| Course | MKT 337 Marketing Research |
|---|---|
| Module | Module 6 |
| Paper type | undergraduate assignment analyzing survey data and testing hypotheses |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 337 Module 6
Renewal Forms, Unfamiliar Plays and a Three-Show Pack: Analyzing What 648 Patrons Told Chippewa Valley Playhouse
[Student Name]
Southern New Hampshire University
MKT 337: Marketing Research
Data Analysis Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Renewal Forms, Unfamiliar Plays and a Three-Show Pack: Analyzing What 648 Patrons Told Chippewa Valley Playhouse
Introduction
Chippewa Valley Playhouse's survey ran from early December to mid-January. It received 214 responses from 570 invited current subscribers, 238 from 1,480 lapsed subscribers and 196 from 2,000 single-ticket buyers, 648 in all, with response rates of 38, 16 and 10 percent. This paper checks the data, tests the four hypotheses with the methods planned in Milestone Two, reports the attachment scale and interprets each result for the board's March decision, in language a board member without statistics training can follow.
Data Quality and Nonresponse
Because the ticketing system records age, distance, tenure and shows attended for everyone invited, respondents could be compared with the full populations. Current subscriber and single-ticket respondents matched their populations closely. Lapsed respondents were somewhat older, a median of 67 against 65, and more likely to have subscribed three or more seasons. Groves (2006) showed that nonresponse produces bias only when nonrespondents differ on the measured variables, and that such bias is often present; here the difference is known and measurable, so lapsed results were weighted by age and tenure to match the lapsed population. Forty-one percent of lapsed responses came on paper, which suggests the paper option reached people the online survey would have missed.
Attachment Scale
The five attachment items showed good internal consistency, with a reliability coefficient of 0.86, and no item lowered it, so all five were averaged into one score from 1 to 5. Current subscribers averaged 4.2, single-ticket buyers 3.1 and lapsed subscribers 2.9.
Hypothesis 1: Renewal Process
Lapsed subscribers citing the renewal process
| Age | Respondents | Cited renewal process | Share |
|---|---|---|---|
| 70 and over | 96 | 50 | 52 percent |
| Under 70 | 142 | 20 | 14 percent |
The difference is large and statistically significant (chi-square of about 40, far beyond chance). Among older lapsers, the renewal process was the most common reason given. Several wrote that they "meant to renew and never managed it." Two described calling the box office and being told to use the website. These comments suggest that many older lapsers did not decide to leave at all; they were lost in a process, which means they may be the easiest group to win back. The hypothesis is supported.
Hypothesis 2: Experimental Plays
Subscribers who lapsed after their first or second season rated the experimental productions they saw at an average of 2.6 out of 5, against 3.4 for subscribers of similar tenure who renewed, a difference of 0.8 points that is statistically significant. Their ratings of musicals and classic plays did not differ. Bolton (1998) found that customers early in a relationship rely more on recent experiences than on accumulated satisfaction; the pattern fits newer subscribers judging the season by one or two disappointing evenings. The hypothesis is supported, though the survey cannot show that the plays caused the lapses.
Hypothesis 3: Flexible Pack
Package choices by single-ticket buyers
| Choice | Share |
|---|---|
| Flexible three-show pack | 58 percent |
| Musicals-only pass | 27 percent |
| Five-show subscription | 6 percent |
| None | 9 percent |
Fifty-eight percent chose the flexible pack, significantly more than half. The hypothesis is supported. Morwitz et al. (2007) found that stated intentions predict purchases poorly for new products, which is why the survey asked respondents to choose among priced options rather than state an intention; even so, a choice on a survey is not a purchase, and actual uptake will likely be lower.
Hypothesis 4: Price Sensitivity
Among newer and lapsed patrons, the share choosing the flexible pack fell from 64 percent at $96 to 49 percent at $116, a significant drop. Among subscribers of three seasons or more, the share choosing the five-show subscription fell only from 81 to 76 percent when its price rose from $150 to $170, a difference too small to be significant. The hypothesis is supported: price matters to newcomers and hardly at all to the core.
Additional Finding From the Interviews
Forty-four percent of single-ticket buyers and 38 percent of lapsed subscribers said they would attend more often if some performances started at 7 p.m. instead of 7:30 or offered a Sunday matinee. Among current subscribers, only 12 percent wanted a change, so earlier times could be offered on some nights without disturbing the core audience.
What the Groups Have in Common
Across all three groups, the attachment score was the strongest single correlate of choosing any package at all: respondents in the top third of attachment chose a package 85 percent of the time, those in the bottom third 41 percent. That pattern is consistent with the museum research cited earlier in this project and suggests that what the theater does to make newcomers feel the playhouse is "theirs," a welcome night, a backstage tour, a volunteer contact, may matter as much as price or programming. Because attachment and choice were measured in the same survey, the link may be partly inflated, which is why the questionnaire separated the two and why the finding should be treated as a promising lead rather than a proven effect.
Summary of Hypothesis Tests
All four hypotheses were supported, but they differ in strength. The renewal finding is the strongest: a large gap, a clear mechanism and respondents' own words. The flexible-pack preference is solid but measured as a survey choice. The price finding is clear for newcomers and clearly absent for long-term subscribers. The programming finding is real but the most open to other explanations, since newer subscribers who disliked experimental plays may differ in other ways from those who renewed.
Limitations
The survey shows reasons people report and patterns that go together, not proof of cause. Few lapsed or occasional patrons replied, and weighting can only fix the traits the box office happens to track. Package choices on a survey overstate real purchases.
