MKT 400 Module 5 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This MKT 400 Module 5 Milestone Two sample turns a positioning into concrete choices about brand elements, the structure of related brands and possible extensions. SNHU MKT 400 (MKT-400) has BS Marketing students in Milestone Two decide which names, logos, symbols and slogans to keep or change, how sub-brands relate to the master brand and where the brand can stretch. The Fort Smith Ironjacks, a composite minor-league hockey team, keep their name and mascot, replace three logos with one, organize three sub-brands under the team and test two extensions for fit, drawing on research on logo design, team brand image and extension evaluation.

CourseMKT 400 Strategic Brand Management
ModuleModule 5
Paper typeundergraduate milestone choosing brand elements, a brand architecture and brand extensions
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 400 Module 5

1

One Crest, Three Programs and a Summer Festival: Brand Elements and Architecture for the Fort Smith Ironjacks

[Student Name]

Southern New Hampshire University

MKT 400: Strategic Brand Management

Milestone Two: Brand Elements, Architecture and Extensions

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe Ironjacks, their sub-brands and their extension ideas are invented for the course.
2

One Crest, Three Programs and a Summer Festival: Brand Elements and Architecture for the Fort Smith Ironjacks

Introduction

Milestone One placed the Fort Smith Ironjacks as Fort Smith's loudest and most hometown evening out, with the mantra "loud, local, tough" and a personality that keeps ruggedness and sincerity while adding excitement. This milestone turns that position into decisions about the brand's elements, the structure of related brands and the places the brand can stretch. Every choice is tested against the positioning and the audit.

What this page is doingLinks to Milestone One.
3

Evaluating the Brand Elements

Brand element decisions

ElementCurrent stateDecisionReason
Name"Ironjacks," since 1998KeepMemorable, meaningful and tied to the town's steel history
LogoThree versions in useRevise into one crestInconsistent and scored poorly with both groups
ColorsSteel gray and orangeKeep, brighten the orangeDistinctive locally; orange adds energy
MascotRivet, in a hard hatKeep, expand his roleLiked, adaptable and already part of the family ritual
Slogan"Built Tough"KeepFits ruggedness; supports the mantra
Arena sound and lightBasicDevelop as a brand elementNeeded to deliver "loud"

The name passes every test that matters. It is easy to remember, it carries the local story that the positioning depends on and the team already owns it. Changing it would throw away the brand's strongest asset in order to solve a problem the audit locates elsewhere.

The logo is the element most in need of work. Three versions now appear on signs, jerseys and warm-up gear, so no single image is building recognition. Henderson and Cote (1998) analyzed 195 logos on 13 design characteristics and found that logos that achieve high recognition tend to be very natural, very harmonious and moderately elaborate, while logos meant to project a strong, professional image should be moderately elaborate and natural. The 1998 crest, which fans connect with tradition, has a natural form, a steel jack crossed with a hockey stick, but it is cluttered with fine lines and small text that disappear on a phone screen. The recommendation is to redraw that crest with cleaner lines, a single weight and a bolder orange, and retire the 2008 and 2016 marks.

Bauer et al. (2008) studied fans of German professional soccer and found that non-product attributes such as the logo and the club's tradition had a particularly large influence on fan attitudes and loyalty. That finding argues for evolution rather than replacement. Fans should look at the new crest and recognize the old one.

The arena's sound and lighting are listed as a brand element because the positioning promises the loudest night in town. Without a consistent goal song, a lighting sequence and crowd chants that are the same every night, "loud" stays a hope rather than something the brand delivers.

What this page is doingKeeps, revises or drops each element.
4

Brand Architecture

The Ironjacks will use a simple branded house: one master brand, with every sub-brand clearly labeled as part of the team.

Brand hierarchy

LevelBrandAudiencePurpose
Master brandFort Smith IronjacksEveryoneThe team and the game night
Sub-brandThe Foundry (student section)Ages 18 to 34A loud, low-priced section for groups of friends
Sub-brandRivet's Crew (kids' club)Children under 12Family loyalty and the next generation of fans
Sub-brandIronjacks Youth HockeyLocal players and parentsCommunity ties and pride in place

The Foundry is the most important addition. It answers the audit's finding that younger residents do not see a game as something their friends do. A section with its own entrance, standing room, cheaper tickets sold in groups of four and its own chants would give them a place that is clearly theirs while remaining part of the team. The name links to the steel heritage, so older fans can read it as a continuation rather than a break.

Rivet's Crew and Ironjacks Youth Hockey already exist informally. Naming them and giving them the same crest and colors would let the family ritual that longtime fans describe continue into a new generation. None of the sub-brands should have its own logo; each uses the master crest with a word line, which keeps the system simple and avoids spreading recognition across more marks.

What this page is doingOrganizes the master brand and sub-brands.
5

Brand Extensions

Aaker and Keller (1990) found that consumers evaluate a brand extension more favorably when shoppers judge that the extension and the original go together, through shared use, substitutability or transferable skills, and when the extension is not trivially easy to make. Perceived quality of the parent brand helped mainly when fit was present. Two extensions were considered.

The first is the Ironjacks Summer Street Fest, a one-day festival on Garrison Avenue each July with local food, music, a ball hockey tournament and Rivet. Its fit is strong: it carries the "local" and "loud" parts of the mantra into the off-season, keeps the brand visible and reaches younger residents in a setting where they already gather. The risk is modest. A poorly run festival would hurt the brand's image as the town's shared ritual, so the team should start small, partner with the downtown association and measure attendance and satisfaction before expanding.

