PSY 270 Module 5 Work Motivation Discussion Example

Reviewed by Portia Lambrick, MBA

This PSY 270 Module 5 discussion post applies one motivation theory in depth instead of surveying several. SNHU PSY 270 (PSY-270) asks BA Psychology students to apply work motivation research to a job, and the post uses Hackman and Oldham's job characteristics model with the grow technician role at Brightleaf Growers, a composite indoor farm. It rates the job on the model's five core dimensions, from skill variety and autonomy to feedback from the work itself. A motivating potential score shows why the job motivates less than it could, with task identity and feedback the weakest links, since technicians tend plants but never see the harvest leave. Three changes to the work itself are proposed, each aimed at one dimension. The post closes by inviting classmates to rate a job of their own on the model.

CoursePSY 270 Introduction to Industrial Organizational Psychology
ModuleModule 5
Paper typeWork motivation discussion post
LengthAbout 400 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBA Psychology
UpdatedOctober 2026

Free sample paper for PSY 270 Module 5

1

Module Five Discussion: Applying a Theory of Work Motivation

Re: The technicians who never see the lettuce leave

I am applying one theory, the job characteristics model, to grow technicians at a composite indoor farm called Brightleaf Growers, where more than a third of technicians left last year. I chose it because exit interviews describe the work as "checking numbers all night," which sounds like a problem with the job's design rather than with pay or goals.

Hackman and Oldham (1976) proposed that five core characteristics make work motivating: skill variety, task identity (completing a whole, identifiable piece of work), task significance, autonomy and feedback from the job itself. Rating the technician job from my observation notes on a 1-to-7 scale: skill variety is moderate (4), since technicians measure, inspect, seed and harvest. Task identity is low (2): technicians work one shift of a 35-day crop cycle and rarely see a crop through from seed to harvest. Task significance is actually high (6), since the farm supplies fresh produce to local grocers and hospitals, but no one tells them so. Autonomy is low (2), because every dosing change follows a fixed chart and needs supervisor sign-off. Feedback is low (2): results of their adjustments show up days later, on another shift.

The motivating potential score is ((4 + 2 + 6) / 3) x 2 x 2 = 16, out of a possible 343. Because autonomy and feedback are multiplied, the two lowest ratings are doing most of the damage. Pooling hundreds of studies, Humphrey et al. (2007) showed that these motivational characteristics were related to satisfaction, internal motivation and performance, and that social features of work, such as support from colleagues, added to that explanation.

Three changes would target the weak links. First, assign each technician a set of towers to follow through a full crop cycle across their shifts, raising task identity. Second, let certified technicians make dosing changes within defined ranges without sign-off, raising autonomy. Third, add a dashboard that shows each technician the yield and quality of their towers weekly, raising feedback. None of these costs much, and together they could raise the score several times over. Oldham and Hackman (2010) noted that work today is increasingly interdependent and team-based, so the dashboard could show team results as well.

Question for classmates: if you rated your own job on these five characteristics, which one is lowest, and could anything be changed without changing your pay?

What this page is doingThe post commits to one theory and applies every part of it, including the calculation, to the job. That depth is what distinguishes application from description.
2

References

Hackman, J. R., & Oldham, G. R. (1976). Motivation through the design of work: Test of a theory. Organizational Behavior and Human Performance, 16(2), 250-279. https://doi.org/10.1016/0030-5073(76)90016-7

Humphrey, S. E., Nahrgang, J. D., & Morgeson, F. P. (2007). Integrating motivational, social, and contextual work design features: A meta-analytic summary and theoretical extension of the work design literature. Journal of Applied Psychology, 92(5), 1332-1356. https://doi.org/10.1037/0021-9010.92.5.1332

Oldham, G. R., & Hackman, J. R. (2010). Not what it was and not what it will be: The future of job design research. Journal of Organizational Behavior, 31(2-3), 463-479. https://doi.org/10.1002/job.678

What the PSY 270 Module 5 instructions ask for

The Module 5 discussion in PSY 270 applies a theory of work motivation to a job. Many students summarize several theories in a sentence each, but the prompt rewards depth, so choose one and apply all of it. The job characteristics model, goal setting theory and self-determination theory all work well. Explain why your theory fits the problem in your first lines. Use the job from earlier modules, or one you know well, and give evidence for each rating. Cite the original theory and a meta-analysis, such as Humphrey and colleagues, in APA 7. The post runs about four hundred words, so tables or long quotations will not fit. Replies follow later in the module, and they should test a classmate's ratings or apply the theory to a different job.

How this PSY 270 Module 5 work motivation discussion example is built

The first lines name the job characteristics model and explain that it fits because the problem is the job, not the pay. The ratings paragraph scores the five dimensions on a seven-point scale with a sentence of evidence each: moderate variety, low task identity, moderate significance, low autonomy and very low feedback. The score paragraph calculates the motivating potential score and explains why low autonomy and feedback pull it down so far, since the formula multiplies them. Three proposals follow: showing technicians harvest and customer data, letting them own a full grow room from seeding to harvest and allowing them to adjust schedules within limits. The closing line asks classmates to rate one job they have held on the five dimensions and share the weakest one.

Where the PSY 270 Module 5 rubric puts the points

PSY 270 discussion grades cover the initial post, the replies, timing and writing, each judged on SNHU's four levels. The initial post reaches the top level when it applies every part of one theory to the job with evidence for each rating. Calculating the motivating potential score correctly shows command of the model. Redesign proposals earn credit when each one targets a specific dimension. Replies score well when they challenge a rating or apply the model to a new job. APA citation of the theory and research counts toward writing, along with staying near the word limit. PSY 270 instructors often favor depth over breadth in this module, so a post that applies one theory fully outscores one that lists four theories briefly.

PSY 270 Module 5 help: the mistakes that cost points

Motivation posts often name three or four theories and apply none of them fully. Rating a job's dimensions with no evidence makes the scores look invented. Getting the motivating potential formula wrong, by adding instead of multiplying autonomy and feedback, is an easy slip to avoid. Proposals such as paying more fall outside a job design theory. Keep each rating to one sentence of evidence so the post stays near four hundred words. Cite the 1976 article and a meta-analysis rather than a website. Avoid jargon classmates will not know. End by inviting classmates to score a job they have held, because a PSY 270 thread where everyone rates a real job shows the theory working across many kinds of work.

Get PSY 270 Module 5 written to your instructions

Share your PSY 270 Module 5 discussion prompt and rubric, and a post applying one motivation theory to your example comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More PSY 270 papers and related BA Psychology samples

PSY 270 Module 5 questions, answered

What is PSY 270 Module 5 about?

The fifth module usually covers work motivation, with theories such as need theories, goal setting, expectancy, equity and job design. Discussions often ask students to apply a theory to a real or described job.

What are the five core job characteristics?

Skill variety, task identity and task significance, plus autonomy and feedback from the job. The model proposes that these create experienced meaningfulness, responsibility and knowledge of results, which in turn increase internal motivation, satisfaction and performance.

How is the motivating potential score calculated?

The average of skill variety, task identity and task significance is multiplied by autonomy and by feedback. Because autonomy and feedback are multiplied, a very low score on either one pulls the whole score down.

Where can I find a free PSY 270 Module 5 discussion sample?

The full post is above: the job characteristics model applied to grow technicians at a composite indoor farm, with ratings on the five dimensions, a motivating potential score and three redesign ideas. Use it as a model.

Who created the job characteristics model?

J. Richard Hackman and Greg Oldham developed the model in the 1970s. Their 1976 article tested it and argued that five features of a job, including autonomy, variety and feedback, shape motivation and satisfaction at work.