| Course | MKT 337 Marketing Research |
|---|---|
| Module | Module 5 |
| Paper type | undergraduate milestone presenting a questionnaire, measures, scales and an analysis plan |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 337 Module 5
From Interviews to Items: The Questionnaire and Measurement Plan for Chippewa Valley Playhouse
[Student Name]
Southern New Hampshire University
MKT 337: Marketing Research
Milestone Two: Questionnaire and Measurement Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
From Interviews to Items: The Questionnaire and Measurement Plan for Chippewa Valley Playhouse
Introduction
The plan approved in Milestone One set four hypotheses about why subscribers lapse and what packages would appeal: that online-only renewal drove lapses among older subscribers, that experimental plays drove lapses among newer ones, that single-ticket buyers prefer a flexible three-show pack and that newer and lapsed patrons are more price-sensitive. Twenty-four interviews were completed in October. This milestone reports what they added, presents the questionnaire for the three groups and sets out how each hypothesis will be measured and tested.
What the Interviews Added
The interviews confirmed two expected themes and added one. Nine of the twelve lapsed subscribers mentioned renewal, most often the confusion of moving online, and seven said a particular play "wasn't for us." The surprise was time: six lapsed patrons and five single-ticket buyers said evening shows that ran past 10:30 p.m. kept them away, especially in winter. The survey therefore adds a question on preferred start times and matinees. Interviewees also used the phrase "feels like our theater" when describing why they stayed or left, which became the basis for the attachment scale.
Question-to-Hypothesis Map
Questions mapped to hypotheses
| Hypothesis | Questions | Groups asked |
|---|---|---|
| Renewal process and older lapsers | Reasons for not renewing, randomized list; how renewal was attempted | Lapsed |
| Experimental plays and newer lapsers | Rating of each production attended; attachment scale | Current, lapsed |
| Flexible pack for single-ticket buyers | Package choice task | Single-ticket, lapsed |
| Price sensitivity | Package choice at one of two randomly assigned prices | All |
| Time of performances (from interviews) | Preferred start times; interest in matinees | All |
Measuring Attachment
Whether patrons feel the theater is "theirs" cannot be captured by one question. Churchill (1979) laid out a sequence for building sound marketing measures, beginning with a precise definition of the idea, moving through a pool of candidate items and a first round of data and ending with weeding out items that do not fit and testing what remains. Following it, five items were written from the interview language, such as "Chippewa Valley Playhouse feels like my theater" and "I would be disappointed if the playhouse closed," each answered on a five-point agreement scale whose every point carries a word label. After collection, items will be checked for internal consistency and any item that fails to fit will be dropped before the scale is used.
Choices Instead of Intentions
The board's draft asked, "Would you subscribe next season?" Morwitz et al. (2007) found survey promises to purchase lining up with later sales far better for familiar products bought soon than for anything new, and this pack has never existed. Instead, respondents see the full subscription, a pick-any-three pack and a pass covering only musicals, each priced, and choose one or none. Half the respondents, assigned at random, see prices $20 higher than the other half. Comparing choices between the two versions measures price sensitivity without asking anyone to predict their own behavior.
Reducing Common Method Bias
Podsakoff et al. (2003) reviewed how common method bias inflates or distorts relationships among variables measured from the same respondents with the same method, and recommended remedies such as separating predictor and outcome measures, varying response formats and protecting anonymity. The questionnaire places the attachment scale early and the package choices late, uses different formats for ratings, lists and choices, draws behavior such as tenure and shows attended from the ticketing records rather than asking for it and assures respondents that answers go to an outside volunteer team, not the board.
Ethics and Consent
The invitation explains who is conducting the survey, how long it takes, that nobody has to take part and that results will be shown only as group totals. Survey links are unique to each person so the theater can match responses to ticketing records for the nonresponse check, and the invitation says so plainly. Names will be removed before the volunteer team shares results with the board, and nobody on the board will see an individual response.
Sequence
The questionnaire opens with easy questions about the last show attended, moves to ratings of productions, then the attachment scale, then reasons for not renewing for lapsed patrons, then the package choices and finally age and household questions. Sensitive questions come late and offer a "prefer not to say" option.
Questions for Each Group
The three groups receive versions of one questionnaire. Current subscribers skip the reasons for lapsing and answer a short block on what would make them renew at a higher price. Lapsed subscribers answer the reasons list first among the behavior questions, while their memory of the decision is the focus, and are asked whether they still attend single shows. Single-ticket buyers skip the attachment items about subscribing and answer a block on how they hear about shows and choose which to attend. All versions share the production ratings, the package choice task and the start-time questions, so that the groups can be compared directly on the points that matter most for the decision.
Pretest
Ten patrons, three from each group plus one long-term volunteer, will complete the questionnaire while a volunteer watches and notes hesitations, then answer a few questions about anything confusing. The online and paper versions will both be tested, since older lapsed subscribers will mostly use paper.
Analysis Plan
Planned tests
| Hypothesis | Test |
|---|---|
| Renewal process and age | Chi-square test comparing the share of lapsers 70 and over and under 70 citing renewal |
| Experimental plays | Comparison of mean ratings of experimental productions between early lapsers and renewers |
| Flexible pack preference | Share of single-ticket buyers choosing the flexible pack, tested against 50 percent |
| Price sensitivity | Difference in choice shares between the two price versions, by group |
Conclusion
The questionnaire asks only what the hypotheses need, measures attachment with a tested scale, observes choices instead of collecting promises and plans every test before a single response arrives. The interviews have already earned their cost by adding the question of start times. Once the pretest is complete and any confusing items are fixed, the survey will go to all three samples on the same day, so that no group answers under different circumstances, such as after a well-reviewed or poorly reviewed show opens.
