| Course | MKT 337 Marketing Research |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post on questionnaire wording, response scales and bias |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Marketing |
| Updated | October 2026 |
Free sample paper for MKT 337 Module 4
Module Four Discussion
Three Questions I Had to Rewrite
A Chippewa Valley Playhouse board member drafted twelve survey questions for the subscriber research I described in my research plan. Most are fine, but three would distort the answers we need.
Draft: "How satisfied are you with our shows and ticket prices?" with a five-point scale labeled only at the ends. A respondent who loves the shows but thinks prices are too high has no honest answer. Rewrite: two separate questions, one about "the plays and musicals you attended last season" and one about "the price of a season subscription," each with fully labeled points from "very dissatisfied" to "very satisfied." Krosnick (1999) reviewed evidence that labeling every scale point improves the reliability of answers and that respondents interpret questions using the rules of everyday conversation, so they try to make sense of a question that asks two things, often by answering only one of them.
Draft: "Do you support the theater's bold new artistic direction?" The word "bold" signals the board's view, and "new direction" assumes respondents know what it means. Rewrite: "Please rate each of last season's productions," listing all five by title with a scale and a "did not attend" option. Schwarz (1999) showed how the wording of questions and the response options offered shape what people report, because respondents use every part of a question to infer what is being asked.
Draft, for lapsed subscribers: "Did you stop subscribing because you couldn't afford it?" Few people like admitting they cannot afford something. Rewrite: "Which of these, if any, played a part in your decision not to renew?" followed by eight reasons in random order, including "the price of the subscription," "the renewal process" and "the choice of shows." Tourangeau and Yan (2007) found that misreporting on sensitive topics is common and largely situational, and that people edit answers to avoid embarrassment, especially when an interviewer is present. A self-completed list makes the price answer easier to give.
Which of these errors do you see most often in surveys you receive, and which do you think you are most likely to make yourself?
References
Krosnick, J. A. (1999). Survey research. Annual Review of Psychology, 50, 537-567. https://doi.org/10.1146/annurev.psych.50.1.537
Schwarz, N. (1999). Self-reports: How the questions shape the answers. American Psychologist, 54(2), 93-105. https://doi.org/10.1037/0003-066X.54.2.93
Tourangeau, R., & Yan, T. (2007). Sensitive questions in surveys. Psychological Bulletin, 133(5), 859-883. https://doi.org/10.1037/0033-2909.133.5.859
What the MKT 337 Module 4 instructions ask for
The Module 4 discussion in MKT 337 usually asks about questionnaire design: question wording, question types, response scales, order effects and common errors such as double-barreled, leading or loaded questions. You may be asked to critique sample questions or write your own. A strong post shows real questions before and after revision, names the specific problem in each, explains with research why the problem distorts answers and offers a revision that a respondent could answer easily and honestly. It treats sensitive topics with particular care, since the topics an organization most needs to understand are often the ones people are least willing to report accurately. Pretesting revised questions on a few real respondents is worth mentioning.
How this MKT 337 Module 4 discussion example is built
The sample rewrites three of the twelve questions a board member drafted for Chippewa Valley Playhouse. "How satisfied are you with our shows and ticket prices?" asks two things at once and is split. "Do you support the theater's bold new artistic direction?" leads respondents and is replaced by a neutral rating of recent plays. "Did you stop subscribing because you couldn't afford it?" is blunt about money and is replaced by a list of reasons, including price, in random order. The post explains each change with Schwarz on how questions and response options shape answers, Krosnick on survey methods and scale labels and Tourangeau and Yan on sensitive questions, and invites classmates to share habits they would change.
Where the MKT 337 Module 4 rubric puts the points
Questionnaire design discussions are typically assessed on the identification of specific wording problems, the quality of revisions, the use of research on survey response and the quality of replies. The strongest posts quote the original questions, name each error precisely, explain the mechanism by which it distorts answers and show a revision. Posts lose credit for general advice such as "avoid bias" without examples, for revisions that introduce new problems, for research cited without findings and for replies that agree without critiquing. Attention to response scales, not only to question stems, separates strong posts from average ones. Mentioning a pretest of the revised questions shows awareness of how surveys are actually built.
MKT 337 Module 4 help: the mistakes that cost points
Choose two or three real questions, from a survey you received or one you are drafting. For each, ask: does it ask one thing, could it be read two ways, does it hint at the right answer and does it ask about something embarrassing? Rewrite it, and check the response options too, since scales shape answers as much as wording. Use research on how people answer surveys to explain the problem. Keep the post concrete, with before-and-after versions side by side. Ask classmates to share a survey habit they would change, which makes the replies practical. Read each revised question aloud to someone outside the course; confusion shows quickly.
Get MKT 337 Module 4 written to your instructions
Paste the MKT 337 Module 4 prompt and a few survey questions you are unsure about. We find what makes each one biased or confusing, rewrite it and explain the fix with research on how wording shapes answers, and close on a question that gets peers debating. The opening post is free; plan on two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 337 papers and related BS Marketing samples
- MKT 337 Module 1 Discussion: Asking the Right Question First
- MKT 337 Module 2 Secondary Data Analysis Assignment: What the Ticketing Records Already Say
- MKT 337 Module 3 Milestone One: The Research Plan
- MKT 337 Module 5 Milestone Two: The Questionnaire and Measurement Plan
- MKT 337 Module 6 Data Analysis Assignment: What 648 Patrons Said
- MKT 337 Module 7 Final Project: The Marketing Research Report
- MKT 337 Module 8 Discussion: When the Forecast Met the Box Office
- PSY 270 Module 8 Final Project Intervention Plan: Intervention plan to keep the growers
- HRM 425 Module 1 Discussion: Where the Apprentice Pipeline Leaks
- OL 317 Module 1 Discussion: What Makes a Small Business Different
- HRM 400 Module 7 Final Project: The Change Management Plan
MKT 337 Module 4 questions, answered
Where can I find a free MKT 337 Module 4 Discussion sample?
The full MKT 337 Module 4 post is published here, rewriting three biased survey questions for a community theater.
What is a double-barreled question?
One item that bundles two topics, shows and prices for instance, so the answer cannot reveal which topic the person was rating.
What is a leading question in a survey?
A question whose wording suggests a preferred answer, such as describing a policy as bold or exciting before asking whether people support it.
How do response options affect survey answers?
Research shows that the range and labels of response options influence how people interpret a question and what they report.
How should surveys ask about sensitive topics?
Neutrally, among other options, with assurances of confidentiality and, where possible, through self-completed forms, since people tend to edit embarrassing answers.