Conclusion
The evidence points to four actions: restore a simple paper or phone renewal for older subscribers, introduce a flexible three-show pack priced near $96, think carefully about how many experimental plays a newcomer meets in the first season and test earlier start times. The final report will turn these into recommendations, each with its cost, its expected effect and a way to check, after next season, whether it worked.
References
Bolton, R. N. (1998). A dynamic model of the duration of the customer's relationship with a continuous service provider: The role of satisfaction. Marketing Science, 17(1), 45-65. https://doi.org/10.1287/mksc.17.1.45
Groves, R. M. (2006). Nonresponse rates and nonresponse bias in household surveys. Public Opinion Quarterly, 70(5), 646-675. https://doi.org/10.1093/poq/nfl033
Morwitz, V. G., Steckel, J. H., & Gupta, A. (2007). When do purchase intentions predict sales? International Journal of Forecasting, 23(3), 347-364. https://doi.org/10.1016/j.ijforecast.2007.05.015
What the MKT 337 Module 6 instructions ask for
The data analysis assignment in MKT 337 typically asks you to analyze collected data, test hypotheses or answer research questions using appropriate statistics, present results in tables or charts and interpret what they mean for the marketing problem. A strong paper first checks data quality and representativeness, then runs the tests planned in advance, reports results with both statistics and plain-language meaning, distinguishes statistical significance from practical importance and connects each finding to the decision. It is honest about limits, such as associations that cannot prove cause, and it does not hunt through the data for surprising results after the fact. Clear tables help readers follow every number. Each finding should end with what it means for the decision.
How this MKT 337 Module 6 data analysis assignment example is built
The sample analyzes Chippewa Valley Playhouse's survey of 648 patrons. Lapsed respondents were slightly older than lapsed subscribers overall, so their results were weighted by age. Among lapsers 70 and over, 52 percent cited the renewal process, against 14 percent of younger lapsers, a large and significant difference. Early lapsers rated experimental productions 2.6 out of 5 against 3.4 for renewers. Fifty-eight percent of single-ticket buyers chose the flexible three-show pack. A $20 higher price cut choice of the flexible pack among newer patrons from 64 to 49 percent but barely moved long-term subscribers. Groves, Morwitz and colleagues and Bolton help interpret the results. A limitations section explains why survey choices overstate real purchases.
Where the MKT 337 Module 6 rubric puts the points
Data analysis papers are commonly assessed on data screening, the appropriateness and accuracy of statistical tests, the clarity of presentation, the quality of interpretation and the link to the decision, plus writing. Strong papers check representativeness, report tests with their statistics and plain meaning, separate significance from size and avoid causal claims the design cannot support. Marks drop for unexplained statistics, for running many tests and reporting only the significant ones, for ignoring nonresponse and for conclusions that go beyond the data. Instructors value a short section that states the limits and what further evidence would strengthen the conclusions. Plain-language explanations of each statistic are valued as much as the statistics themselves.
MKT 337 Module 6 help: the mistakes that cost points
Before any test, compare respondents with what you know about the population, and weight or caveat if they differ. Run the tests you planned, not new ones chosen because they look interesting. For each result, report the statistic, whether it is significant and, most importantly, what it means in plain words and in size. Put results in simple tables. Check scales for reliability before using them. Separate what the data show from what they suggest. End each finding with its implication for the decision, so the reader never has to guess why it matters. Avoid adding new tests after seeing the data unless you label them clearly as exploratory.
Get MKT 337 Module 6 written to your instructions
Upload the MKT 337 Module 6 instructions and your data or results. We check for nonresponse bias, run the planned tests, report reliability, explain every result in plain language and tie the findings to the decision, with research behind the interpretation. There is no charge for a first analysis, which normally reaches you by the second day. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 337 papers and related BS Marketing samples
- MKT 337 Module 1 Discussion: Asking the Right Question First
- MKT 337 Module 2 Secondary Data Analysis Assignment: What the Ticketing Records Already Say
- MKT 337 Module 3 Milestone One: The Research Plan
- MKT 337 Module 4 Discussion: Fixing the Board's Twelve Questions
- MKT 337 Module 5 Milestone Two: The Questionnaire and Measurement Plan
- MKT 337 Module 7 Final Project: The Marketing Research Report
- MKT 337 Module 8 Discussion: When the Forecast Met the Box Office
- OL 215 Module 3 Milestone One: Management Problem Analysis
- QSO 420 Module 8 Discussion: The Board Wants a New Baseline
- OL 320 Module 3 Final Project Milestone Two Presentation: Five-slide pitch for SeatWell Apparel
- OL 211 Module 1 Discussion: Why a Growing Company Needs HR
MKT 337 Module 6 questions, answered
Where can I find a free MKT 337 Module 6 Data Analysis Assignment sample?
A complete MKT 337 Module 6 data analysis is on this page, testing four hypotheses from a theater's survey of 648 patrons.
How do you check a survey for nonresponse bias?
Compare respondents with the population on characteristics you already know, such as age or purchase history, and weight or caveat the results if they differ.
What test compares two percentages?
A chi-square test or a test of two proportions shows whether the difference between two groups' percentages is larger than chance would produce.
What is the difference between statistical and practical significance?
Statistical significance says a difference is unlikely to be chance; practical significance asks whether it is large enough to matter for a decision.
Can a survey prove why customers left?
It can show which reasons customers report and which factors go together, but it cannot prove cause the way an experiment can.