References
Churchill, G. A., Jr. (1979). A paradigm for developing better measures of marketing constructs. Journal of Marketing Research, 16(1), 64-73. https://doi.org/10.2307/3150876
Morwitz, V. G., Steckel, J. H., & Gupta, A. (2007). When do purchase intentions predict sales? International Journal of Forecasting, 23(3), 347-364. https://doi.org/10.1016/j.ijforecast.2007.05.015
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903. https://doi.org/10.1037/0021-9010.88.5.879
What the MKT 337 Module 5 instructions ask for
Milestone Two in MKT 337 usually asks you to develop the data collection instrument for your study, most often a questionnaire, along with how variables will be measured and how the data will be analyzed. A strong milestone links every question to an objective or hypothesis, uses measurement scales that fit the concept, builds multi-item scales for abstract ideas rather than relying on a single question, avoids wording and order problems, plans a pretest with real respondents and states the statistical test for each hypothesis before data are collected. It should show how the exploratory phase shaped the questions, since that is the point of doing interviews first. Explaining what the exploratory phase changed in the questionnaire shows the design was not decided in advance.
How this MKT 337 Module 5 milestone two example is built
The sample presents Chippewa Valley Playhouse's questionnaire. Twenty-four interviews found lapsed patrons mentioning the online renewal, unfamiliar plays and late finishes, so the survey adds questions on each. Every question is mapped to one of four hypotheses. A five-item attachment scale is developed following Churchill's paradigm, with reliability to be checked. Instead of asking whether people would subscribe, respondents choose among three packages shown at one of two randomly assigned prices, an approach supported by Morwitz, Steckel and Gupta's evidence on intentions. Question formats are varied and separated, as Podsakoff and colleagues advise, and a pretest with ten patrons precedes launch. A planned test for every hypothesis is set out before any data arrive.
Where the MKT 337 Module 5 rubric puts the points
Instrument milestones are commonly graded on the link between questions and objectives, the quality of measurement and scales, question wording and sequence, the analysis plan and writing. Top milestones show a question-to-hypothesis map, use multi-item scales for abstract concepts with a plan to check reliability, choose question formats that reduce bias, pretest with real respondents and match each hypothesis to an appropriate test. Marks drop for questionnaires that include questions no objective needs, for single-item measures of complex ideas, for purchase intention questions taken at face value and for analysis plans written after the data arrive. A sample of the actual questionnaire, not only a description, strengthens the paper. A short pretest report, even of a handful of respondents, adds credibility.
MKT 337 Module 5 help: the mistakes that cost points
List your hypotheses and write, beside each, the questions that will test it; cut any question that serves none. For abstract ideas such as loyalty or attachment, write several items and plan to check that they hang together. Prefer questions about past behavior and choices among realistic options to questions about future intentions. Vary formats and place related questions apart to reduce people answering everything the same way. Pretest with a handful of real respondents and watch where they hesitate. Finally, name the test for each hypothesis now, before the data arrive. Keep the questionnaire short enough to finish in about twelve minutes; length costs responses.
Get MKT 337 Module 5 written to your instructions
Bring the MKT 337 Milestone Two guidelines along with your research plan and any interview notes. We map questions to hypotheses, build scales that hold up, write choice questions that beat stated intentions, plan a pretest and set the right test for each hypothesis. The first milestone is free and is normally done in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 337 papers and related BS Marketing samples
- MKT 337 Module 1 Discussion: Asking the Right Question First
- MKT 337 Module 2 Secondary Data Analysis Assignment: What the Ticketing Records Already Say
- MKT 337 Module 3 Milestone One: The Research Plan
- MKT 337 Module 4 Discussion: Fixing the Board's Twelve Questions
- MKT 337 Module 6 Data Analysis Assignment: What 648 Patrons Said
- MKT 337 Module 7 Final Project: The Marketing Research Report
- MKT 337 Module 8 Discussion: When the Forecast Met the Box Office
- ACC 330 Module 3 Gross Income and Exclusions Assignment: What Counts and What Does Not
- ACC 317 Module 3 Balance Sheet and Cash Flow Assignment: A Classified Balance Sheet and Indirect Cash Flows
- SPT 208 Module 1 Discussion: Why a Race Is Not a Jacket
- PSY 270 Module 6 Job Satisfaction, Stress and Withdrawal Report: Satisfaction, strain and quitting
MKT 337 Module 5 questions, answered
Where can I find a free MKT 337 Module 5 Milestone Two sample?
The full MKT 337 Module 5 Milestone Two is on this page: a theater's questionnaire, scales and analysis plan.
How do you develop a multi-item scale?
Define the concept, generate several items that capture it, test them with a sample, drop weak items and check reliability and validity before relying on the scale.
Why not just ask people if they would buy?
Stated intentions often overstate future purchases, especially for new offerings, so choices among priced options usually predict behavior better.
What is common method bias?
Distortion that arises when all measures come from the same respondents in the same format, so answers correlate partly because of how they were asked.
Why pretest a questionnaire?
A pretest with real respondents reveals confusing wording, missing options and questions that take too long, before mistakes spoil the main survey.