FIN 460 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This FIN 460 Module 3 Milestone One sample calculates a client's gross and taxable estate and the federal and state estate taxes due at each spouse's death. SNHU FIN 460 (FIN-460) assigns this first milestone in Module Three of its BS Finance course on estate planning and taxation. For the composite Lindqvists of Duluth, the paper measures Dale's gross estate at a first death and the survivor's estate at the second, applies the 2026 federal exclusion and portability, and computes the Minnesota estate tax, which has a $3 million exclusion that a spouse cannot inherit. It then tests a credit shelter trust, weighs the income tax cost of losing a second step-up in basis, and checks liquidity.

CourseFIN 460 Estate Planning and Taxation
ModuleModule 3
Paper typeundergraduate milestone measuring a gross estate and its federal and state estate taxes
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Finance
UpdatedOctober 2026

Free sample paper for FIN 460 Module 3

1

Estate Valuation and Transfer Tax Analysis for Dale and Margaret Lindqvist

[Student Name]

Southern New Hampshire University

FIN 460: Estate Planning and Taxation

Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingValues, basis figures and the family are composites; tax figures use 2026 federal and Minnesota rules and are rounded.
2

Estate Valuation and Transfer Tax Analysis for Dale and Margaret Lindqvist

Introduction

Module Two traced how the Lindqvists' property would pass. This milestone measures what it is worth for tax purposes and what taxes would be due. Two taxes apply in principle: the federal estate tax and the Minnesota estate tax. The analysis assumes Dale dies first, which is the more likely order given their ages, values assets at today's figures and uses the 2026 rules: a federal basic exclusion of $15 million per person with portability, and a Minnesota exclusion of $3 million per person with no portability.

What this page is doingPurpose and scope.
3

Dale's Gross Estate

Federal law includes in a decedent's gross estate everything he owned at death, half of any property held jointly with a spouse with right of survivorship, retirement accounts and any life insurance on his life that he owned or controlled.

Dale Lindqvist's gross estate if he dies first

AssetTotal valueIncluded in Dale's estateReason
Home$520,000$260,000Half of spousal joint tenancy
Lake cabin$680,000$680,000Owned by Dale alone
Joint brokerage account$2,240,000$1,120,000Half of spousal joint tenancy
Dale's traditional IRA$1,600,000$1,600,000Owned by Dale
Dale's Roth IRA$310,000$310,000Owned by Dale
Life insurance on Dale$500,000$500,000Dale owns the policy
Cash, vehicles, belongings$250,000$125,000Half, mostly joint
Gross estate$4,595,000

Funeral and administration expenses are estimated at $45,000. Because the 1998 will and the beneficiary forms leave everything to Margaret, the unlimited marital deduction removes the rest. Dale's taxable estate is zero for both federal and Minnesota purposes.

What this page is doingWhat is included at a first death.
4

Margaret's Estate at the Second Death

If Margaret then dies owning everything, and values are unchanged, her gross estate is the full $6.4 million. After about $60,000 of expenses, the taxable estate is about $6.34 million.

Federal tax. Margaret's own exclusion of $15 million, plus Dale's unused exclusion if the executor files a return to elect portability, far exceeds the estate. No federal tax is due. Filing the portability election is still recommended, because it costs little and protects against a future cut in the exclusion.

Minnesota tax. Minnesota taxes estates above $3 million. Because the state exclusion is not portable, Dale's $3 million was wasted when everything passed to Margaret. At rates beginning at 13 percent on the amount above the exclusion, the tax on $6.34 million is about 13 percent of $3.34 million, or $434,200.

Bakija and Slemrod (2004) found that state estate and inheritance taxes have a measurable, though modest, effect on where wealthy older people choose to live. The Lindqvists spend February in Arizona, which has no estate tax, and have asked whether moving their domicile there would help. It would remove the Minnesota tax on most assets, but Minnesota would still tax the cabin, which is Minnesota real estate, and a credible change of domicile means changing where they vote, file taxes and spend most of the year. They do not want to leave Duluth.

