| Course | PSY 270 Introduction to Industrial Organizational Psychology |
|---|---|
| Module | Module 6 |
| Paper type | Job satisfaction, stress and withdrawal report |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 270 Module 6
Satisfaction, Strain and the Decision to Leave: Grow Technicians at Brightleaf Growers
[Student Name]
Southern New Hampshire University
PSY 270: Introduction to Industrial Organizational Psychology
Module Six Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Satisfaction, Strain and the Decision to Leave: Grow Technicians at Brightleaf Growers
Purpose
Earlier analyses of the grow technician job at Brightleaf Growers found low autonomy and feedback, lenient appraisal and 38 percent annual turnover. This report measures how technicians feel about their jobs, how much strain they report and how both relate to withdrawal, so that the company can see which factors are most closely tied to people leaving. A confidential survey was completed by 104 of the 140 technicians, 52 on day shifts and 52 on night shifts, and results were combined with HR records of absence.
Measures
Each construct was measured with established types of scales, adapted to the farm. Overall job satisfaction used three general items, such as "All in all, I am satisfied with my job," rated from 1 to 5. Facet satisfaction asked about five aspects of the job that satisfaction research commonly separates: the work itself, pay, supervision, coworkers and opportunities for promotion. Job demands were measured with items on workload, time pressure during alarms and the strain of night work. Job resources were measured with items on supervisor support, autonomy and feedback. Turnover intention was measured by agreement with "I am likely to look for a new job in the next year." Absence was taken from HR records as the percentage of scheduled shifts missed without notice over six months. All scales had acceptable internal consistency in this sample, with coefficient alpha between .78 and .88.
Satisfaction by Facet and Shift
Table 1 reports mean satisfaction on each facet, from 1 (very dissatisfied) to 5 (very satisfied).
Table 1
Mean Facet and Overall Satisfaction by Shift
| Facet | Day shift (n = 52) | Night shift (n = 52) | All technicians |
|---|---|---|---|
| Work itself | 3.1 | 2.7 | 2.9 |
| Pay | 3.0 | 3.0 | 3.0 |
| Supervision | 3.6 | 3.1 | 3.4 |
| Coworkers | 3.9 | 3.9 | 3.9 |
| Promotion opportunities | 2.4 | 2.2 | 2.3 |
| Overall job satisfaction | 3.2 | 2.8 | 3.0 |
Note. Composite survey data.
Reading the Satisfaction Results
Technicians like their coworkers and are neutral about pay. They are least satisfied with promotion opportunities and with the work itself, the two facets most closely tied to the job design problems identified earlier. Night technicians are less satisfied overall, and the gap is concentrated in the work itself and supervision rather than pay, which is the same for both shifts. This matters because the company's managers have assumed pay is the main problem.
Demands, Resources and Strain
The job demands-resources model proposes that strain develops when demands are high and resources are insufficient to meet them, while resources also build engagement (Bakker & Demerouti, 2007). Night technicians reported higher demands, especially time pressure during alarms, when they are often alone, and lower resources, especially supervisor support, since supervisors cover two buildings at night. The model predicts that this combination produces the most strain, and it did: 44 percent of night technicians reported feeling "used up" at the end of a shift often or always, compared with 23 percent on days. Among technicians with high demands, those who reported strong supervisor support showed strain levels close to the low-demand group, consistent with the model's claim that resources buffer demands.
What Relates to Withdrawal
Forty-seven percent of technicians agreed that they were likely to look for a new job in the next year. Table 2 shows how each factor relates to that intention.
Table 2
Correlations of Attitudes, Demands and Resources With Turnover Intention
| Factor | Correlation with turnover intention |
|---|---|
| Overall job satisfaction | -.52 |
| Satisfaction with the work itself | -.44 |
| Satisfaction with promotion opportunities | -.38 |
| Supervisor support | -.35 |
| Satisfaction with supervision | -.33 |
| Workload and time pressure | .31 |
| Autonomy | -.29 |
| Night shift (1 = night, 0 = day) | .24 |
| Satisfaction with pay | -.21 |
Note. Composite data, n = 104. All correlations shown are statistically significant at p < .05.
