| Course | OL 215 Principles of Management |
|---|---|
| Module | Module 3 |
| Paper type | undergraduate milestone analyzing a management problem in an organization and its causes across the functions of management |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 215 Module 3
Four Cafés, Four Different Cups: A Management Problem Analysis for Back Cove Coffee
[Student Name]
Southern New Hampshire University
OL 215: Principles of Management
Milestone One: Management Problem Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Four Cafés, Four Different Cups: A Management Problem Analysis for Back Cove Coffee
Introduction
Back Cove Coffee Company built its reputation on one promise: that every cup tastes the way the founders intended. That promise now depends on which café a customer walks into. As the company prepares to open a fifth café, this milestone analyzes why quality varies so much among the existing four, using the functions of management to trace the causes, and sets out the questions the final plan must answer.
The Evidence
Quality and staffing by café, past 12 months
| Café | Cup audit pass rate | Customer complaints | Barista turnover | Average morning ticket time |
|---|---|---|---|---|
| Commercial Street | 88% | 41 | 52% | 3 min 40 s |
| Munjoy Hill | 81% | 37 | 61% | 4 min 10 s |
| Deering | 63% | 96 | 89% | 5 min 30 s |
| Westbrook | 52% | 118 | 94% | 6 min 05 s |
| All cafés | 71% | 292 | 74% | 4 min 50 s |
The head of coffee quality audits ten drinks at each café monthly, checking dose, extraction time, milk texture and temperature against her own standards. Two cafés pass most drinks; two fail almost half. Complaints, mostly about weak or sour espresso, scorched milk and long waits, follow the same pattern. So does turnover: the two weaker cafés replace nearly all their baristas each year.
What Customers Notice
A reading of all 292 complaints from the past year shows what customers experience. About 40 percent concern taste, most often espresso described as sour or bitter and milk drinks described as too hot or flat. About 35 percent concern waits, especially at Westbrook and Deering between 7 and 9 a.m. The rest concern orders made wrong, cleanliness and staff who seemed unsure. Several regular customers wrote that they drive past the Westbrook café to buy coffee at Commercial Street, a sign that the quality gap is costing sales at the cafés that need them most.
The First Explanation
The founders believe the weaker cafés simply hired worse baristas. But the four cafés hire from the same labor market, at the same wage, through the same job posting. When I compared baristas who transferred between cafés, their audit results changed with the café, not with the person: two strong baristas from Commercial Street who moved to Westbrook passed fewer drinks within two months. Something about how the cafés are managed is producing the difference.
Planning
No written standards exist. The founders taught the first baristas themselves, and those baristas taught the next. Commercial Street, the founders' first café, still has three of those early baristas, who train every new hire for two weeks. Westbrook, opened four years ago, has none; new baristas there learn from whoever is on shift. Inside one large retail chain, Ton and Huckman (2008) saw that turnover did less harm to store results where staff stuck closely to the standard way of working. Back Cove's strongest café has a living standard in its veteran baristas; its weakest has none, so every departure takes knowledge with it.
Organizing
Authority over quality is unclear. The head of coffee quality sets standards and audits, but she has no authority over café staff, and café managers report to the founders, not to her. When she finds a problem, she tells the café manager, who may or may not act. Café managers decide on their own grinder settings, milk suppliers and training, so the four cafés have drifted apart in small ways that add up.
Leading
All four café managers were promoted because they were excellent baristas. None received training in leading a team, giving feedback or running a schedule, and the two managers of the weaker cafés were promoted within a year of being hired. Nutt (1999), studying several hundred decisions in organizations, reported that roughly one decision in two failed, most often when managers used tactics such as imposing an idea without analysis and limiting the search for alternatives. The weaker cafés show this pattern. When quality falls, managers react quickly, for example by changing the grind or blaming the milk, without examining what changed.
Controlling
The only number every manager watches is daily sales. Audit scores land in the founders' inboxes and seldom come up again. Nobody tracks ticket times; the figures above come from the point-of-sale system and were pulled for this analysis. Firms that watch operations, set targets and tie rewards to performance tend to be more productive and profitable than firms that do not (Bloom & Van Reenen, 2007). Back Cove measures the outcome it cares about least, sales, which are driven partly by location, and ignores the processes that determine quality.
How the Causes Connect
The causes reinforce one another. With no written standards, quality depends on veteran baristas. With unclear authority, no one can require a struggling café to change. With untrained managers, problems are met with quick fixes. With no measures, no one notices until customers complain. Poor quality and chaotic shifts drive baristas away, which removes more knowledge and lowers quality further. Hiring better baristas, the founders' preferred fix, would not break this cycle; new baristas would enter the same system.
What Managers Control
Nearly every cause is within management's reach. Writing standards, clarifying authority, training managers and choosing measures require time and modest money, not new markets or capital. Wages, which baristas mention as a reason for leaving, are a decision for the founders and are discussed in the final plan, but the transfer evidence shows that wages alone do not explain why the same barista performs differently in different cafés.
