MKT 400 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 400 Module 4 Discussion sample asks when a brand should change its name and look and when it should refresh what it has. SNHU MKT 400 (MKT-400) turns to brand change, revitalization and the risks of redesign in this module of the BS Marketing course. This post follows the Fort Smith Ironjacks, a composite minor-league hockey team whose new owner prefers a new name and logo. It compares a full rename with a refresh that keeps the name and mascot, using research on how committed customers react to logo redesigns and on emotional attachment to brands, and asks classmates when a rename is worth the risk.

CourseMKT 400 Strategic Brand Management
ModuleModule 4
Paper typeundergraduate discussion post on brand change, logo redesign and brand commitment
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 400 Module 4

1

Module Four Discussion

Keep the Name, Change the Night

The new owner of the Fort Smith Ironjacks, the composite minor-league team I am following, wants a new name and logo by next season to attract younger fans. His design firm has proposed three names, none with a local meaning. Season ticket holders have heard the rumor, and the team's Facebook page is full of angry comments. Several longtime fans have written that they will not renew if the name goes.

What this page is doingThe owner's plan.
2

Option one is a full rebrand: new name, new logo, new colors. Option two is a refresh: keep the name and Rivet the mascot, replace the three logos now in use with one sharper version of the crest, and change the game night itself, with louder music, better lighting, a student section and cheaper group tickets.

What this page is doingTwo options.
3

Walsh et al. (2010) ran a field experiment with 632 respondents and two athletic shoe brands and found that the more a familiar angular logo was rounded off, the more harshly strongly committed customers judged it, while weakly committed customers reacted positively. Thomson et al. (2005) developed a scale for the strength of consumers' emotional attachments to brands, and Park et al. (2010) showed that attachment, more than attitude strength, predicts difficult behaviors such as defending the brand and spending more on it. The Ironjacks' longtime fans are exactly the attached, committed customers who would punish a rename, and they buy most of the tickets. Younger residents, by contrast, have little attachment to lose, so a new name would not move them much on its own; what they lack is a reason to show up.

What this page is doingWhat research says about change.
4

I would refresh. The audit found the problem with younger residents is the experience and the look, not the name; non-attenders already know the team, they just do not see a reason to go with friends. A refresh fixes that at a fraction of the cost and keeps Rivet, the slogan and the story intact. A rename risks the attached fans for a gain the evidence does not promise. When do you think a full rename is worth that risk?

What this page is doingMy recommendation, and a question.
5

References

Park, C. W., MacInnis, D. J., Priester, J., Eisingerich, A. B., & Iacobucci, D. (2010). Brand attachment and brand attitude strength: Conceptual and empirical differentiation of two critical brand equity drivers. Journal of Marketing, 74(6), 1-17. https://doi.org/10.1509/jmkg.74.6.1

Thomson, M., MacInnis, D. J., & Park, C. W. (2005). The ties that bind: Measuring the strength of consumers' emotional attachments to brands. Journal of Consumer Psychology, 15(1), 77-91. https://doi.org/10.1207/s15327663jcp1501_10

Walsh, M. F., Winterich, K. P., & Mittal, V. (2010). Do logo redesigns help or hurt your brand? The role of brand commitment. Journal of Product & Brand Management, 19(2), 76-84. https://doi.org/10.1108/10610421011033421

What the MKT 400 Module 4 instructions ask for

The Module 4 discussion in MKT 400 usually asks about managing brands over time, such as revitalizing, repositioning, redesigning logos or renaming, and the risks involved. A strong post compares concrete options for a specific brand, considers how different groups of customers will react, uses research on brand commitment, attachment or redesign rather than famous anecdotes and recommends a path with reasons. It recognizes that the customers most attached to a brand may resist change most, and that losing them can cost more than the change gains, especially for a local brand whose loyal base pays most of the bills. Specific numbers from your own audit make the case stronger than general claims.

How this MKT 400 Module 4 discussion example is built

In the sample, the owner of the Fort Smith Ironjacks prefers a new name and logo to attract younger residents. The post compares that with a refresh: keep the name and Rivet the mascot, replace three competing logos with one, and make the game night louder and more social. It cites Walsh, Winterich and Mittal's field experiment, in which strongly committed customers judged redesigned logos more harshly while weakly committed ones liked them, Thomson, MacInnis and Park's emotional attachment scale and Park and colleagues' finding that attachment predicts difficult behaviors better than attitude strength. It recommends the refresh and asks when a rename would be worth it. It also notes that the fans most likely to protest are the ones who renew season tickets every spring.

Where the MKT 400 Module 4 rubric puts the points

Brand change discussions are typically graded on understanding of the options and their risks, attention to different customer groups, use of research on commitment or attachment, the soundness of the recommendation and replies. Strong posts set out options concretely, predict reactions by segment, use evidence about redesign and attachment and make a reasoned call. Posts lose points for assuming change is always good or always bad, for ignoring loyal customers, for relying on anecdotes about famous rebrands and for replies limited to agreement. Naming what would make the writer change his or her mind shows balanced judgment. Clear structure and a closing question that invites real debate also earn credit.

MKT 400 Module 4 help: the mistakes that cost points

Lay out two or three realistic options, from small refresh to full rename, and what each would change. Ask who loves the current brand, who ignores it and how each group would react. Use research on how committed customers respond to redesign and on emotional attachment. Recommend one option, and say what evidence would change your recommendation. Keep the post short and specific. Ask classmates when they think a full rename is worth the risk, since the question invites examples from their own experience. Check that every claim about how fans will react rests on a source or on your audit.

Get MKT 400 Module 4 written to your instructions

Paste the MKT 400 Module 4 prompt and the brand change you are weighing. We compare a rename with a refresh, apply research on commitment and attachment and recommend a path, ending with a question that tests classmates' instincts. The first post is free and arrives in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 400 papers and related BS Marketing samples

MKT 400 Module 4 questions, answered

Where can I find a free MKT 400 Module 4 Discussion sample?

The entire MKT 400 Module 4 post is published here, weighing a hockey team's rename against a brand refresh.

How do loyal customers react to a logo redesign?

A field experiment found strongly committed customers evaluated redesigned logos more negatively, while weakly committed customers reacted positively.

What is emotional brand attachment?

A strong emotional bond between a consumer and a brand, reflected in feelings of affection, passion and connection, which a validated scale can measure.

Why does brand attachment matter more than liking?

Research found attachment predicts difficult behaviors, such as defending the brand or paying more, better than the strength of brand attitudes.

When should a brand be renamed?

Usually when the name itself blocks the brand's future, for example through legal problems or harmful associations, not simply because it feels dated.