FIN 460 Module 5 Gifts and Lifetime Transfers Assignment Example

Reviewed by Portia Lambrick, MBA

This FIN 460 Module 5 Gifts and Lifetime Transfers Assignment sample decides which assets a client should give away during life and which should pass at death. SNHU FIN 460 (FIN-460) covers gift taxation and lifetime transfers in Module Five of its BS Finance course on estate planning and taxation. For the composite Lindqvists of Duluth, the paper explains the 2026 annual exclusion, gift splitting and Minnesota's add-back of large gifts, then recommends yearly gifts to grandchildren's 529 plans and Peter's ABLE account. It moves the life policy into an irrevocable trust and argues that the family cabin should be organized now but kept until death, so the children receive a stepped-up basis.

CourseFIN 460 Estate Planning and Taxation
ModuleModule 5
Paper typeundergraduate assignment on gift tax and lifetime transfer strategies
LengthAbout 1,070 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Finance
UpdatedOctober 2026

Free sample paper for FIN 460 Module 5

1

Lifetime Gifting Strategy for the Lindqvist Family

[Student Name]

Southern New Hampshire University

FIN 460: Estate Planning and Taxation

Module Five Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe family, values and basis figures are composites; 2026 federal and Minnesota rules are summarized for teaching.
2

Lifetime Gifting Strategy for the Lindqvist Family

Introduction

Milestone One found that the Lindqvists owe no federal estate tax but face a Minnesota tax, reduced to about $44,000 with a credit shelter trust. Their estate is still above the state exclusion, and they want to help their grandchildren now, while they can see the results. This paper decides what to give during life and what to keep, with attention to income tax basis and to the rules that protect Peter's benefits.

What this page is doingThe question for this module.
3

The Gift Tax Rules

The federal gift tax and estate tax share one lifetime exclusion of $15 million per person in 2026. Gifts up to the annual exclusion, $19,000 per recipient per donor in 2026, do not use any of that exclusion. A married couple can split gifts, treating a gift from one spouse as made half by each, which requires filing a gift tax return. Payments made directly to a school for tuition or to a provider for medical care are excluded without limit. Minnesota has no gift tax, but it adds back to the estate any taxable gifts, those above the annual exclusion, made within three years of death. Gifts within the annual exclusion are never added back.

Poterba (2001) found that many wealthy households give far less during life than the annual exclusion allows, even when gifts would cut estate tax substantially. Joulfaian (2005) found that the timing of transfers does respond to the relative tax cost of gifts and bequests. For the Lindqvists, both findings point the same way: modest, regular gifts within the exclusion save tax and cost them almost nothing in flexibility.

What this page is doingWhat applies in 2026.
4

Can They Afford to Give?

The couple spends about $150,000 a year. Social Security pays them about $72,000, required distributions from Dale's IRA will begin next year at about $60,000 and dividends and interest from the brokerage account add about $65,000. Their income covers spending with roughly $47,000 to spare, before any drawdown of principal. The brokerage account of $2.24 million could fund gifts of about $120,000 a year for many years and still leave a large reserve for long-term care, which neither spouse has insured. The gifts below are therefore affordable, with a review if either spouse's health changes.

What this page is doingTesting the cash flow first.
5

Gifts to the Grandchildren

The Lindqvists have five grandchildren, ages 3 to 14. Each spouse will give $10,000 a year to each grandchild's 529 plan, $20,000 per child and $100,000 in total. Earnings grow free of tax when used for education, and Minnesota allows a modest state tax deduction or credit for contributions to its own plan. Because each spouse gives from their own funds and stays under $19,000 per recipient, no gift tax return is needed. The 529 accounts will be owned by the parents of each grandchild, not by Dale or Margaret, so they are out of the grandparents' estates. Superfunding, which lets a donor treat up to five years of annual exclusion gifts as made at once, is not needed at this pace.

What this page is doing529 plans within the exclusion.
6

Gifts for Peter

Peter can receive gifts only through vehicles that protect his benefits. His ABLE account can take up to $19,000 a year from all sources combined, and the parents will fund it fully each year. Larger sums go to his supplemental needs trust, which can be funded now with an initial $50,000, using a small part of each parent's lifetime exclusion; a gift tax return reports it, but no tax is due.

What this page is doingThe ABLE account and the trust.
7

The Life Insurance Trust

Dale owns a $500,000 policy on his life, which would be included in his gross estate. He will transfer ownership to a new irrevocable life insurance trust, with Karin as trustee, that pays the proceeds at his death into the same trusts his revocable trust creates. The policy's value for gift purposes is its cash value of about $42,000, covered by the lifetime exclusion. Each year, Dale will give the trust enough to pay the $9,800 premium, and the trustee will send Crummey notices to the beneficiaries, giving them a short window to withdraw the gift, which qualifies it for the annual exclusion. If Dale dies within three years of the transfer, the proceeds are pulled back into his estate, so the transfer should happen now.

What this page is doingMoving the policy out of the estate.
8

The Cabin

The cabin is worth about $680,000. Dale inherited it from his father in 2001, when its value, and so Dale's basis, was about $210,000. If Dale gave it to the children now, they would take his $210,000 basis and inherit a $470,000 unrealized gain. If he keeps it until death, they receive a new basis of its value at that time. Even if the children never sell, the basis matters if one later buys out the others. Poterba and Weisbenner (2000) showed how much unrealized gain escapes income tax through the step-up at death, and a cabin held for decades is a textbook example.

Giving the cabin now versus leaving it at death

ApproachMinnesota estate tax effectChildren's basisCapital gain if sold for $680,000
Gift nowRemoves about $680,000; saves about $88,000 if Dale lives three years$210,000$470,000, taxed at roughly 25 to 30 percent combined
Keep until deathIncluded in Dale's estate, sheltered by his credit shelter trustAbout $680,000None

Since the cabin can sit inside Dale's credit shelter trust at his death, where his Minnesota exclusion covers it, keeping it costs little estate tax, while a gift could cost well over $100,000 of capital gains tax later.

