| Course | FIN 460 Estate Planning and Taxation |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment analyzing property ownership and probate |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Finance |
| Updated | October 2026 |
Free sample paper for FIN 460 Module 2
Property Ownership and Transfer Analysis for the Lindqvist Estate
[Student Name]
Southern New Hampshire University
FIN 460: Estate Planning and Taxation
Module Two Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Property Ownership and Transfer Analysis for the Lindqvist Estate
Introduction
Dale and Margaret Lindqvist believe their 1998 wills decide who inherits their $6.4 million. In fact, the wills control only a small part of it. Most of their property will pass by the way it is titled or by beneficiary forms signed years apart. This paper lists each asset, identifies what controls its transfer, follows it through both deaths and identifies the problems the inventory reveals.
Forms of Ownership
Property owned in one person's name alone passes under that person's will, or under state intestacy law if there is no will, through probate. Joint tenancy with right of survivorship gives each owner an undivided interest that passes automatically to the surviving owner, outside probate and regardless of what either owner's will says. Tenancy in common gives each owner a separate share that passes under that owner's will. Retirement accounts, life insurance and accounts with transfer-on-death or payable-on-death designations pass by contract to the named beneficiaries. Minnesota is not a community property state, so spouses own property according to its title.
The Lindqvist Asset Inventory
Lindqvist assets and how they pass at death
| Asset | Value | Owner or title | Controlled by | At first death | At second death |
|---|---|---|---|---|---|
| Home in Duluth | $520,000 | Joint with survivorship | Title | Survivor | Survivor's will |
| Lake cabin | $680,000 | Dale alone, inherited | Dale's will | Margaret (if Dale dies first) | Three children equally |
| Dale's traditional IRA | $1,600,000 | Dale | Beneficiary form | Margaret | Dale's estate if Margaret predeceases |
| Margaret's traditional IRA | $300,000 | Margaret | Beneficiary form | Dale | Three children equally, outright |
| Dale's Roth IRA | $310,000 | Dale | No form on file | Dale's estate | Dale's estate |
| Joint brokerage account | $2,240,000 | Joint with survivorship | Title | Survivor | Survivor's will |
| Life insurance on Dale | $500,000 | Dale owns | Beneficiary form | Margaret | Three children equally, outright |
| Cash, vehicles, belongings | $250,000 | Mostly joint | Title and will | Survivor | Survivor's will |
The Wills
Both 1998 wills are simple. Each leaves everything to the other spouse and, if the spouse has died, to the three children in equal shares, outright. Each names Dale's brother Gary as personal representative. Gary was 52 when the wills were signed; he is now 80 and lives in Arizona. The wills govern only the cabin, the Roth IRA (because it has no beneficiary form), Dale's IRA if Margaret dies first, and whatever is in one spouse's name at death.
Probate in Minnesota
Minnesota follows the Uniform Probate Code, which allows informal probate: the personal representative applies to the registrar, publishes notice to creditors and settles the estate with little court supervision unless someone objects. Estates with no real estate and under $75,000 can pass by affidavit. The Lindqvist estate would need probate for the cabin and the Roth IRA. Informal probate usually takes six months to a year and costs a small percentage of the probate estate in fees. The main costs here are not fees but publicity, since probate files are public, and delay, since the cabin cannot be transferred until the estate closes.
Following the Property Through Both Deaths
Assume Dale dies first and Margaret dies later without changing anything. At Dale's death, everything passes to Margaret: the joint assets by survivorship, his IRA and insurance by beneficiary form, and the cabin and Roth IRA through probate under his will. At Margaret's death, her will leaves everything to the three children equally, outright, and her IRA beneficiary form does the same. Each child, including Peter, would receive about a third of the estate, roughly $2 million each before taxes. If Margaret dies first, the paths change but the end is similar, except that Dale's IRA would pass to his estate because the contingent beneficiary is the estate, which forces faster distribution and the income tax that comes with it.
Problems the Inventory Reveals
Peter's share. Peter receives SSI and Medicaid, both of which have a $2,000 asset limit. An outright inheritance would end his benefits until it was spent down, and his Medicaid-funded group home placement could be lost. His share must go to a supplemental needs trust instead.
The estate as beneficiary. Naming the estate as contingent beneficiary of Dale's IRA, and filing no form for the Roth, pushes both accounts into probate and makes them subject to creditor claims. Inherited retirement accounts left to an estate also generally lose the more flexible payout periods available to individual beneficiaries.
The cabin. If the cabin passes to three children as tenants in common, any one of them could sell their share or force a partition, and a child's share could pass to a spouse in a divorce. Kopczuk and Lupton (2007) found that most older couples hold assets they intend to leave to heirs, which makes how those assets are divided as important as their size. Menchik (1980) found that American parents strongly tend to divide estates equally among children, which is what the Lindqvists want, but equal shares of a single property are hard to manage without rules.
The personal representative. Gary is 80 and lives far away. A successor closer to home is needed.
Dated documents. Kopczuk (2007) found that much estate planning happens only near death, often in haste. The Lindqvists are healthy now, which is the best time to fix these problems.
What the Inventory Does Not Show
Three facts could change this analysis and must be confirmed before Milestone One. First, the cabin deed should be checked for how Dale's parents conveyed it; some family cabins were deeded with restrictions or to several siblings, and Dale believes his late sister signed her share over to him, but no one has seen the document. Second, the insurance company should confirm the current owner and beneficiaries of the life policy, since Dale remembers changing them after Peter's diagnosis but has no copy. Third, the brokerage account statements show joint ownership, but some joint accounts are opened as tenants in common by default, which would send half through probate. A planner who skips these checks may build a plan on titles that are not what the clients think they are.
