| Course | MKT 400 Strategic Brand Management |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment conducting a brand audit with inventory and exploratory research |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 400 Module 2
Rugged, Sincere and Inconsistent: A Brand Audit of the Fort Smith Ironjacks
[Student Name]
Southern New Hampshire University
MKT 400: Strategic Brand Management
Brand Audit Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Rugged, Sincere and Inconsistent: A Brand Audit of the Fort Smith Ironjacks
Introduction
The Fort Smith Ironjacks have played minor-league hockey in a 5,200-seat Arkansas arena since 1998 and average about 3,900 fans a night, with a crowd that is getting older. Their new owner believes a new name and look would attract younger fans. Before anyone redesigns anything, the team needs an honest picture of its brand: what it currently presents and what people, fans and non-fans alike, think and feel about it. This audit provides that picture, organized around the sources of brand equity.
Brand Inventory
Brand inventory
| Element or touchpoint | Current state | Consistency |
|---|---|---|
| Name | "Ironjacks," since 1998 | Consistent |
| Logo | Three versions in use: the 1998 crest, a 2008 refresh and a simplified 2016 mark | Inconsistent |
| Colors | Steel gray and orange, but merchandise uses three shades of orange | Inconsistent |
| Mascot | Rivet, a figure in a hard hat and work boots | Consistent and popular |
| Uniforms | 2016 mark on jerseys; 2008 version on warm-up gear | Inconsistent |
| Arena signage | Mostly 1998 crest | Dated |
| Social media and website | 2016 mark, but older photos throughout | Mixed |
| Slogan | "Built Tough" on some materials, none on others | Inconsistent |
The brand's elements tell several stories at once. A fan who sees the arena signs, the jerseys and the social pages in the same night meets three different versions of the team, and a newcomer has no single image to remember.
Research Method
A survey of 780 fans was taken at four home games and online among ticket buyers. A separate survey of 300 residents of the metro area who had not attended in two years was recruited through a local panel. Both measured unaided and aided awareness, open-ended associations, ratings on team association dimensions and brand personality. Eight short interviews with longtime fans, lapsed fans and local business owners added depth.
Awareness
Awareness is a clear strength. Asked to name professional or minor-league teams in the region without prompting, 91 percent of fans and 64 percent of non-attenders named the Ironjacks; aided recognition reached 97 percent among non-attenders. Keller (1993) defined brand awareness in terms of recognition and recall and treated it, along with brand image, as one of the two components of customer-based brand equity. The Ironjacks do not have an awareness problem; any change of name would put that strength at risk, since awareness built over 25 years would have to be rebuilt from nothing.
Associations
Gladden and Funk (2002) developed a model of team brand associations covering attributes such as success, star players, logo design and tradition, benefits such as nostalgia, pride in place, escape and peer group acceptance and attitudes such as affect and knowledge. Using items adapted from their scale, the audit compared the two groups.
Team brand associations, mean ratings out of 7
| Association | Fans | Non-attenders |
|---|---|---|
| Tradition | 6.3 | 5.1 |
| Nostalgia | 6.0 | 4.2 |
| Pride in place | 6.1 | 4.6 |
| Escape | 5.4 | 3.3 |
| Peer group acceptance | 4.9 | 2.8 |
| Success | 4.1 | 3.6 |
| Logo design | 4.4 | 3.0 |
Fans hold strong, favorable associations with tradition, nostalgia and pride in place, and these are the brand's most unique associations: no other entertainment option in Fort Smith has a 25-year local story. Non-attenders share the tradition association but not the benefits; they do not see a game as an escape or as something their friends do. The logo scores poorly with both groups.
Personality
The survey also used the brand personality framework of Aaker (1997), which covers ruggedness, sincerity, excitement, competence and sophistication. Fans rated the Ironjacks highest on ruggedness and sincerity. Non-attenders agreed on ruggedness but rated the team low on excitement, and in open answers often used words such as "old-school" and "my dad's team."
What the Interviews Added
The eight interviews explained several survey patterns. Longtime fans described games as a family ritual, often three generations in the same row, and several had Rivet bobbleheads from the 2000s on their shelves. Lapsed fans had mostly drifted away when their children grew up, not because of anything the team did. Two local business owners said they sponsor the team because it "feels like Fort Smith," and one warned that a new name would make the team "feel like it was bought by somebody from somewhere else." A young resident who had never attended said she would go "if my friends did," which echoes the low peer-acceptance score among non-attenders and suggests that the brand's problem with younger people is social as much as visual.
Competitors for Attention
The Ironjacks compete less with other hockey teams than with everything else people in Fort Smith do on a winter Friday: high school basketball, a new entertainment complex with bowling and arcade games, streaming at home and the drive to larger cities for concerts. Against these, the team's points of difference are live professional sport, a local story and a price of about $18 for a seat. Its points of parity, a comfortable night out with food and drinks, are weaker than the entertainment complex's, which matters for younger audiences.
Sources of Equity and Gaps
The brand's equity rests on near-universal awareness, a genuine local heritage and a rugged, sincere personality that fans love. Its weaknesses are an inconsistent and dated visual identity, little sense of excitement and weak social benefits among people who do not attend. The gap is not that the brand is unknown or disliked; it is that, for younger residents, it feels like someone else's tradition.
