MKT 400 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 400 Module 1 Discussion sample asks what brand equity is and where it actually lives, using a sports team whose new owner wants to change its name. SNHU MKT 400 (MKT-400) opens its BS Marketing course on strategic brand management with brand equity. The post introduces the Fort Smith Ironjacks, a composite minor-league hockey team in Arkansas founded in 1998, whose owner thinks a fresh name would sell more tickets. It examines what fans know and feel about the current brand, using research on customer-based brand equity, team brand associations and brand personality, and asks classmates whether the value can survive a new name.

CourseMKT 400 Strategic Brand Management
ModuleModule 1
Paper typeundergraduate discussion post on brand equity and what it consists of
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 400 Module 1

1

Module One Discussion

The Owner Wants a New Name. The Fans Own the Old One.

I grew up going to minor-league hockey games with my grandfather, so for MKT 400 I am using a composite team: the Fort Smith Ironjacks, founded in 1998 and playing in a 5,200-seat arena in Arkansas. The team averages about 3,900 fans a night. Its new owner believes the name sounds dated and wants to rebrand as something younger and louder. He has already asked a design firm for name ideas, and longtime season ticket holders have heard the rumor.

What this page is doingThe brand I am following.
2

Talk to fans and the brand is far richer than its name. Nearly everyone in the region recognizes "Ironjacks," and many can explain it: the town's history of steelworkers and the jack used to lift a beam. Fans remember the 2004 and 2011 playoff runs, love Rivet, a mascot in a hard hat, and describe the team as tough and honest, the kind of hockey their parents watched. Several families sit in the same seats their grandparents bought in the first season, and the team's most popular giveaway is still a small replica hard hat.

What this page is doingWhat fans actually know.
3

In Keller's model, the equity a brand holds with customers shows up as the extra response a brand's marketing earns because of what people already know, and that knowledge has two parts: awareness and an image made of strong, favorable and unique associations (Keller, 1993). The Ironjacks score high on both. Gladden and Funk (2002), building a model of team brand associations, identified dimensions such as success, star players, logo, tradition, nostalgia, pride in place and peer group acceptance; tradition, nostalgia and pride in place stand out for this team. Of the five personality dimensions in Aaker (1997), two fit this team best; fans describe the Ironjacks as rugged and sincere, while the owner wants excitement.

What this page is doingOrganizing it with research.
4

Much of this equity is attached to the name, the mascot and the history. If you were the owner, could you add excitement without throwing away the ruggedness and sincerity fans already value, or does that require a new name?

What this page is doingQuestion.
5

References

Aaker, J. L. (1997). Dimensions of brand personality. Journal of Marketing Research, 34(3), 347-356. https://doi.org/10.1177/002224379703400304

Gladden, J. M., & Funk, D. C. (2002). Developing an understanding of brand associations in team sport: Empirical evidence from consumers of professional sport. Journal of Sport Management, 16(1), 54-81. https://doi.org/10.1123/jsm.16.1.54

Keller, K. L. (1993). Conceptualizing, measuring, and managing customer-based brand equity. Journal of Marketing, 57(1), 1-22. https://doi.org/10.1177/002224299305700101

What the MKT 400 Module 1 instructions ask for

The opening MKT 400 discussion typically asks what a brand is, what brand equity means and why it matters, usually through a brand you know well. Certain versions also want a short personal introduction and the name of a brand you stay loyal to. A strong post goes beyond logos and slogans to describe what customers know and feel about a brand, organizes that knowledge with a recognized model of brand equity and connects it to a real decision the brand faces. It treats brand equity as something that lives in customers' minds rather than in the company's files, and every later module in the course starts from that idea. Describing the brand as customers would, in their words, is more convincing than the company's description.

How this MKT 400 Module 1 discussion example is built

The sample introduces the Fort Smith Ironjacks, a composite minor-league hockey team in Arkansas founded in 1998, with an average crowd of about 3,900 in a 5,200-seat arena. A new owner wants to rename the team to attract younger fans. The post describes what fans know: nearly everyone in the region recognizes the name; the team stands for a tough, working-class style, playoff runs in 2004 and 2011 and a mascot named Rivet; and its personality reads as rugged and sincere. Using Keller's customer-based brand equity, Gladden and Funk's team association dimensions and Aaker's brand personality dimensions, the post asks whether that value would survive a new name.

Where the MKT 400 Module 1 rubric puts the points

In this first discussion, marks generally reflect a clear understanding of brands and brand equity, how well the ideas are applied to one brand, the use of a model or study and engagement with classmates. Posts do well when they describe actual associations and feelings customers hold, organize them with a framework and connect them to a decision. They lose ground for treating a brand as only a name and logo, for describing a brand in the company's terms rather than customers', for frameworks named without application and for replies that simply agree. A sentence about why the example brand matters to you is welcome as long as the analysis stays central. Separating what is unique to the brand from what any competitor could claim strengthens the analysis.

MKT 400 Module 1 help: the mistakes that cost points

Pick a brand you know well, ideally one facing a choice. Write down, as a customer would, what comes to mind when you hear its name: images, feelings, memories, people. Then sort those thoughts using a brand equity model, separating awareness from the associations and their strength and favorability. Ask which associations are unique to this brand. Connect them to the decision the brand faces. Keep your introduction short. Finish by inviting classmates to make the call themselves, since that turns a description into a debate. Ask two or three people outside the course what comes to mind about the brand, and use their answers. Note where their words differ from the company's slogan.

Get MKT 400 Module 1 written to your instructions

Bring the MKT 400 Module 1 prompt and a brand you know well. We show where its equity lives, in awareness, associations and personality, apply research on brand equity and close with a question that makes classmates weigh a real branding decision. The opening post is free; expect it in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 400 papers and related BS Marketing samples

MKT 400 Module 1 questions, answered

Where can I find a free MKT 400 Module 1 Discussion sample?

This page has the full MKT 400 Module 1 post on brand equity, seen through a hockey team whose owner wants to rename it.

What is customer-based brand equity?

The different response customers have to a brand's marketing because of what they know about the brand, built from brand awareness and brand image.

Where does brand equity come from?

From customers' knowledge of the brand: how well they recognize and recall it and how strong, favorable and unique its associations are.

What are brand associations in team sport?

Research identified dimensions such as success, star players, logo, tradition, nostalgia, pride in place and peer group acceptance as associations fans hold with teams.

What is brand personality?

The human traits people attribute to a brand; one widely used framework names sincerity, excitement, competence, sophistication and ruggedness.