MKT 400 Module 8 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 400 Module 8 Discussion sample reflects on what a brand strategy achieved and what still takes time, using a team's first season after its refresh. SNHU MKT 400 (MKT-400) closes its BS Marketing course by asking students what they learned about managing brands. The post imagines the Fort Smith Ironjacks, a composite minor-league hockey team, one season after keeping their name and refreshing everything else. It reviews early results, explains them with research on how fans move from awareness to allegiance and on the role of logo and tradition and asks classmates which course lesson they would take into a brand job.

CourseMKT 400 Strategic Brand Management
ModuleModule 8
Paper typeundergraduate closing discussion reflecting on brand results and long-term fan connection
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 400 Module 8

1

Module Eight Discussion

One Season In: Attracted, Not Yet Attached

For my final post I imagined the Fort Smith Ironjacks one season into the plan from my Final Project. In my version, the share of attendance under 35 rose from 22 to 27 percent, excitement among non-attenders rose from 2.9 to 3.6 out of 7, season ticket renewals came in at 85 percent and the Foundry sold out 14 of 36 home nights. Revenue per attendee dipped slightly, from $16.40 to $16.10, because of the group tickets.

What this page is doingImagining one season in.
2

Funk and James (2001) described a psychological continuum in which people move from awareness of a team to attraction, attachment and finally allegiance. The younger residents in my plan were aware all along. The louder game nights and the Foundry moved some of them to attraction: they came, they had fun, they posted videos. Attachment, where the team becomes part of who they are, takes longer, and the Foundry's empty nights suggest many are still trying it out. A second season of consistent support matters more than any new idea. Keller (1999) argued that brands are managed for the long run through consistent marketing support, in both its amount and its nature, and that cutting back after a launch is a common way brands lose ground. If the owner trims the Foundry budget because season one looked good, the newly attracted fans may drift away before they ever become attached.

What this page is doingAttracted, not yet attached.
3

Bauer et al. (2008) studied fans of German soccer clubs and reported that attributes unrelated to play on the field, notably the logo and the club's tradition, had an unusually strong effect on attitudes and loyalty. That is the main reason I kept the crest as an evolution of the 1998 version. In my imagined season, longtime fans' tradition rating held at 6.2, and the angry comments faded once people saw the old jack and stick in the new mark.

What this page is doingWhy the crest worked.
4

The biggest lesson for me is to find out where a brand's equity actually lives before changing anything. When this course began, I would have sided with the owner that a new name was the obvious fix. Which lesson from this course would you use first in a real brand job?

What this page is doingWhat I would take into a job, and a question.
5

References

Bauer, H. H., Stokburger-Sauer, N. E., & Exler, S. (2008). Brand image and fan loyalty in professional team sport: A refined model and empirical assessment. Journal of Sport Management, 22(2), 205-226. https://doi.org/10.1123/jsm.22.2.205

Funk, D. C., & James, J. (2001). The psychological continuum model: A conceptual framework for understanding an individual's psychological connection to sport. Sport Management Review, 4(2), 119-150. https://doi.org/10.1016/S1441-3523(01)70072-1

Keller, K. L. (1999). Managing brands for the long run: Brand reinforcement and revitalization strategies. California Management Review, 41(3), 102-124. https://doi.org/10.2307/41165999

What the MKT 400 Module 8 instructions ask for

The final discussion in MKT 400 often invites you to look back on the course, on the brand you studied or on what you would do differently, and to connect your reflection to brand management concepts. A strong post goes beyond saying the course was useful. It names specific results or lessons, explains them with a concept or a piece of research, admits what did not work or would take longer and closes by inviting peers to compare lessons from their own projects. Replies should build on classmates' brands rather than repeat praise, and should add an idea, a source or a question the writer had not considered.

How this MKT 400 Module 8 discussion example is built

The sample imagines the Fort Smith Ironjacks one season into their refresh. Attendance under 35 rose from 22 to 27 percent, excitement among non-attenders rose from 2.9 to 3.6, renewals reached 85 percent and the Foundry sold out 14 of 36 nights. The post uses Funk and James's psychological continuum model of awareness, attraction, attachment and allegiance to argue that younger fans are attracted but not yet attached, and Bauer, Stokburger-Sauer and Exler's finding that logo and tradition drive loyalty to explain why longtime fans accepted the redrawn crest. It closes by asking which course lesson classmates would put to work first. It also cites Keller's warning that brands lose ground when support is cut after a launch.

Where the MKT 400 Module 8 rubric puts the points

Closing reflection posts are typically graded on depth of reflection, connection to course concepts, evidence and how well the writer engages peers. Strong posts are specific about results and lessons, use a concept or study to explain them, are honest about limits and ask a question that invites thoughtful answers. Posts lose points for general praise of the course, for listing topics without reflection, for claiming success without evidence and for replies that only say "great post." Showing how your thinking changed during the term is often the strongest sign of learning, and it hands classmates a concrete point to answer. Posts that describe how the writer's view changed over the term stand out.

MKT 400 Module 8 help: the mistakes that cost points

Choose two or three specific results or lessons, not a summary of every module. Explain each with a concept or a source from the course, such as brand equity, positioning or fan and customer connection. Be honest about what your plan could not do quickly. Keep the post focused and short. Finish with a prompt your peers can take up using the brands they studied, such as which lesson they would use first in a job. In replies, compare their brand's situation with yours and add something new, such as a measure they might track. Say honestly what you believed at the start of the term and what changed your mind.

Get MKT 400 Module 8 written to your instructions

Paste the MKT 400 Module 8 prompt and the brand you worked on this term. We reflect on what your plan would achieve and what would take longer, apply research on fan or customer connection and end with a question about lessons for future work. The opening post is free and ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 400 papers and related BS Marketing samples

MKT 400 Module 8 questions, answered

Where can I find a free MKT 400 Module 8 Discussion sample?

The full MKT 400 Module 8 post appears on this page, reflecting on a hockey team's first season after a brand refresh.

What is the psychological continuum model?

A sport marketing model in which people move from awareness of a team through attraction and attachment to allegiance as their connection deepens.

Why do logos and tradition matter for team loyalty?

Research on professional team sport found that a club's logo and tradition shape how fans feel about it and how loyal they stay.

How long does a brand refresh take to work?

Early results may show within a season, but deeper loyalty usually takes several years of consistent support.

What should a final reflection post include?

Specific lessons or results, a course concept that explains them, an honest note about limits and a question for classmates.