The second is a line of Built Tough workwear made with a local manufacturer: jackets, gloves and hats in steel gray and orange. Fit is reasonable because the name and slogan come from the town's working history, and a local partner adds believability. The risk is higher. If the products are of poor quality, the very word "tough" becomes a joke, and the team has no experience making clothing. The recommendation is a small test run sold at games and online, with the partner responsible for quality, before any wider launch.

An extension rejected outright was a team-branded energy drink proposed by a distributor. It fits neither the local story nor the honest personality and would be easy for any brand to produce, which Aaker and Keller's findings suggest would earn little credit from consumers.

What this page is doingTests two ideas for fit and risk.
6

Alignment with the Positioning

Each decision traces back to "loud, local, tough." The name, colors, slogan and Youth Hockey carry the local story. The sound and light package, the Foundry and a more mischievous Rivet deliver loud. The crest, the slogan and the workwear express tough. The architecture is deliberately simple so that every program builds the same master brand.

What this page is doingChecks every decision against the mantra.
7

Conclusion

The Ironjacks should keep the elements that carry their equity, replace a confusing set of logos with one redrawn crest, organize their programs as clear sub-brands of the team and extend carefully into a summer festival before testing workwear. These choices give younger residents new reasons to come while giving longtime fans nothing to mourn.

What this page is doingSums up.
8

References

Aaker, D. A., & Keller, K. L. (1990). Consumer evaluations of brand extensions. Journal of Marketing, 54(1), 27-41. https://doi.org/10.1177/002224299005400102

Bauer, H. H., Stokburger-Sauer, N. E., & Exler, S. (2008). Brand image and fan loyalty in professional team sport: A refined model and empirical assessment. Journal of Sport Management, 22(2), 205-226. https://doi.org/10.1123/jsm.22.2.205

Henderson, P. W., & Cote, J. A. (1998). Guidelines for selecting or modifying logos. Journal of Marketing, 62(2), 14-30. https://doi.org/10.1177/002224299806200202

What the MKT 400 Module 5 instructions ask for

Milestone Two in MKT 400 typically asks you to build on your positioning by choosing brand elements, such as name, logo, symbols, slogan and colors, explaining the brand architecture or brand hierarchy and recommending how the brand might extend into new products, services or markets. A strong milestone evaluates each element against clear criteria, explains why each is kept, revised or dropped, presents the architecture in a simple diagram or table, tests proposed extensions for fit and risk and ties every choice back to the positioning. It should also consider how the parent brand could be hurt if an extension fails. Brief reasons for rejecting an idea can be as useful as the case for the ideas you keep.

How this MKT 400 Module 5 milestone two example is built

The sample applies this to the Fort Smith Ironjacks. It keeps the name, Rivet the mascot and the "Built Tough" slogan, and replaces three logos in use with one redrawn crest, following Henderson and Cote's guidelines that recognizable logos be natural, harmonious and moderately elaborate. It sets the team as the master brand over a student section, a kids' club and a youth hockey program. It tests two extensions, a summer street festival and a workwear line made with a local manufacturer, using Aaker and Keller's findings on fit, and notes Bauer and colleagues' evidence that logo and tradition strongly shape fan attitudes. It also rejects a proposed energy drink as a poor fit with the local story.

Where the MKT 400 Module 5 rubric puts the points

Milestones on brand elements and architecture are usually assessed on the evaluation of elements against criteria, the clarity and logic of the architecture, the fit and risk analysis of extensions, alignment with the positioning, the research behind each choice and clear writing. The best milestones make each element decision explicit and justified, show the hierarchy simply, test extensions against fit and the parent brand's strength and name risks to the core brand. Weak milestones list elements without judging them, propose extensions because they would earn money without testing fit, invent complex sub-brand structures with no purpose or forget the positioning they set earlier. Work that names a rejected option and explains why shows sharper judgment.

MKT 400 Module 5 help: the mistakes that cost points

Take each brand element in turn and ask whether it is memorable, meaningful, likable, adaptable and protectable, then decide whether to keep, revise or drop it. Draw the brand hierarchy as a simple table: the master brand and anything beneath it. For each extension idea, ask how well it fits the parent brand in the customer's eyes and what happens to the parent brand if the extension disappoints. Use research on logo design and extension evaluation to support your choices. End by showing how each decision supports the positioning statement from Milestone One. Include one idea you turned down, with the reason, so your reader sees the test at work.

Get MKT 400 Module 5 written to your instructions

Send the MKT 400 Milestone Two guidelines and your positioning from Milestone One. We evaluate each brand element, recommend what to keep or change, set out a brand architecture and test possible extensions for fit, citing research on logos and extensions. Your first milestone costs nothing and normally comes back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 400 papers and related BS Marketing samples

MKT 400 Module 5 questions, answered

Where can I find a free MKT 400 Module 5 Milestone Two sample?

The complete MKT 400 Module 5 Milestone Two is on this page: brand elements, architecture and extensions for a minor-league hockey team.

What criteria are used to choose brand elements?

Common criteria are memorability, meaningfulness, likability, transferability, adaptability and protectability.

What is brand architecture?

The way an organization structures its brands, showing which brand is the master and how sub-brands and products relate to it.

How do consumers judge a brand extension?

Research found that extensions are judged more favorably when consumers see a good fit with the parent brand and when the extension is not too easy to make.

What makes a logo recognizable?

A study of 195 logos found highly recognizable logos tend to be natural, harmonious and moderately elaborate.