MKT 400 Strategic Brand Management sample papers, module by module

Reviewed by Portia Lambrick, MBA

MKT 400 asks what a brand is worth and how to manage it without throwing that worth away. The samples below follow one hockey team as an owner's urge to rename meets the evidence of what fans and non-fans actually think.

MKT 400 is SNHU’s Strategic Brand Management course. It centers on strategic brand management: customer-based brand equity, brand audits, brand personality, positioning with points of parity and difference, brand mantras, brand elements and logo design, brand architecture, brand extensions, measuring brand equity and managing brands over time. Every module below opens a full sample paper or takes a free request for one; searches like "mkt 400 module 3", "MKT400 sample paper" and "MKT 400 milestone example" land on this page.

What MKT 400 is really about

MKT 400 is SNHU's strategic brand management course in the BS Marketing. It rewards papers that study a brand before changing it: auditing awareness and associations, positioning against the real alternatives, keeping elements that carry equity, testing extensions for fit and measuring whether a strategy moves both minds and sales.

The samples follow one composite brand: the Fort Smith Ironjacks, a minor-league hockey team founded in 1998 with a hard-hat mascot named Rivet, three logos in use, a loyal and aging crowd and younger residents who know the name but never come. The team and every figure are illustrative.

What MKT 400’s modules ask for

Across eight modules, MKT 400 commonly asks for discussions on brand equity, brand change and course reflection, a brand audit, a positioning and identity milestone, a brand elements and architecture milestone, a brand equity measurement assignment and a final strategic brand management plan.

Where students lose points in MKT 400

MKT 400 work loses the most credit when brands are changed before they are understood, when points of difference could belong to any competitor, when extensions are chosen for revenue without testing fit and when equity is measured by sales alone.

The MKT 400 drawers

Module 1

MKT 400 Module 1 Discussion example

The first MKT 400 post introduces the Fort Smith Ironjacks, a composite minor-league hockey team in Arkansas whose new owner wants to rename it, and asks what the brand is actually worth and where that worth lives: in fans' awareness of the name, in the associations it carries, from a 1998 founding and a hard-nosed style to a beloved mascot, and in the personality fans give it; the post draws on Keller's model of customer-based brand equity, Gladden and Funk's sixteen dimensions of team brand associations and Aaker's five dimensions of brand personality, and asks classmates whether a name can be changed without losing what fans value. Full sample paper, read it free.

Read the sample →
Module 2

MKT 400 Module 2 Brand Audit Assignment example

The brand audit takes stock of the Fort Smith Ironjacks: a brand inventory of every element and touchpoint, from the 1998 wordmark and the hard-hat mascot to arena signage, uniforms and three versions of the logo in use; and a brand exploratory built on a survey of 780 fans and 300 non-attending residents and eight short interviews, measuring awareness, the team associations Gladden and Funk identified and Aaker's personality dimensions; it finds near-universal awareness, strong tradition, nostalgia and pride-in-place associations among fans, weak associations with excitement and a younger image among non-attenders and consistency problems in how the brand is shown, and it locates the brand's sources of equity using Keller's customer-based brand equity model. Full sample paper, read it free.

Read the sample →
Module 3

MKT 400 Module 3 Milestone One example

Milestone One sets the brand positioning for the Fort Smith Ironjacks after the audit: the frame of reference is a night out in Fort Smith, not hockey alone; points of parity are a comfortable, affordable evening with good food; points of difference are a 25-year local story, a tough and honest style and a night that is louder than anything else in town; a three-word brand mantra, "loud, local, tough"; a target personality that keeps ruggedness and sincerity and adds excitement; and a relationship goal of being the town's shared ritual rather than its old habit, drawing on Fournier's account of consumer-brand relationships, Escalas and Bettman's findings on brands, reference groups and self-concept and Aaker's brand personality dimensions. Full sample paper, read it free.