What this page is doingWhere the tax appears.
5

Testing a Credit Shelter Trust

If Dale's will and beneficiary forms instead directed $3 million into a credit shelter trust for Margaret's benefit, that $3 million would be covered by his Minnesota exclusion at his death and would not be included in Margaret's estate at hers.

Minnesota estate tax with and without a credit shelter trust

PlanTaxed at Dale's deathMargaret's taxable estateMinnesota tax at her deathTotal Minnesota tax
Current wills, all to Margaret$0About $6,340,000About $434,200About $434,200
$3,000,000 credit shelter trust$0 (within Dale's exclusion)About $3,340,000About $44,200About $44,200

The trust would save about $390,000. Margaret could still receive the income and, under an ascertainable standard, principal for her health, education, maintenance and support, so she would give up little control in practice. Funding requires assets in Dale's name: the cabin, his Roth IRA and policy proceeds, and part of the brokerage account retitled from joint to separate ownership. His traditional IRA is a poor choice for a trust because trusts reach the highest income tax bracket at low levels of income.

What this page is doingUsing Dale's Minnesota exclusion.
6

The Income Tax Cost

Property counted in a decedent's estate takes on a fresh income tax basis, reset to what it was worth on the date of death. Poterba and Weisbenner (2000) estimated that this step-up excuses a large share of all unrealized capital gains from income tax, which makes it one of the most valuable features of the tax code for families like the Lindqvists. Assets in the credit shelter trust receive a step-up at Dale's death but not at Margaret's. If the cabin and stocks in the trust rise by $1 million between the deaths, the children would eventually owe capital gains tax on that rise, perhaps $250,000 to $300,000 combined at federal and Minnesota rates, but only when they sell, and possibly never for the cabin. Against a certain $390,000 of estate tax, the trust still wins, especially if Margaret's life is shorter than average or the assets grow slowly.

What this page is doingBasis at the second death.
7

Life Insurance

Because Dale owns his policy, its $500,000 death benefit is in his gross estate. If he transferred ownership to an irrevocable life insurance trust, the proceeds would be outside both estates, saving about $65,000 of Minnesota tax at the second death. Under federal law, and Minnesota's own rule on gifts shortly before death, a transfer within three years of death would be brought back into the estate, so the step is worth taking now while Dale is healthy. Kopczuk (2007) found that much estate planning is left until a terminal illness, when transfers like this one are most likely to fail the three-year test.

What this page is doingRemoving $500,000 from the estate.
8

Liquidity

Minnesota estate tax is due nine months after death. With the credit shelter trust, the projected tax of about $44,000 can be paid easily from the brokerage account. Without the trust, a $434,000 bill would likely be paid by selling stocks or withdrawing from an IRA, and an IRA withdrawal would add income tax on top. The cabin, the asset the family most wants to keep, should never be the source of cash, which is another reason to fund the tax from liquid assets.

What this page is doingPaying the bill.
9

Conclusion

The Lindqvists owe no federal estate tax and will not under current law. Their exposure is a Minnesota estate tax of about $434,000 caused by wasting Dale's state exclusion. A $3 million credit shelter trust at the first death, funded from assets titled in Dale's name, would cut the tax to about $44,000. Moving the life insurance into an irrevocable trust would reduce it further. Module Four will draft the documents that carry this out.

