000 |
Robb and Robinson (2014), studying a large sample of new firms, found that they relied heavily on outside debt, particularly bank financing, rather than primarily on friends, family or outside equity. This plan follows that pattern. A community development lender is included because such lenders often accept more risk for ventures that create local jobs and support small businesses, as this kitchen would.
What Lenders Should Watch
Three numbers will tell lenders whether the kitchen is on track: hours sold each month against the plan, the share of Truck Base memberships renewed and cash on hand against three months of fixed costs. The founder will report all three monthly to both lenders.
References
Cassar, G. (2010). Are individuals entering self-employment overly optimistic? An empirical test of plans and projections on nascent entrepreneur expectations. Strategic Management Journal, 31(8), 822-840. https://doi.org/10.1002/smj.833
Kerr, W. R., Nanda, R., & Rhodes-Kropf, M. (2014). Entrepreneurship as experimentation. Journal of Economic Perspectives, 28(3), 25-48. https://doi.org/10.1257/jep.28.3.25
Robb, A. M., & Robinson, D. T. (2014). The capital structure decisions of new firms. Review of Financial Studies, 27(1), 153-179. https://doi.org/10.1093/rfs/hhs072
What the OL 321 Module 6 instructions ask for
The Module 6 assignment in OL 321 has students prepare the financial section of their business plan. You will estimate start-up costs, project revenue and expenses for the first few years, calculate break-even, show cash needs and propose how the venture will be funded. Financial plans that score well in OL 321 tie every revenue figure to evidence from earlier sections, such as customers, prices and capacity, list assumptions openly, include a downside case, show debt payments and cash, not only profit, and match funding sources to uses. They recognize that founders tend to be optimistic and build in a margin for error, and they make the numbers easy for a lender to check.
How this OL 321 Module 6 financial plan assignment example is built
The sample builds the financial plan for Second Shift Kitchen, a composite shared commercial kitchen planned for Worcester, Massachusetts. Start-up costs total $410,000, including a $90,000 cash cushion. Revenue grows from about $220,000 in year one to $378,000 in year three as hours sold rise from 6,500 to 11,000, with membership fees, storage and parking adding to hourly sales. Break-even comes at about 9,000 hours a year, roughly 30 percent of capacity, in year two. A downside case with hours a quarter lower uses most of the cushion. Funding comes from $60,000 in savings, a $170,000 SBA-guaranteed loan, a $100,000 community lender loan and an $80,000 equipment lease, supported by research from Cassar, Robb and Robinson and Kerr, Nanda and Rhodes-Kropf.
Where the OL 321 Module 6 rubric puts the points
OL 321 financial plans are typically graded on a complete start-up budget, projections tied to evidence and stated assumptions, correct break-even and cash calculations, a meaningful downside case, a funding plan that matches sources to uses, use of research and clear tables. The strongest OL 321 financial sections let a lender trace every number to an assumption and show what happens if things go worse than hoped. Plans lose marks for revenue figures with no basis, omitting debt payments or owner pay, showing profit without cash, skipping the downside case, proposing funding sources the venture cannot realistically obtain or presenting tables without explanation.
OL 321 Module 6 help: the mistakes that cost points
List every start-up cost and add a cash cushion for early months. Build revenue from your evidence: customers times purchases times price, ramping up realistically. List operating costs, including rent, utilities, insurance, staff, owner pay and debt payments. Calculate break-even in units your business sells, such as hours, and compare it with capacity. Project cash month by month for the first year and annually after. Then build a downside case with lower sales and see whether the cushion holds. Match funding to uses, long-term loans for build-out and equipment financing for equipment, and show the terms. Explain every assumption in plain words.
Get OL 321 Module 6 written to your instructions
Share the OL 321 Module 6 instructions and your venture's cost and revenue assumptions. We build the start-up budget, monthly and annual projections, break-even analysis, a downside case and a funding plan, state every assumption and ground the approach in research on projections and new-firm finance. Your first OL 321 financial plan is free and returned within two days of the request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 321 papers and related BS Business Administration samples
- OL 321 Module 1 Discussion: Why Write a Business Plan
- OL 321 Module 2 Market Analysis Assignment: Market Research and Market Sizing
- OL 321 Module 3 Milestone One: Business Concept and Competitive Analysis
- OL 321 Module 4 Discussion: Testing Assumptions Before the Plan
- OL 321 Module 5 Milestone Two: Marketing and Operations Plan
- OL 321 Module 7 Final Project: Complete Business Plan
- OL 321 Module 8 Discussion: Pitching the Business Plan
- QSO 340 Module 6 Earned Value Analysis Assignment: Earned value at week 20
- BUS 225 Module 4 Project One: A Problem Analysis Report
- FIN 460 Module 2 Property and Probate Assignment: How Each Lindqvist Asset Would Pass Today
- QSO 415 Module 6 Discussion: Does a 310-Person Plant Need a Digital Twin?
OL 321 Module 6 questions, answered
Where can I find a free OL 321 Module 6 financial plan sample?
The full OL 321 Module 6 financial plan is here: start-up costs, projections, break-even and funding for a composite shared kitchen.
What goes in a business plan's financial section?
Start-up costs, projected income and cash flow for several years, break-even analysis, a downside case, the funding request and the assumptions behind every figure.
How do I calculate break-even?
Divide fixed costs, after other fixed revenue, by the profit each unit sold contributes; for a kitchen, the result is the hours a year it must sell to cover costs.
Are founders' sales projections reliable?
Research found nascent entrepreneurs' expectations for sales and growth ran well ahead of results, so projections should be discounted and tested against a downside case.
How do new firms usually finance start-up costs?
Studies found new firms rely heavily on outside debt, especially bank loans backed by owners, alongside owners' own money.