Interpreting Withdrawal
Overall satisfaction has the strongest relationship with intent to leave, and among specific factors the work itself, promotion and supervision matter more than pay. Absence follows the same pattern: night technicians missed 6.1 percent of scheduled shifts without notice, compared with 3.4 percent on days, and absence was higher among those with low satisfaction. Harrison et al. (2006) found that overall job attitudes predict a broad pattern of engagement and withdrawal, including lateness, absence and turnover, more strongly than they predict any single behavior, which suggests that absence at Brightleaf is an early signal of the same process that ends in resignation. When a technician starts missing night shifts, the company is watching a resignation in progress.
Satisfaction also matters for performance. Judge et al. (2001) estimated the correlation between job satisfaction and job performance at about .30 across many studies, so improving satisfaction is likely to bring modest gains in performance as well as retention.
Limitations
The data are cross-sectional and self-reported, so they show associations, not causes, and technicians who were already planning to leave may have rated everything more negatively. Turnover intention is a strong but imperfect predictor of actual departures. The survey should be repeated in six months and linked to actual turnover to confirm the pattern.
Where to Act First
The evidence points to three priorities, in order. First, add resources on night shifts, particularly a second supervisor or lead technician at night, since support buffers the demands that night technicians face. Second, redesign the work to increase autonomy, task identity and feedback, which addresses the weakest satisfaction facet. Third, create visible promotion steps from technician to senior technician and lead. Pay adjustments may still be warranted, but the data suggest they would do less than these changes.
Tracking the Measures Over Time
These measures are most useful as a running record rather than a single snapshot. I recommend that Brightleaf repeat the full survey twice a year and add a four-item pulse check each quarter covering overall satisfaction, supervisor support, workload and turnover intention. Absence without notice should be reported monthly by shift, since it moves faster than survey scores and, as the analysis showed, tends to precede resignations. Results should be shared with technicians along with what the company is doing in response; surveys that produce no visible action tend to lower response rates and trust the next time. Finally, when the night lead role and the job redesign are introduced, the company should compare the next survey's results for night and day shifts with this baseline. If night satisfaction and support rise and night absence falls toward the day level, the company will have evidence that the changes are working, not only a hope that they are.
References
Bakker, A. B., & Demerouti, E. (2007). The job demands-resources model: State of the art. Journal of Managerial Psychology, 22(3), 309-328. https://doi.org/10.1108/02683940710733115
Harrison, D. A., Newman, D. A., & Roth, P. L. (2006). How important are job attitudes? Meta-analytic comparisons of integrative behavioral outcomes and time sequences. Academy of Management Journal, 49(2), 305-325. https://doi.org/10.5465/amj.2006.20786077
Judge, T. A., Thoresen, C. J., Bono, J. E., & Patton, G. K. (2001). The job satisfaction-job performance relationship: A qualitative and quantitative review. Psychological Bulletin, 127(3), 376-407. https://doi.org/10.1037/0033-2909.127.3.376
What the PSY 270 Module 6 instructions ask for
The Module 6 assignment in PSY 270 examines job satisfaction, stress and withdrawal for the workplace you have been studying. The guidelines want the measures described, results reported, a theory used to interpret them and conclusions about action. Describe each measure with an example item and its reliability so a reader can judge the numbers. Facet measures, such as satisfaction with pay, supervision and the work itself, say more than a single overall item. The job demands-resources model is a common frame for stress. Report correlations carefully and avoid causal language from survey data. The report runs about three APA 7 pages with scholarly sources. Composite data are acceptable when labeled. Check the PSY 270 Module 6 guidelines for the required sections and number of sources.
