| Course | OL 321 Business Plan Preparation |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment researching and sizing the market for a new venture using primary and secondary evidence |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 321 Module 2
Counting Food Trucks in Worcester County: A Market Analysis for Second Shift Kitchen
[Student Name]
Southern New Hampshire University
OL 321: Business Plan Preparation
Market Analysis Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Counting Food Trucks in Worcester County: A Market Analysis for Second Shift Kitchen
Introduction
Second Shift Kitchen's plan rests on one question: will enough food businesses pay by the hour for licensed kitchen time to fill six stations in a former Worcester bakery? This paper answers that question with local evidence. It defines the customers, counts them, asks them about their needs and willingness to pay, builds an estimate of demand from the bottom up and identifies the segments the kitchen should serve first.
Why Not a National Figure
National reports put the food truck industry's revenue in the billions of dollars, and it is tempting to quote such a figure and claim a small share. But a national total says nothing about how many food businesses within twenty minutes of Worcester need kitchen time, how many hours they need or what they will pay. Shane and Venkataraman (2000) described entrepreneurial opportunities as situations that must be discovered and then evaluated, and evaluation requires evidence about the specific customers involved. The estimate below is built from those customers.
Who the Customers Are
Three kinds of food businesses need licensed kitchen space but rarely own it. Mobile food vendors, including food trucks and carts, typically must operate from a licensed commissary for prep, storage, cleaning and water service. Caterers without their own kitchens need space for large jobs. And small packaged-food producers, makers of sauces, baked goods, jams and prepared foods sold wholesale or at farmers markets, need a licensed kitchen once they outgrow the limits on home production. Each buys kitchen time differently: food trucks on a regular weekly schedule, caterers in irregular blocks around events and producers in steady daytime amounts. Fitting these different schedules into the same stations is part of the venture's business model design, which Zott and Amit (2007) found to matter for how entrepreneurial firms perform.
Counting the Customers
Potential customers within a twenty-minute drive
| Group | Source | Count | Without their own licensed kitchen |
|---|---|---|---|
| Mobile food vendors | City and county license records | 74 | 49 |
| Caterers | County business listings; interviews | 31 | 12 |
| Small food producers | State food processor lists; farmers market rosters | 58 | 41 |
| Total | 163 | 102 |
The third column matters most. Vendors and producers who already own or rent a dedicated kitchen are unlikely to switch, so the market is about 102 businesses, not 163.
What Customers Said
I interviewed twenty owners in person, eight food truck operators, five caterers and seven producers, and then sent a short survey to the 102 businesses without their own kitchen, receiving 64 responses. Four findings stand out. First, most food truck owners currently use one of two commissaries, one forty minutes away in a neighboring county and one a restaurant kitchen available only after 11 p.m.; every one of the eight truck owners interviewed named the long drive or the late-night hours as the biggest headache in running the business. Second, producers said that the hardest part of growing was finding a kitchen with daytime hours and a health inspector's approval. Third, the most frequently requested features were cold storage, a reliable schedule and truck parking with water and power. Fourth, most respondents now pay between $20 and $35 an hour for kitchen time, plus storage fees.
Survey results, businesses without their own kitchen (64 responses)
| Group | Responses | Median kitchen hours needed per week | Share willing to pay $28 an hour or more |
|---|---|---|---|
| Food trucks | 33 | 6 | 64% |
| Caterers | 9 | 4 (seasonal) | 56% |
| Producers | 22 | 8 | 50% |
Total Demand
Applying the survey medians to all 102 businesses, adjusted for seasons, gives an estimate of total demand. Food trucks: 49 businesses times 6 hours a week times 40 operating weeks is about 11,800 hours. Caterers: 12 businesses times 4 hours a week times 30 active weeks is about 1,400 hours. Producers: 41 businesses times 8 hours a week times 48 weeks is about 15,700 hours. That totals about 28,900 hours, but survey respondents tend to overstate future use, so the estimate is reduced by a quarter, to about 22,000 hours a year.
Capturable Demand
Not all of that demand is within reach. Some businesses will stay with their current arrangements, and the kitchen's six stations can sell only so many hours. If the kitchen wins about half of the businesses willing to pay $28 or more, roughly 30 to 33 members, and they use the hours they reported, the kitchen would sell about 8,000 hours a year. Six stations open 16 hours a day, six days a week, offer about 30,000 station-hours a year, so 8,000 hours is a little over a quarter of capacity, which leaves room to grow and suggests that pricing and scheduling, not space, will be the binding constraints.
Segments
Gruber et al. (2008), studying technology ventures, found that founders who identified several possible markets before entering one tended to perform better, because they could choose the most promising rather than the first. The evidence points to three segments. Food trucks are the largest and most reliable, with regular weekly hours and an urgent need for a commissary with parking; they should be served first. Producers need daytime hours and are growing; they fill the stations when trucks are out selling. Caterers are irregular but pay for large blocks and can fill weekends. Each segment would be offered a membership tailored to its pattern of use.
How Customers Buy Today
Understanding how customers meet the need today shows what they would be switching from. Most of the food trucks interviewed pay a monthly fee to the commissary in the neighboring county, which includes a parking space and a shelf in a shared cooler, plus an hourly rate for kitchen time; they drive there before dawn and again after service. Others rent a restaurant's kitchen after closing, paying cash by the hour with no written agreement. Producers mostly use church or community kitchens on weekday mornings, carrying their own equipment in and out because nothing can be left overnight. Each arrangement works, barely, and each leaves the owner dependent on someone else's schedule.