The cabin's real problem is governance, not tax. Dale's trust will form a family LLC to hold the cabin, with an operating agreement that sets a summer calendar, splits costs, limits transfers to family members and gives a buyout formula if one child wants out. The trust will also set aside $150,000 as a maintenance fund, so the children are not forced to sell for a new roof. The agreement will also say what happens when a child dies or divorces: units pass only to that child's descendants or back to the LLC at the formula price, never to an in-law.

What this page is doingOrganize now, give later.
9

Conclusion

The Lindqvists will give about $119,000 a year within the annual exclusion, to 529 plans and Peter's ABLE account, move the life policy into an irrevocable trust now and organize the cabin in an LLC without giving it away. Over ten years, the gifts alone would remove about $1.2 million from the estate, saving roughly $150,000 of Minnesota tax at 13 percent, while keeping the step-up on the cabin.

What this page is doingThe gifting plan.
10

References

Joulfaian, D. (2005). Choosing between gifts and bequests: How taxes affect the timing of wealth transfers. Journal of Public Economics, 89(11-12), 2069-2091. https://doi.org/10.1016/j.jpubeco.2004.11.005

Poterba, J. (2001). Estate and gift taxes and incentives for inter vivos giving in the US. Journal of Public Economics, 79(1), 237-264. https://doi.org/10.1016/S0047-2727(00)00102-X

Poterba, J. M., & Weisbenner, S. (2000). The distributional burden of taxing estates and unrealized capital gains at the time of death (NBER Working Paper No. 7811). National Bureau of Economic Research. https://doi.org/10.3386/w7811

What the FIN 460 Module 5 instructions ask for

The Module Five assignment in FIN 460 commonly asks you to evaluate lifetime gifts as part of the client's plan. Expect to explain the federal gift tax, the annual exclusion and how gifts use the lifetime exclusion, gift splitting between spouses, and the basis rules that give a recipient the donor's basis rather than a stepped-up one. Many versions ask you to compare specific techniques, such as 529 plans, trusts for minors, irrevocable life insurance trusts or family entities for real estate, and to say whether the client should give now or leave the asset at death. A strong submission works from the client's real assets and heirs, includes the state's rules if the state taxes estates, and weighs each gift against the client's own cash needs.

How this FIN 460 Module 5 gifts and lifetime transfers assignment example is built

The sample sets out the 2026 annual exclusion of $19,000 per recipient and explains that the Lindqvists' gifts can stay entirely within it. It recommends $10,000 a year from each spouse to each of five grandchildren's 529 plans, $100,000 in all, plus the $19,000 annual maximum into Peter's ABLE account, removing about $119,000 a year from the estate without any return beyond a gift-splitting election if one is used. Dale's life policy moves to an irrevocable trust now, with Crummey notices, since a transfer within three years of death would be pulled back. The cabin, with a basis of about $210,000 and a value of $680,000, goes into a family LLC owned by Dale's trust but is not given away, so the children receive a stepped-up basis.

Where the FIN 460 Module 5 rubric puts the points

Instructors marking this assignment generally look at the accuracy of gift tax rules and figures for the year, the analysis of basis and income tax effects, the fit of each gifting technique to the client's goals, the treatment of state rules and the clarity of the recommendation. High marks go to papers that compare the estate tax saved by a gift with the capital gains tax it may create, that respect the client's cash needs and that handle a beneficiary on public benefits correctly. Papers lose credit for recommending the largest possible gifts without testing affordability, for gifting low-basis property without noting the lost step-up and for forgetting the three-year rule on life insurance.

FIN 460 Module 5 help: the mistakes that cost points

Students often treat every gift as a good gift. Before recommending one, ask three questions: does it reduce a tax the family would actually pay, does the client have enough left to live on, and what basis will the recipient receive? A gift of cash or high-basis property is usually clean. A gift of property with a large unrealized gain hands that gain to the recipient, which can cost more in income tax than the estate tax it saves, especially when the estate tax rate is the 13 percent of a state like Minnesota. Use the annual exclusion first, since it uses none of the lifetime exclusion and needs no return unless spouses split gifts. For any heir on SSI or Medicaid, route gifts through an ABLE account or a supplemental needs trust.

Get FIN 460 Module 5 written to your instructions

Send the FIN 460 Module 5 directions with the client's assets, basis figures and the people they want to help. We separate gifts that save tax from gifts that cost basis, size each yearly transfer and handle any trust or 529 paperwork the plan needs. Allow roughly two days; we do not bill a student's first paper. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 460 papers and related BS Finance samples

FIN 460 Module 5 questions, answered

Where can I find a free FIN 460 Module 5 Gifts and Transfers sample?

A complete FIN 460 Module 5 paper is on this page. It sizes yearly gifts to 529 plans and an ABLE account, moves a life policy into a trust and explains why a family cabin should not be gifted.

What is the annual gift tax exclusion for 2026?

$19,000 per recipient per donor, so a married couple can give $38,000 to each person each year without using any of their lifetime exclusion.

What basis does a person receive in gifted property?

Generally the donor's basis, called carryover basis, unlike inherited property, which usually receives a new basis equal to its value at death.

What is a Crummey power?

A short right given to trust beneficiaries to withdraw a gift made to the trust, which lets gifts to an irrevocable life insurance trust qualify for the annual exclusion.

Can parents give money to a child who receives SSI?

Gifts should go to an ABLE account, within the yearly limit, or to a supplemental needs trust, since money given directly counts toward the SSI and Medicaid asset limits.