Conclusion
Most of the Lindqvists' estate will pass outside their wills, through survivorship and beneficiary forms that were never coordinated. As things stand, Peter would lose his benefits, two retirement accounts would go through probate and the cabin would be shared by three owners with no agreement. Milestone One will measure the estate and its taxes before the plan addresses these problems.
References
Kopczuk, W. (2007). Bequest and tax planning: Evidence from estate tax returns. The Quarterly Journal of Economics, 122(4), 1801-1854. https://doi.org/10.1162/qjec.2007.122.4.1801
Kopczuk, W., & Lupton, J. P. (2007). To leave or not to leave: The distribution of bequest motives. The Review of Economic Studies, 74(1), 207-235. https://doi.org/10.1111/j.1467-937X.2007.00419.x
Menchik, P. L. (1980). Primogeniture, equal sharing, and the U.S. distribution of wealth. The Quarterly Journal of Economics, 94(2), 299-316. https://doi.org/10.2307/1884542
What the FIN 460 Module 2 instructions ask for
The Module Two assignment in FIN 460 commonly asks you to analyze how a client's property is owned and how it would transfer at death. Expect to explain forms of ownership such as sole ownership, joint tenancy with right of survivorship, tenancy in common and, where relevant, community property; to distinguish probate assets from those that pass by contract or by law, such as retirement accounts, life insurance and transfer-on-death accounts; and to describe the probate process in the client's state. Many versions ask you to identify problems and recommend changes. A strong submission lists each asset with its title and beneficiary, follows it to the person who would receive it, and shows the result after both spouses' deaths, not only the first.
How this FIN 460 Module 2 property and probate assignment example is built
The sample builds an asset table for the composite Lindqvists. The home and the $2.24 million brokerage account are held jointly with right of survivorship, so they pass to the survivor without probate. Dale's $1.6 million IRA names Margaret, with the estate as contingent beneficiary; his $310,000 Roth IRA has no beneficiary form on file; Margaret's IRA and Dale's life insurance name the children equally after the spouse. The cabin, inherited by Dale, is in his name alone and passes by will. After both deaths, Peter would receive roughly $1 million outright, the cabin would fall to three children as tenants in common, and the personal representative named in 1998 is now 80. The paper closes with a list of these problems.
Where the FIN 460 Module 2 rubric puts the points
Marks on this assignment usually follow four headings: an accurate explanation of ownership forms, a correct sorting of probate and nonprobate assets, a description of the probate process in the client's state and the identification of problems with recommendations. High-scoring papers apply each concept to the client's real assets, follow property through both deaths and notice when a beneficiary form contradicts the will. Papers lose points for assuming the will controls everything, for treating joint tenancy and tenancy in common as the same, for ignoring contingent beneficiaries and for recommending a trust without saying which assets would be retitled into it. A summary table is commonly expected.
FIN 460 Module 2 help: the mistakes that cost points
Students often lose this assignment by working from the will alone. Start instead with a list of every account and property and ask, for each one, what controls it: the deed, the account title, a beneficiary form or the will. Write the answer for the first death and then for the second, since many problems appear only when the survivor dies. Read contingent beneficiaries as carefully as primary ones; an estate or a blank form often sends an IRA into probate and speeds up the tax on it. Check whether any heir receives money they should not hold directly, such as a person on public benefits or a young adult. Finally, name the person in charge and confirm they could still serve.
Get FIN 460 Module 2 written to your instructions
Send the FIN 460 Module 2 directions and a list of the client's assets with how each is titled. We trace every asset through survivorship, beneficiary forms or the will, sort out what probate would touch and flag the gaps. Plan on about two days; a first assignment from a new student carries no charge. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 460 papers and related BS Finance samples
- FIN 460 Module 1 Discussion: More Than Taxes: What an Estate Plan Is For
- FIN 460 Module 3 Milestone One: The Gross Estate and Two Estate Taxes
- FIN 460 Module 4 Wills, Trusts and Incapacity Assignment: Documents for Two Spouses and a Son
- FIN 460 Module 5 Gifts and Lifetime Transfers Assignment: The Cabin, the Grandchildren and the Annual Exclusion
- FIN 460 Module 6 Milestone Two: Retirement Accounts and Charitable Planning
- FIN 460 Module 7 Final Project: The Lindqvists' Estate Plan
- FIN 460 Module 8 Discussion: Telling the Children
- FIN 355 Module 3 Milestone One: Contract Provisions, Liability and Life Insurance
- FIN 350 Module 6 Discussion: Tax Moves for a Business Owner and an Employee
- ACC 405 Module 3 Equity Method Assignment: A 30 Percent Stake in a Maple Drinks Startup
- BUS 206 Module 7 Project Two: Landing Agreements With the Ranchers
FIN 460 Module 2 questions, answered
Where can I find a free FIN 460 Module 2 Property and Probate sample?
This page carries the full FIN 460 Module 2 paper, which traces a Duluth couple's home, cabin, IRAs, brokerage account and life insurance to their heirs and flags the problems.
What is the difference between probate and nonprobate assets?
Probate assets pass under the will or state law through a court process; nonprobate assets pass by contract or by title, such as beneficiary designations and joint accounts with survivorship.
What is joint tenancy with right of survivorship?
A form of co-ownership in which a deceased owner's share passes automatically to the surviving owner, outside probate and regardless of the will.
Does a will control who gets an IRA?
Usually not. An IRA passes to the beneficiaries named on its form; the will matters only if the estate is the beneficiary or no form exists.
What is tenancy in common?
Co-ownership in which each owner holds a separate share that can be sold or left to heirs, with no automatic survivorship, which can make shared family property hard to manage.