Problem Statement
Back Cove Coffee Company's cafés serve inconsistent quality, with audit pass rates from 52 to 88 percent, because the company has no written standards, unclear authority over quality, managers untrained in leading and measures that track sales but not the processes behind quality, producing a cycle of complaints and turnover that will spread to a fifth café unless management changes. The final plan must answer four questions. What standards should every café follow, and how will they be taught? Who should have authority over quality? How should café managers be selected and developed? And what should every café measure and review?
References
Bloom, N., & Van Reenen, J. (2007). Measuring and explaining management practices across firms and countries. Quarterly Journal of Economics, 122(4), 1351-1408. https://doi.org/10.1162/qjec.2007.122.4.1351
Nutt, P. C. (1999). Surprising but true: Half the decisions in organizations fail. Academy of Management Executive, 13(4), 75-90. https://doi.org/10.5465/ame.1999.2570556
Ton, Z., & Huckman, R. S. (2008). Managing the impact of employee turnover on performance: The role of process conformance. Organization Science, 19(1), 56-68. https://doi.org/10.1287/orsc.1070.0294
What the OL 215 Module 3 instructions ask for
Milestone One in OL 215 commonly asks you to identify a management problem in an organization and analyze it using the functions of management. Plan to introduce the organization, show how big the problem is and what it costs and analyze its causes in planning, organizing, leading and controlling. Strong milestones define the problem specifically, support it with data, look past the first explanation managers offer and show how causes in different functions connect. They use research rather than opinion and separate symptoms, such as complaints, from causes, such as missing standards. They close by stating the problem crisply and listing what the OL 215 final plan has to resolve, without leaping ahead to detailed solutions.
How this OL 215 Module 3 milestone one example is built
The sample analyzes inconsistent quality at Back Cove Coffee Company, a composite roaster with four cafés in Portland, Maine. Cafés pass the company's monthly cup audit between 52 and 88 percent of the time, complaints cluster at two cafés and barista turnover runs at 74 percent. The analysis traces the problem through each function: no written standards or training plan, unclear authority between café managers and the head of coffee quality, managers promoted for barista skill without leadership training and no measures beyond daily sales. Ton and Huckman's research on process conformance and turnover, Nutt's study of failed decisions and Bloom and Van Reenen's evidence on management practices explain the pattern.
Where the OL 215 Module 3 rubric puts the points
Grading for the first OL 215 milestone typically weighs a specific, well-evidenced problem, analysis of causes across all four functions of management, use of research to test explanations, recognition of how causes connect, a clear problem statement and orderly, sourced writing. Strong OL 215 submissions show data in tables, look past the explanation managers give first and separate what managers control from what they do not. Submissions lose credit for defining the problem vaguely, assigning it to a single function, blaming individual employees, relying on opinion without evidence or proposing solutions before the causes are clear. Showing that the same employee performs differently in different units is strong evidence.
OL 215 Module 3 help: the mistakes that cost points
Choose a problem you can show with data, such as quality, delays, turnover or complaints, and describe it specifically. Gather evidence: numbers over time, comparisons between units and what employees and customers say. Write down the explanation managers usually give, then test it. Work through each function of management: Is there a plan or standard? Is it clear who decides? Are people led and trained to do the work? Is anything measured besides sales or cost? Use research to explain how gaps in each function produce the problem, and show how they reinforce one another. Finish with a short OL 215 problem statement and the questions your plan will take up.
Get OL 215 Module 3 written to your instructions
Send the brief for Milestone One in OL 215 and what you know about the problem in your organization. We define it with evidence, trace its causes through planning, organizing, leading and controlling, test the usual explanations against research and finish with a statement of the problem your OL 215 plan will fix. Your first milestone is free and is back within two days of the OL 215 request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 215 papers and related BS Business Administration samples
- OL 215 Module 1 Discussion: What Managers Actually Do
- OL 215 Module 2 Planning Assignment: Planning and Goal Setting
- OL 215 Module 4 Discussion: Organizing and Decision Authority
- OL 215 Module 5 Milestone Two: Leadership Development Plan
- OL 215 Module 6 Control Systems Assignment: Controlling With Measures
- OL 215 Module 7 Final Project: Management Plan for Growth
- OL 215 Module 8 Discussion: Ethics in Everyday Management
- MKT 400 Module 2 Brand Audit Assignment: Auditing the Ironjacks Brand
- BUS 206 Module 3 Torts Assignment: A Hard Landing and a Damaged Chile Field
- HRM 300 Module 2 Journey Mapping Assignment: A Housekeeper's First Ninety Days
- OL 125 Module 1 Discussion: Why Human Relations Matter
OL 215 Module 3 questions, answered
Where can I find a free OL 215 Module 3 Milestone One sample?
You can read the full OL 215 Milestone One here: why four cafés of a composite coffee company serve four different cups, with data and causes.
How do I analyze a management problem?
Define it with evidence, then trace its causes through planning, organizing, leading and controlling, testing common explanations against data and research.
What is process conformance?
The degree to which employees follow an organization's standard procedures; research found that stores with higher conformance suffered less when turnover was high.
Why do so many management decisions fail?
A study of hundreds of decisions found that about half failed, often because managers imposed solutions or limited their search for alternatives instead of analyzing the problem.
What is a problem statement?
A concise description of the problem, its evidence, its causes and its effects, written so that a plan can target the causes.