How this PSY 270 Module 6 job satisfaction, stress and withdrawal report example is built
The purpose section explains that the founders want to know why technicians leave. The measures section lists a facet satisfaction scale, a demands and resources checklist, a strain measure, an intent to quit item and absence records, each with an example item and reliability. The first table reports satisfaction by facet for day and night shifts, and the reading section notes that night technicians are least satisfied with supervision. The demands and resources section shows heavy workload paired with little support at night. The second table reports correlations with intent to quit, strongest for supervision and strain. The interpretation section links the pattern to the model. Limitations cover the single survey and self-report. Priorities for action and a tracking plan close the report.
Where the PSY 270 Module 6 rubric puts the points
PSY 270 scores the Module 6 report on the measures, the results, the theory, the interpretation, the limitations and writing, and Brightspace shows SNHU's four levels beside each. For measures, graders reward scales described with items and reliability. Results earn credit when tables are clear and the text explains patterns rather than repeating numbers. Using the job demands-resources model to organize stress findings scores well in the theory row. Interpretation should stay within what correlations allow. A limitations section that names self-report and a single time point shows care. The writing row covers tables, APA references and headings. Ranking actions by the strength of the evidence, rather than listing every possible fix, shows the judgment the PSY 270 module asks for.
PSY 270 Module 6 help: the mistakes that cost points
Satisfaction reports often present one overall score and miss the differences between facets. Claiming that low satisfaction causes quitting, from a single survey, overstates what correlations show. Leaving measures undescribed makes every number hard to trust. Repeating the tables in the text adds length without insight. Give each measure an example item so readers know what was asked. Compare groups, such as shifts, where the data allow. Keep limitations honest and brief. Rank the actions, because a PSY 270 grader wants the founders to know where to start, and a report that says supervision on the night shift relates most strongly to intent to quit gives them a clear first step for the next quarter.
Get PSY 270 Module 6 written to your instructions
Send your PSY 270 Module 6 prompt and rubric with any data you have. A report on satisfaction, stress and withdrawal with measures made explicit comes back within 24 to 48 hours; your first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 270 papers and related BA Psychology samples
- PSY 270 Module 1 Roles of the I/O Psychologist Essay: An I/O psychologist at a farm
- PSY 270 Module 2 Job Analysis Report: Job analysis of a grow technician
- PSY 270 Module 3 Selection System Memo: Hiring technicians who stay
- PSY 270 Module 4 Performance Appraisal and Training Report: Fixing appraisal and training for technicians
- PSY 270 Module 5 Work Motivation Discussion: Technicians who never see the harvest
- PSY 270 Module 7 Leadership and Teams Discussion: A night shift with no leader
- PSY 270 Module 8 Final Project Intervention Plan: Intervention plan to keep the growers
- FIN 485 Module 3 Milestone One: Danielle's Net Worth, Cash Flow and Ratios
- MKT 335 Module 3 Milestone One: Objectives, Audiences and the Funnel Budget
- FIN 341 Module 4 Regulatory Framework Assignment: Who Regulates a Bank Like TD
- QSO 349 Module 4 Discussion: Fixed Price or Cost-Plus for a First-of-Its-Kind Boat?
PSY 270 Module 6 questions, answered
What does PSY 270 Module 6 cover?
This module typically covers job attitudes, especially job satisfaction and commitment, workplace stress and well-being, and withdrawal behaviors such as absence, lateness and turnover, along with how these are measured.
What is the job demands-resources model?
It proposes that every job has demands, which require sustained effort and can lead to strain, and resources, such as support, autonomy and feedback, which help people meet demands and foster engagement. Strain is most likely when demands are high and resources are low.
Does job satisfaction predict performance?
Yes, moderately. A large meta-analysis estimated the correlation between job satisfaction and job performance at about .30. Job attitudes predict a broader pattern of behavior, including withdrawal, more strongly than they predict performance alone.
Where can I find a free PSY 270 Module 6 sample report?
The complete report is above: job satisfaction by facet and shift, demands and resources, correlations with intent to quit and absence, limitations and priorities for action at a composite indoor farm. Use it as a model.
What is facet job satisfaction?
It is satisfaction measured separately for parts of a job, such as pay, supervision, coworkers, promotion and the work itself. Facet scores show which parts of a job people like or dislike, which a single overall rating can hide.