Limits of the Evidence
Sixty-four survey responses from 102 businesses is a good rate, but respondents may be more interested than nonrespondents. Willingness to pay in a survey is not the same as signing a contract. And the count of mobile vendors includes some that operate only part of the year. The next step, discussed in Module 4, is to ask the most interested businesses for letters of intent.
References
Gruber, M., MacMillan, I. C., & Thompson, J. D. (2008). Look before you leap: Market opportunity identification in emerging technology firms. Management Science, 54(9), 1652-1665. https://doi.org/10.1287/mnsc.1080.0877
Shane, S., & Venkataraman, S. (2000). The promise of entrepreneurship as a field of research. Academy of Management Review, 25(1), 217-226. https://doi.org/10.5465/amr.2000.2791611
Zott, C., & Amit, R. (2007). Business model design and the performance of entrepreneurial firms. Organization Science, 18(2), 181-199. https://doi.org/10.1287/orsc.1060.0232
What the OL 321 Module 2 instructions ask for
The Module 2 assignment in OL 321 has students research the market for their venture and estimate its size. Plan to define the customers, gather evidence about how many there are and what they need, estimate total demand and the share the venture can realistically win, and describe customer segments. OL 321 market analyses that score well build the estimate from the bottom up using local counts and the founder's own interviews or surveys rather than quoting national industry revenue, state each assumption, distinguish total demand from what the venture can capture and explain how customers buy today. They show that the founder has talked to real customers, and they note what the evidence cannot yet show.
How this OL 321 Module 2 market analysis assignment example is built
The sample sizes the market for Second Shift Kitchen, a composite shared commercial kitchen planned for Worcester, Massachusetts. It counts licensed mobile food vendors and caterers from city and county records and small food producers from state lists and farmers market rosters, then draws on twenty interviews and a survey of 64 owners about their kitchen hours, current costs and willingness to pay. The resulting bottom-up estimate is about 22,000 kitchen hours a year within a twenty-minute drive, of which about 8,000 could realistically be captured. Shane and Venkataraman's view of opportunity and Gruber, MacMillan and Thompson's research on considering several markets support the approach, and three segments are defined. It closes by naming what the evidence cannot yet show.
Where the OL 321 Module 2 rubric puts the points
Market analysis papers in OL 321 are generally marked on clear customer definitions, the quality and variety of evidence, a transparent bottom-up estimate, a realistic share the venture can capture, well-defined segments, use of research and organized writing. Strong OL 321 papers show the arithmetic step by step and connect each number to a source the reader could check. Papers lose marks for citing national market size as if it applied locally, assuming customers will switch because the product exists, omitting how customers meet the need today, mixing total demand with capturable demand or presenting survey results without saying who answered.
OL 321 Module 2 help: the mistakes that cost points
Define your customers precisely: who has the need, and how do they meet it now? Count them using local sources such as licensing records, membership lists or directories. Then talk to some of them: interviews tell you what matters, and a short survey can tell you how much and how often. Build the estimate step by step, number of customers times quantity needed times price, and write down each assumption. Separate total demand from what you can realistically capture given location, capacity and competition. Group customers into segments with different needs. Note the limits of your evidence, and say what you will learn next. Describe how customers meet the need today.
Get OL 321 Module 2 written to your instructions
Share the OL 321 Module 2 directions and the venture whose market you are sizing. We gather local evidence, design interviews or a short survey, build a bottom-up estimate with stated assumptions, define customer segments and show how much of the market the venture can realistically capture. Your first OL 321 market analysis is free and returned within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 321 papers and related BS Business Administration samples
- OL 321 Module 1 Discussion: Why Write a Business Plan
- OL 321 Module 3 Milestone One: Business Concept and Competitive Analysis
- OL 321 Module 4 Discussion: Testing Assumptions Before the Plan
- OL 321 Module 5 Milestone Two: Marketing and Operations Plan
- OL 321 Module 6 Financial Plan Assignment: Financial Projections and Funding
- OL 321 Module 7 Final Project: Complete Business Plan
- OL 321 Module 8 Discussion: Pitching the Business Plan
- ACC 425 Module 6 Discussion: The Ethics of Persuasion in an Interview
- ACC 345 Module 5 Forecasting Assignment: Pro Forma Statements for Next Year
- FIN 336 Module 6 Discussion: Borrowing in Reais or in Dollars
- INT 315 Module 2 Organizational Structure Assignment: How Much Should Binh Duong Decide?
OL 321 Module 2 questions, answered
Where can I find a free OL 321 Module 2 market analysis sample?
You can read the complete OL 321 Module 2 market analysis here: demand for a composite shared kitchen, built from local counts, interviews and a survey.
What is a bottom-up market estimate?
An estimate built by counting potential customers and multiplying by how much each would buy and pay, rather than taking a share of a national industry total.
Why are national industry figures misleading for local businesses?
They describe a whole country and many different businesses, while a local venture depends on specific customers within reach, whose numbers and needs can differ greatly.
How many customer interviews are enough?
Enough to hear the same needs and objections repeated; for a local venture, fifteen to twenty-five interviews often reveal the main patterns.
What is the difference between total and capturable demand?
Total demand is all the need in the area; capturable demand is the share the venture can realistically win given its capacity, location, prices and competition.