Issues for Strategy
Four issues follow. Can the team add excitement and a social reason to attend without discarding the heritage that is its most unique asset? Should it change the name, or refresh the visual identity and keep the name? How should it settle on one logo and color system? And what role should Rivet, the brand's most loved element, play in reaching younger fans?
Conclusion
The Ironjacks brand is strong where it is old and weak where it needs to be new. The audit points away from the name and toward how the brand looks and what it offers younger people, a distinction that should shape every decision the owner makes next.
References
Aaker, J. L. (1997). Dimensions of brand personality. Journal of Marketing Research, 34(3), 347-356. https://doi.org/10.1177/002224379703400304
Gladden, J. M., & Funk, D. C. (2002). Developing an understanding of brand associations in team sport: Empirical evidence from consumers of professional sport. Journal of Sport Management, 16(1), 54-81. https://doi.org/10.1123/jsm.16.1.54
Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. Journal of Marketing, 57(1), 1-22. https://doi.org/10.1177/002224299305700101
What the MKT 400 Module 2 instructions ask for
The brand audit in MKT 400 generally asks for a comprehensive examination of a brand's health: a brand inventory of how the brand is currently presented and an exploratory look at what consumers think and feel about it, leading to an assessment of its sources of equity, strengths and weaknesses. A strong audit catalogs every brand element and touchpoint, checks them for consistency, uses actual customer research on awareness, associations and personality, compares current customers with people the brand wants to reach and organizes the findings with a recognized model. It ends with the issues that strategy must address, since the audit is the foundation for positioning work in the milestones.
How this MKT 400 Module 2 brand audit assignment example is built
The sample audits the Fort Smith Ironjacks. The inventory finds the 1998 wordmark, a hard-hat mascot named Rivet and three versions of the logo in use at once, with arena signs, uniforms and merchandise disagreeing on colors. The exploratory surveys 780 fans and 300 residents who have not attended in two years and adds eight interviews. Awareness is near universal; fans hold strong tradition, nostalgia and pride-in-place associations, while non-attenders see the team as dated and hold weak excitement associations. Personality reads as rugged and sincere. Keller's model, Gladden and Funk's team associations and Aaker's personality dimensions organize the findings into sources of equity and gaps. It ends with four issues the brand strategy must resolve.
Where the MKT 400 Module 2 rubric puts the points
Brand audits are typically graded on the completeness of the inventory, the quality of consumer research, the use of a brand equity framework, the comparison between segments, the identification of strengths and weaknesses and writing. The best audits show the brand's elements side by side, report real numbers on awareness and associations, organize associations by strength, favorability and uniqueness and distinguish what current customers think from what prospects think. Points drop for audits that only describe the company's own view, that skip consumer research, that list associations without evaluating them or that ignore inconsistencies in how the brand is presented. Clear tables and a short summary of key issues earn credit.
MKT 400 Module 2 help: the mistakes that cost points
Start by collecting everything that carries the brand: logos, colors, uniforms, signs, merchandise, websites, social accounts and advertising. Lay them side by side and note inconsistencies. Then find out what people think: survey current customers and people you want to attract, asking what comes to mind, how they feel and what personality the brand has. Organize the results using a brand equity model. Compare groups, since the gap between them is often the main finding. End with the issues the strategy must resolve. Keep your survey questions open enough to catch associations you did not expect. Photograph the brand's touchpoints side by side; inconsistencies are easier to see than to describe.
Get MKT 400 Module 2 written to your instructions
Send the MKT 400 Module 2 directions and the brand you are auditing. We build the brand inventory, gather or interpret customer research on awareness, associations and personality, compare groups and identify where equity comes from and where it is weak. A first brand audit is free and usually takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 400 papers and related BS Marketing samples
- MKT 400 Module 1 Discussion: What a Hockey Team's Name Is Worth
- MKT 400 Module 3 Milestone One: Positioning and Brand Identity
- MKT 400 Module 4 Discussion: Rename or Refresh
- MKT 400 Module 5 Milestone Two: Brand Elements, Architecture and Extensions
- MKT 400 Module 6 Brand Equity Measurement Assignment: Measuring Brand Equity
- MKT 400 Module 7 Final Project: Strategic Brand Management Plan
- MKT 400 Module 8 Discussion: Reflecting on Brand Management
- HRM 200 Module 1 Discussion: More Than Payroll and Paperwork
- BUS 206 Module 2 Court System Assignment: Which Court Hears a Passenger's Claim
- QSO 435 Module 2 Backlog and Release Planning Assignment: Visitor Stories and Planning Poker
- MKT 455 Module 2 Audience Research Assignment: Audience Research and Social Listening
MKT 400 Module 2 questions, answered
Where can I find a free MKT 400 Module 2 Brand Audit Assignment sample?
A complete MKT 400 Module 2 brand audit is posted here, examining a minor-league hockey team's elements, associations and personality.
What is a brand audit?
A comprehensive examination of a brand's health that inventories how the brand is presented and explores what consumers know and feel about it, to find its sources of equity.
What is a brand inventory?
A catalog of every brand element and touchpoint, such as logos, colors, products, signage and communications, checked for consistency.
What should a brand audit measure?
Awareness, the strength, favorability and uniqueness of associations, brand personality and attitudes, among current customers and the people the brand wants to reach.
Why compare current customers with non-customers in a brand audit?
The gap shows whether the brand's image appeals beyond its base and what stops others from engaging with it.