OL 215 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 215 Module 1 Discussion sample asks what managers actually do, compared with the tidy functions of planning, organizing, leading and controlling. SNHU OL 215 (OL-215) starts its BS Business Administration term on this question, and this post brings in Back Cove Coffee Company, a composite roaster with four cafés in Portland, Maine, and logs one day of its busiest café manager: 61 tasks in nine hours, most under five minutes, almost none of them planning. It applies classic observation of managerial work and research on effective managers and management practices, then asks classmates which function their own managers neglect.

CourseOL 215 Principles of Management
ModuleModule 1
Paper typeundergraduate discussion post comparing the textbook functions of management with what a manager actually does in a day
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 215 Module 1

1

Module One Discussion

A Day in the Life of a Café Manager

For this course I will study Back Cove Coffee Company, a composite roaster in Portland, Maine. It was started twelve years ago by two former baristas, roasts about 4,000 pounds of coffee a week, runs four cafés, sells wholesale to about 60 restaurants and grocers and employs 92 people on $7.8 million in sales. I manage the Commercial Street café, the busiest, with 17 baristas and two shift leads, and the founders have asked me to open a fifth café in South Portland next year.

What this page is doingThe organization.
2

Before answering this prompt, I logged one Tuesday shift, opening to mid-afternoon. I recorded 61 separate tasks. The longest, rebuilding the schedule after two call-outs, took 35 minutes in three interrupted pieces. Most lasted under five minutes: unjamming the grinder, covering the register during a rush, refunding a customer whose oat milk latte was made with dairy, approving a shift swap by text, signing for a pastry delivery that was short six croissants, answering a wholesale question meant for someone else. By the textbook's four functions, I spent nearly all day on a mix of leading and doing the work myself. I did no planning at all and controlled nothing beyond counting the drawer.

What this page is doingOne logged day.
3

Mintzberg (1971), after following executives through their days, found their days chopped into short, scattered, ever-changing pieces, with a strong preference for live conversation and current information over planning. My day fits his description at a much smaller scale. Luthans (1988) found that the managers whose units actually performed best, with productive and committed staff, spent more of their time on communication and developing their people than the managers who were promoted fastest. And across hundreds of manufacturing firms in several countries, basic practices such as monitoring operations, setting clear targets and rewarding performance went hand in hand with higher productivity and profits (Bloom & Van Reenen, 2007). Those are exactly the planning and controlling habits my day crowded out.

What this page is doingWhy the day looks like this.
4

If the manager of the busiest café spends her day putting out fires, a fifth café will mean five managers doing the same. The founders' standards have been held up by their presence. The company will need plans, structure and measures that hold them up instead.

What this page is doingWhat it means for a fifth café.
5

Which management function does your manager, or do you, neglect most, and what does it cost the organization?

What this page is doingYour manager.
6

References

Bloom, N., & Van Reenen, J. (2007). Measuring and explaining management practices across firms and countries. Quarterly Journal of Economics, 122(4), 1351-1408. https://doi.org/10.1162/qjec.2007.122.4.1351

Luthans, F. (1988). Successful vs. effective real managers. Academy of Management Executive, 2(2), 127-132. https://doi.org/10.5465/ame.1988.4275524

Mintzberg, H. (1971). Managerial work: Analysis from observation. Management Science, 18(2), B97-B110. https://doi.org/10.1287/mnsc.18.2.B97

What the OL 215 Module 1 instructions ask for

In the opening OL 215 discussion, students introduce an organization and reflect on what management means there, often by connecting the four functions of planning, organizing, leading and controlling to real managerial work. Expect to describe the organization, a manager's role and what that manager does in practice. Posts that earn the most credit compare the textbook functions with observed behavior, using a concrete example such as a logged day or a specific decision, cite research on managerial work rather than relying on definitions and draw a conclusion about which functions get squeezed out and why. A short, specific introduction gives classmates something real to respond to and sets up the organization for the rest of the term.

How this OL 215 Module 1 discussion example is built

The sample introduces Back Cove Coffee Company, a composite Portland, Maine, roaster with four cafés, about 60 wholesale accounts and 92 employees. The writer, who manages the busiest café, logged her own nine-hour day: 61 separate tasks, from fixing a grinder and covering the register to calming a customer and approving a schedule swap, with most lasting under five minutes and none spent on planning. Mintzberg's study of managerial work, Luthans's comparison of successful and effective managers and Bloom and Van Reenen's research on management practices explain why the planning and controlling functions keep losing to the urgent. The post asks classmates which function their own managers neglect, and what it costs.

Where the OL 215 Module 1 rubric puts the points

Graders of the first OL 215 post want to meet an actual organization quickly, an honest comparison between the functions of management and actual managerial work, use of research beyond textbook definitions, a conclusion about what the comparison means and replies that add a new example or question. Top posts use concrete evidence, such as a log of tasks or a specific week, and explain why some functions are crowded out. Posts lose credit when they define the four functions without applying them, describe an ideal manager rather than a real one, blame individual managers for problems built into the job or reply to classmates with simple agreement.

OL 215 Module 1 help: the mistakes that cost points

Pick an organization you know and one manager in it, possibly yourself. Briefly describe the organization and the manager's role. Then gather evidence of what the manager actually does: keep a log for a day, or recall a typical week in detail. Sort the activities by function, planning, organizing, leading and controlling, and notice which dominate and which are missing. Use research on managerial work to explain the pattern rather than simply criticizing the manager. Draw one conclusion about what the organization should change so that neglected functions get time. End with a question that asks classmates which function their managers neglect, and reply with an example from your own experience.

Get OL 215 Module 1 written to your instructions

Send the Module 1 prompt for OL 215 and a sentence about the organization you will study. We compare what its managers actually do with the four functions of management, explain the gap with research on managerial work and good management practice and end by asking classmates about their own managers. The first post comes free within two days of your OL 215 request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 215 papers and related BS Business Administration samples

OL 215 Module 1 questions, answered

Where can I find a free OL 215 Module 1 Discussion sample?

This page carries the full OL 215 Module 1 post, which compares a café manager's logged 61-task day with the four functions of management.

What are the four functions of management?

Planning, organizing, leading and controlling: setting goals and plans, arranging people and resources, guiding and motivating people and monitoring results against goals.

What did Mintzberg find about managers' work?

That it consists of many brief, varied and fragmented activities, with a strong preference for conversation and current information over reflective planning.

What makes a manager effective rather than just successful?

Research found that managers whose units performed best spent more time communicating and developing their people, while those promoted fastest spent more time networking.

Do management practices affect company performance?

Large studies found that firms using basic practices such as monitoring, clear targets and performance-based incentives were more productive and profitable.