What this page is doingWhat Milestone One finds.
10

References

Bakija, J., & Slemrod, J. (2004). Do the rich flee from high state taxes? Evidence from federal estate tax returns (NBER Working Paper No. 10645). National Bureau of Economic Research. https://doi.org/10.3386/w10645

Kopczuk, W. (2007). Bequest and tax planning: Evidence from estate tax returns. The Quarterly Journal of Economics, 122(4), 1801-1854. https://doi.org/10.1162/qjec.2007.122.4.1801

Poterba, J. M., & Weisbenner, S. (2000). The distributional burden of taxing estates and unrealized capital gains at the time of death (NBER Working Paper No. 7811). National Bureau of Economic Research. https://doi.org/10.3386/w7811

What the FIN 460 Module 3 instructions ask for

Milestone One in FIN 460 usually asks you to analyze the client's estate as it stands: to list and value the assets, to determine what is included in each spouse's gross estate, to subtract deductions and to calculate any federal estate tax, and in many versions a state estate or inheritance tax. Expect to explain the unified credit and exclusion amount for the year of the case, the marital and charitable deductions, portability of a deceased spouse's unused exclusion and the treatment of joint property and life insurance. Some versions also ask about liquidity: whether the estate has enough cash to pay taxes and expenses without forced sales. Show each calculation in a table and run it for both orders of death if the spouses' assets differ.

How this FIN 460 Module 3 milestone one example is built

The sample measures Dale's gross estate at about $4.6 million: half of the joint home, brokerage account and cash, the cabin, both of his IRAs and the $500,000 life policy he owns. Leaving everything to Margaret produces no tax at his death, but at her later death the full $6.4 million estate, less expenses, owes no federal tax under the $15 million exclusion and about $434,000 of Minnesota estate tax, 13 percent of the amount above $3 million. A $3 million credit shelter trust at the first death uses Dale's Minnesota exclusion and cuts the second tax to about $44,000. The paper weighs this against the lost second step-up in basis on the cabin and stocks, and checks how the tax would be paid.

Where the FIN 460 Module 3 rubric puts the points

Grading for Milestone One typically follows the order of the calculation: the inventory and valuation of assets, the correct inclusion rules, deductions, federal tax with the right exclusion and portability, any state tax, liquidity and the clarity of tables and explanations. The best papers include half of each spousal joint asset in the first estate, include life insurance the decedent owned, apply the state's own exclusion and rates, and test at least one planning change. Points are lost for using an out-of-date federal exclusion, for assuming a state exclusion is portable when it is not, for ignoring the income tax side of trust planning and for presenting a single tax figure without showing how it was reached.

FIN 460 Module 3 help: the mistakes that cost points

Two errors account for most lost points here. The first is using the wrong year's numbers; the federal exclusion changed in 2026 and many textbook examples still show older figures, so state the year and source. The second is stopping at federal tax. Check the client's state, because a dozen or so states tax estates, often at exemptions far below the federal one and without portability. Run the calculation at both deaths, since a plan that saves nothing at the first death can save a great deal at the second. When you suggest a trust, add a sentence on basis: property in a credit shelter trust does not get a new basis when the surviving spouse dies. Finally, ask where the cash to pay the tax would come from.

Get FIN 460 Module 3 written to your instructions

Upload the FIN 460 Milestone One guidelines and the client's asset list with titles and beneficiaries. We build the gross estate at each death, apply the federal and state rules for the year in your case and test whether a trust lowers the bill. Back in about two days; the first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 460 papers and related BS Finance samples

FIN 460 Module 3 questions, answered

Where can I find a free FIN 460 Module 3 Milestone One sample?

This page has the complete FIN 460 Module 3 milestone, measuring a Duluth couple's gross estate at both deaths and computing federal and Minnesota estate tax with and without a trust.

What is included in the gross estate?

Everything the decedent owned or controlled at death, including half of property held jointly with a spouse, retirement accounts and life insurance the decedent owned, valued at fair market value.

What is the federal estate tax exemption in 2026?

The basic exclusion amount is $15 million per person in 2026, and a surviving spouse can add the deceased spouse's unused amount through a portability election.

Does Minnesota have an estate tax?

Yes. Minnesota taxes estates above $3 million at rates from 13 to 16 percent, and the exclusion cannot be transferred to a surviving spouse.

What is a credit shelter trust?

A trust funded at the first spouse's death with assets up to the exclusion amount, which benefits the survivor but is not taxed in the survivor's estate.