| Course | OL 215 Principles of Management |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment developing a plan with an environmental analysis, specific goals and action steps for a new initiative |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 215 Module 2
The Fifth Café on a Gravel Lot: A Plan for Back Cove Coffee in South Portland
[Student Name]
Southern New Hampshire University
OL 215: Principles of Management
Planning Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Fifth Café on a Gravel Lot: A Plan for Back Cove Coffee in South Portland
Introduction
Back Cove Coffee Company has signed a letter of intent to lease a small building to be built on a gravel lot in South Portland, scheduled for completion next spring. The founders have asked me to plan and open the café. This paper analyzes the location and the company's position, sets goals, lays out the steps to opening and the first year and plans for the most likely problem: a slow start.
The Environment
The lot sits on a road carrying about 14,000 cars a day, most of them commuters headed toward the bridge into Portland between 6 and 9 a.m. A new 240-unit apartment complex next door will be fully occupied by summer, and two office buildings within a quarter mile house about 600 workers. The nearest competitors are a national chain drive-through 0.8 miles away, a gas station with self-serve coffee and a well-loved independent café a mile and a half away in the Knightville neighborhood. The national chain has the drive-through advantage; the independent has the loyalty of locals. No café near the site offers seating, local roasting or a quick walk-up window.
The Company
Back Cove's strengths are its coffee, roasted three miles away and well reviewed, its wholesale reputation, which means many South Portland residents already know the brand from restaurants and grocers, and an experienced team at the existing cafés. Its limits are equally clear. The founders' standards have been carried by their presence, and the existing cafés already differ in quality, a problem Milestone One will examine. The company has never opened a café without a founder on site. And it has about $420,000 for build-out, equipment and opening losses, with little room for overruns.
What the Analysis Says
Three conclusions follow. First, the morning commute is the largest opportunity, but the national chain owns the drive-through, so the café must win on speed at a walk-up window and quality, not convenience alone. Second, the apartments and offices offer an all-day base if the café gives people a reason to stay. Third, the company's greatest risk is internal: opening a café that does not meet its own standards because no founder is there to hold them.
Does Planning Pay?
Miller and Cardinal (1994), synthesizing more than two decades of research, found that strategic planning was positively associated with growth and profitability. Brinckmann et al. (2010), in a meta-analysis focused on small firms, found that business planning improved performance, with a stronger payoff for small firms already in business than for startups, which often lack the information to plan well. Back Cove is an established small firm with twelve years of café data, so a careful plan is likely to pay off, provided it is built on that data rather than on hopes.
Goals
Locke and Latham (2002), summarizing decades of research, reported that teams and individuals with a stretching, exact target did better than those simply urged to "do your best," especially when people accepted the goals and could see their progress. The goals are therefore stated in numbers with dates.
Goals for the South Portland café
| Goal | Target | Date |
|---|---|---|
| Open on schedule | Doors open | April 15 |
| Weekly sales | $9,000 by week 8; $14,000 by month 6 | As stated |
| Morning ticket time (order to hand-off) | Under 4 minutes, 7 to 9 a.m. | By week 4 |
| Staffing | 14 baristas hired and trained, 2 shift leads promoted from existing cafés | By April 1 |
| Quality | Pass the company's cup audit on 9 of 10 drinks | Monthly from week 2 |
| Break-even on monthly operating costs | Month 9; cumulative break-even month 14 | As stated |
The sales targets rest on the company's experience: its newest café, opened four years ago in a similar mixed residential and office area, reached $9,400 a week by week 8 and $13,800 by month 6.
Customers to Win
Three groups make up the likely customer base. Commuters want speed and quality between 6:30 and 8:30 a.m. and will judge the café by whether they can get a good drink in under four minutes without leaving the car line for long. Apartment residents, many of them young professionals and remote workers, want a comfortable place to sit for an hour, reliable wifi and a reason to walk next door rather than make coffee at home. Office workers want a midmorning and early afternoon break and are likely to order for coworkers. The menu, layout and staffing are built around all three: a walk-up window with a short commuter menu, 24 seats and outlets inside and a group-order option through the company's app.
Action Steps
Action plan
| Step | Owner | Due |
|---|---|---|
| Finalize lease and build-out budget | Founders | November 30 |
| Approve layout with a walk-up window and 24 seats | Writer; architect | December 15 |
| Order espresso machines and grinders | Writer | January 10 |
| Select two shift leads from existing cafés | Writer; other café managers | January 31 |
| Post barista openings; begin structured interviews | Writer | February 1 |
| Write café operating standards from the best café's practices | Writer; head of coffee quality | February 28 |
| Train new baristas at Commercial Street, two weeks each | Shift leads; head of coffee quality | March 1 to 31 |
| Soft opening for apartment residents and office workers | Writer | April 10 to 14 |
| Grand opening with wholesale partners invited | Founders; writer | April 15 |
| Weekly review of sales, ticket times and audits | Writer | From April 22 |
| Six-month review against goals | Writer; founders | October 15 |
| Decide on seasonal drive-through pilot | Founders | November 1 |
Risks and a Contingency
Three risks stand out: construction delays, hiring difficulties and a slow sales start. Construction delays are the landlord's to manage, and the lease includes rent abatement for late delivery. Hiring will begin early and draw on existing cafés for shift leads. The most likely problem is slow sales. If weekly sales are below $7,000 at week 8, the contingency is to cut afternoon hours to reduce labor, add a morning pre-order option for commuters through the company's app and run a two-week punch-card promotion with the apartment complex. If sales are still below $10,000 by month 4, the founders will review the café's model, including the drive-through pilot.
