OL 215 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 215 Module 4 Discussion sample asks how an organization should divide decisions between the center and its local managers. SNHU OL 215 (OL-215) brings BS Business Administration students to organizing and structure after their problem analysis. The post examines Back Cove Coffee Company, a composite Portland, Maine, roaster where each café manager sets grinder settings, chooses milk and orders pastries, while the head of coffee quality can only advise. It uses research on organizational configurations, standard processes and management practices to propose centralizing what defines the product and leaving local choices local, then asks classmates where their organization draws the line.

CourseOL 215 Principles of Management
ModuleModule 4
Paper typeundergraduate discussion post on organizational structure, centralization and who should decide what
LengthAbout 330 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 215 Module 4

1

Module Four Discussion

Who Decides the Pastry Order

At Back Cove Coffee Company, each of the four café managers decides almost everything: grinder settings and espresso recipes, which dairy and oat milk to buy, pastry orders, schedules, music, local events and even which syrups to stock. The head of coffee quality audits every café monthly and writes up problems, but she reports to the founders, not to the café managers, and has no authority to require a change. The founders used to settle disagreements by walking in. With four cafés and a fifth on the way, they rarely do.

What this page is doingHow decisions are made now.
2

Mintzberg (1980) described five common organizational configurations. Back Cove started out as what he called a simple structure, held together by the founders watching everything themselves. With four cafés and a roastery, that coordination has broken down, and nothing has replaced it. A chain of cafés needs some of what Mintzberg called standardization of work processes: the same recipe, the same grind, the same milk, wherever a customer walks in.

What this page is doingWhat structure the company has outgrown.
3

Research inside a big retail chain by Ton and Huckman (2008) points the same way: where employees kept to standard processes, high turnover cost stores less. With barista turnover of 74 percent, Back Cove needs exactly that protection. Companies with closer monitoring and clearer targets tend to perform better (Bloom & Van Reenen, 2007). Today no one has the authority to monitor and require the standard.

What this page is doingWhat the research says about standards.
4

Centralize the decisions that define the cup: recipes, grinder and machine settings, milk and bean suppliers and the barista training curriculum, all owned by the head of coffee quality, with authority to require changes. Leave with café managers the decisions that need local knowledge: schedules, pastry quantities, music, local events and staff assignments. A customer should taste the same cortado in Westbrook and on Commercial Street, but the Westbrook manager knows better than anyone how many croissants sell on a Tuesday.

What this page is doingWhere I would draw the line.
5

Which decision in your organization is made in the wrong place, too high or too low, and how can you tell?

What this page is doingYour organization.
6

References

Bloom, N., & Van Reenen, J. (2007). Measuring and explaining management practices across firms and countries. Quarterly Journal of Economics, 122(4), 1351-1408. https://doi.org/10.1162/qjec.2007.122.4.1351

Mintzberg, H. (1980). Structure in 5's: A synthesis of the research on organization design. Management Science, 26(3), 322-341. https://doi.org/10.1287/mnsc.26.3.322

Ton, Z., & Huckman, R. S. (2008). Managing the impact of employee turnover on performance: The role of process conformance. Organization Science, 19(1), 56-68. https://doi.org/10.1287/orsc.1070.0294

What the OL 215 Module 4 instructions ask for

This OL 215 discussion usually asks you to apply concepts of organizing, such as structure, centralization, span of control or authority, to a real organization. Expect to describe how the organization is structured and how decisions are made, then judge whether the arrangement fits what the organization needs. Posts that score well map specific decisions to the people who make them, use research on organizational design rather than definitions alone, consider the trade-off between consistency and local flexibility and propose a change with reasons. They recognize that structure should change as an organization grows, and that the right answer is usually to centralize some decisions and decentralize others rather than to choose one approach for everything.

How this OL 215 Module 4 discussion example is built

The sample examines decision rights at Back Cove Coffee Company, a composite roaster with four cafés in Portland, Maine. Café managers set their own grinder settings and recipes, choose milk suppliers and order pastries, while the head of coffee quality can advise but not require changes, and audit results range from 52 to 88 percent. Mintzberg's configurations show the company has outgrown a simple structure built around its founders; Ton and Huckman's research shows standard processes protect performance amid turnover; Bloom and Van Reenen link monitoring and targets to results. The post proposes centralizing recipes, equipment settings and suppliers under the head of coffee quality and leaving schedules, pastry quantities and local events to café managers.

Where the OL 215 Module 4 rubric puts the points

In OL 215, this organizing discussion is generally marked on an accurate description of the current structure, specific mapping of decisions to decision makers, correct use of research on organizational design, a reasoned judgment about centralization, a practical proposal and replies that test classmates' structures. Top posts separate the decisions that define the product from those that depend on local conditions. Posts lose credit when they recommend centralizing or decentralizing everything, describe an organizational chart without discussing decisions, ignore the organization's size and growth or answer peers by agreeing instead of asking about a specific decision. Naming who gains and loses authority shows maturity.

OL 215 Module 4 help: the mistakes that cost points

List ten or so recurring decisions in your organization, from small to large, and note who makes each one today. Ask which decisions shape what customers experience everywhere, such as product standards or pricing, and which depend on local knowledge, such as staffing or local promotions. Use research on organizational design to explain why the current arrangement developed and whether it still fits. Consider growth: a structure that worked with one location may not work with five. Propose a division of decisions with reasons, noting who would gain and lose authority. End by asking classmates where their organization draws the line, and reply with a question about one decision they described.

Get OL 215 Module 4 written to your instructions

Send the Module 4 prompt for OL 215 and a description of how decisions are divided in your organization. We map who decides what, apply research on structure and standard processes and propose which decisions to centralize and which to leave with local managers, then ask the class where their own organization draws the line. The first post is free and ready within two days of your OL 215 request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 215 papers and related BS Business Administration samples

OL 215 Module 4 questions, answered

Where can I find a free OL 215 Module 4 Discussion sample?

The whole OL 215 Module 4 post is on this page: which decisions a composite coffee company should centralize and which its café managers should keep.

What is centralization?

The degree to which decisions are made at the top or center of an organization rather than delegated to managers in individual units.

What are Mintzberg's structural configurations?

Five common forms of organization, the simple structure, machine bureaucracy, professional bureaucracy, divisionalized form and adhocracy, each fitting different conditions.

Should a growing company centralize decisions?

Usually some of them. Decisions that define the product and brand often benefit from central control, while decisions requiring local knowledge are better left to local managers.

How do standard processes help when turnover is high?

Research found that stores where employees followed standard procedures closely suffered less damage to performance when staff turned over.