Read the sample →
Module 4

MKT 400 Module 4 Discussion example

The fourth MKT 400 discussion weighs the Fort Smith Ironjacks owner's preferred option, a new name and logo, against a refresh that keeps the name and mascot, cleans up three competing logos and changes the game experience; it uses Walsh, Winterich and Mittal's field experiment showing that strongly committed customers reacted negatively to logo redesigns that weakly committed ones liked, Thomson, MacInnis and Park's scale of emotional brand attachment and Park and colleagues' finding that attachment predicts difficult behaviors such as defending a brand better than attitude strength does, and recommends the refresh while asking classmates when a full rename is worth the risk. Full sample paper, read it free.

Read the sample →
Module 5

MKT 400 Module 5 Milestone Two example

Milestone Two turns the Fort Smith Ironjacks' positioning into choices: the elements to keep, change or retire, judged against criteria such as memorability, meaning and protectability, with the name, Rivet and "Built Tough" kept and three logos replaced by one redrawn crest following Henderson and Cote's guidelines for natural, harmonious and moderately elaborate logos; a simple brand architecture with the team as the master brand over a student section, a kids' club and a youth hockey program; and two extensions, a summer street festival and a workwear line with a local manufacturer, tested for fit using Aaker and Keller's research on how consumers evaluate extensions, while Bauer, Stokburger-Sauer and Exler's finding that logo and tradition drive fan attitudes argues for caution with the crest. Full sample paper, read it free.

Read the sample →
Module 6

MKT 400 Module 6 Brand Equity Measurement Assignment example

The sixth MKT 400 assignment designs a way to track the Fort Smith Ironjacks' brand equity through the refresh: Keller's view that equity lives in what customers know, measured indirectly through awareness and associations and directly through their response to marketing; Yoo and Donthu's multidimensional consumer-based scale of loyalty, perceived quality and awareness with associations; Ross's spectator-based brand equity framework for sport, which adds the service experience at the arena; a dashboard of survey and market measures with baselines from the audit, such as 22 percent of attendance under 35 and an 84 percent season ticket renewal rate, and targets for two seasons; and a schedule and owner for each measure. Full sample paper, read it free.

Read the sample →
Module 7

MKT 400 Module 7 Final Project example

The MKT 400 Final Project pulls the whole course into one brand management plan for the Fort Smith Ironjacks: the audit's findings, a positioning as the loudest, most local night out in town, the decision to refresh rather than rename, backed by Walsh, Winterich and Mittal's evidence on committed customers and logo redesign, one redrawn crest and a simple brand architecture, an integrated program across the game night, the Foundry student section, Rivet, social media and a summer festival, a two-season budget of $393,000 and timeline, Keller's guidance on reinforcing and revitalizing brands for the long run, a dashboard grounded in Keller's and Ross's work on brand equity and a set of risks with responses. Full sample paper, read it free.

Read the sample →
Module 8

MKT 400 Module 8 Discussion example

The final MKT 400 post imagines the Fort Smith Ironjacks one season into the refresh: the share of attendance under 35 up from 22 to 27 percent, the excitement rating among non-attenders up from 2.9 to 3.6, renewals at 85 percent and the Foundry sold out on 14 of 36 nights; it uses Funk and James's psychological continuum model, which moves people from awareness through attraction and attachment to allegiance, to explain why younger fans are attracted but not yet attached, and Bauer, Stokburger-Sauer and Exler's finding that logo and tradition shape fan loyalty to explain why fans accepted the redrawn crest, then invites classmates to name the course lesson they would use first at work. Full sample paper, read it free.

Read the sample →
Different?

Your classroom shows something else?

Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a MKT 400 sample the right way

Read in order, the MKT 400 samples trace a single branding decision, whether to rename a team, from the first question about equity through audit, positioning, design, measurement and a full plan to an honest look at early results. For MKT 400 help with your own brand, send the brief and rubric; a first custom sample is free and usually ready in two days.

MKT 400 questions, answered

What does MKT 400 cover?

Strategic brand management: brand equity, audits, positioning, brand personality, brand elements, architecture, extensions, measurement and long-term brand management.

What is the MKT 400 final project?

A strategic brand management plan for one brand, covering the audit, positioning, elements and architecture, marketing programs, budget, timeline, equity measures and risks.

Is the hockey team in the MKT 400 samples real?

No. The Fort Smith Ironjacks are fictional, created so that all eight samples follow one brand through a full branding decision.