Conclusion
The plan aims the café at the morning commute and the new apartments, sets numbers to judge it by, assigns every step and prepares a response if the start is slow. It also exposes the problem the next milestone must address: the company has never written down the standards its founders carry in their heads.
References
Brinckmann, J., Grichnik, D., & Kapsa, D. (2010). Should entrepreneurs plan or just storm the castle? A meta-analysis on contextual factors impacting the business planning-performance relationship in small firms. Journal of Business Venturing, 25(1), 24-40. https://doi.org/10.1016/j.jbusvent.2008.10.007
Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705
Miller, C. C., & Cardinal, L. B. (1994). Strategic planning and firm performance: A synthesis of more than two decades of research. Academy of Management Journal, 37(6), 1649-1665. https://doi.org/10.5465/256804
What the OL 215 Module 2 instructions ask for
OL 215's Module 2 assignment centers on building a plan for an organization or a new initiative, applying the planning function of management. Expect to analyze the external environment and internal strengths and weaknesses, set goals, choose actions to reach them and explain how progress will be tracked. High-scoring papers base goals on the analysis rather than on wishes, write goals that are specific, measurable and time-bound, name who carries out each step and by when, consider risks and plan a contingency and use research on planning and goal setting. They keep the plan at a scale the organization can actually carry out, and they explain the assumptions behind any projections so a reader can judge them.
How this OL 215 Module 2 planning assignment example is built
The sample plans the fifth café of Back Cove Coffee Company, a composite Portland, Maine, roaster with four cafés. The site is a gravel lot in South Portland beside a new 240-unit apartment complex, on a road carrying about 14,000 commuter cars a day toward the bridge into Portland. The paper analyzes demand, three nearby competitors and the company's strengths and limits, sets goals for weekly sales, ticket times, hiring and break-even by month 14, lays out twelve action steps with owners and dates and plans a contingency if sales start slowly. Miller and Cardinal's synthesis of planning research, Brinckmann, Grichnik and Kapsa's meta-analysis on small-firm planning and Locke and Latham's goal-setting research support the approach.
Where the OL 215 Module 2 rubric puts the points
Planning papers in OL 215 are generally marked on a thorough analysis of the environment and the organization, goals that follow from the analysis and are specific and measurable, clear action steps with owners and dates, attention to risks and contingencies, use of planning research and organized writing. The best papers show the assumptions behind projections and make it easy to see what will be done, by whom and by when. Papers lose marks for listing strengths and weaknesses without drawing conclusions, setting goals such as "be successful" or "grow sales," leaving actions without owners, ignoring what could go wrong or presenting projections with no reasoning.
OL 215 Module 2 help: the mistakes that cost points
Start with the environment: customers, competitors, location and any trends that matter. Then look inward at the organization's strengths and limits for this initiative, such as staff, money and know-how. Draw conclusions: what does the analysis say the plan must do? Write three to five goals that are specific, measurable and dated. List the actions needed to reach them in order, each with an owner and a date. Ask what could go wrong and plan a response for the most likely problem. Explain the assumptions behind any numbers. Use research on planning and goals to justify your approach, and keep the plan realistic for the organization's size.
Get OL 215 Module 2 written to your instructions
Share the OL 215 Module 2 directions and the initiative you are planning. We analyze the environment and the organization's strengths and limits, set specific and measurable goals, lay out action steps with owners and dates and add a contingency, with research on planning behind each choice. The first planning paper is free and comes back within two days of your OL 215 request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 215 papers and related BS Business Administration samples
- OL 215 Module 1 Discussion: What Managers Actually Do
- OL 215 Module 3 Milestone One: Management Problem Analysis
- OL 215 Module 4 Discussion: Organizing and Decision Authority
- OL 215 Module 5 Milestone Two: Leadership Development Plan
- OL 215 Module 6 Control Systems Assignment: Controlling With Measures
- OL 215 Module 7 Final Project: Management Plan for Growth
- OL 215 Module 8 Discussion: Ethics in Everyday Management
- INT 422 Module 7 Final Project: The International Strategic Plan
- BUS 400 Module 3 Market Analysis Assignment: Sizing the Boston Market for Herbs and Microgreens
- HRM 425 Module 7 Final Project: The Employee Life Cycle Plan
- INT 315 Module 8 Discussion: Overtime in Peak Season
OL 215 Module 2 questions, answered
Where can I find a free OL 215 Module 2 planning sample?
This page holds the full OL 215 Module 2 plan for a composite coffee company's fifth café, with analysis, goals, action steps and a contingency.
Does planning improve business performance?
A synthesis of studies found strategic planning was linked to growth and profitability, and a meta-analysis found business planning paid off especially for established small firms.
What makes a good goal?
Decades of goal-setting studies favor targets that are precise and stretching over a loose "do your best," provided people accept the target and get feedback.
What is a contingency plan?
A planned response to a likely problem, prepared in advance so the organization can act quickly if results fall short.
How detailed should an action plan be?
Detailed enough that each step has an owner, a deadline and a way to tell whether it is done.