| Course | PSY 270 Introduction to Industrial Organizational Psychology |
|---|---|
| Module | Module 7 |
| Paper type | Leadership and teams discussion post |
| Length | About 370 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BA Psychology |
| Updated | October 2026 |
Free sample paper for PSY 270 Module 7
Module Seven Discussion: Leadership and Team Effectiveness
Re: The night shift does not need a better boss; it needs one who is there
My example is the night shift at Brightleaf Growers, a composite indoor farm. Six to eight grow technicians work each night across two buildings, and one supervisor covers both. Night technicians report the lowest satisfaction with supervision and the highest strain, and most of the farm's crop losses trace back to problems noticed at night but not passed on.
My claim is that the night shift's first leadership problem is absence. Judge and Piccolo (2004) found in a meta-analysis that transformational leadership had the strongest overall relationship with follower outcomes, but contingent reward, clearly linking expectations and recognition, was nearly as strong, while laissez-faire leadership was negatively related to follower satisfaction and leader effectiveness. A supervisor who is in the other building when an alarm sounds is, from the technicians' point of view, practicing laissez-faire leadership whatever their intentions.
The team problem is related. In a study of manufacturing teams, Edmondson (1999) showed that a shared sense that speaking up would not be punished went with more asking, reporting and reflecting on errors, and that this learning behavior was linked to how well teams performed. Technicians told me they do not always report a dosing mistake at handoff because the day supervisor treats errors as carelessness. When admitting a mistake feels risky, the mistake is passed on silently to the next shift. Mathieu et al. (2008) described team effectiveness as depending on processes such as coordination and communication as well as on member ability, and handoff is exactly such a process.
So I would recommend a night lead technician in each building, chosen from experienced technicians, with three behaviors. First, be present and reachable during every alarm. Second, use contingent reward concretely: tell technicians what good handoff looks like and recognize it when it happens. Third, respond to reported mistakes by asking what happened and fixing the cause, so that reporting becomes normal. The day supervisors would need to match the third behavior, or the night shift's safety would end at 6 a.m.
Question for classmates: have you worked a shift where the nominal leader was rarely present, and what did the team do to fill the gap?
References
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Judge, T. A., & Piccolo, R. F. (2004). Transformational and transactional leadership: A meta-analytic test of their relative validity. Journal of Applied Psychology, 89(5), 755-768. https://doi.org/10.1037/0021-9010.89.5.755
Mathieu, J., Maynard, M. T., Rapp, T., & Gilson, L. (2008). Team effectiveness 1997-2007: A review of recent advancements and a glimpse into the future. Journal of Management, 34(3), 410-476. https://doi.org/10.1177/0149206308316061
What the PSY 270 Module 7 instructions ask for
The Module 7 discussion in PSY 270 applies research on leadership, teams or both to a workplace situation. The prompt rewards a clear claim supported by evidence, so state your argument in the first lines. Meta-analyses are useful here, since they summarize many studies of leadership styles. Connect the research to a specific problem, such as errors, conflict or turnover, rather than to leadership in general. Two or more scholarly sources, cited in APA 7, are expected, and the post should stay near four hundred words. Translate research into behaviors a leader could actually do on a shift. Replies follow later in the module and should add evidence or test the claim against a classmate's own experience. A composite workplace keeps real coworkers unidentifiable.
How this PSY 270 Module 7 leadership and teams discussion example is built
The opening lines describe the night shift and claim that the missing ingredient is a leader who is present. The second paragraph cites Judge and Piccolo's finding that laissez-faire leadership relates negatively to outcomes, while transformational and contingent reward leadership relate positively. The third paragraph uses Edmondson's work on psychological safety to explain why technicians do not report mistakes at handoff and how that leads to lost crops. The fourth paragraph lists behaviors for a new night lead: walking both buildings twice a shift, running a five-minute handoff huddle, thanking people who report errors and setting clear weekly targets. The closing question asks classmates whether they have worked a shift with no leader present and what filled the gap.
Where the PSY 270 Module 7 rubric puts the points
In PSY 270, this discussion is graded on the opening post, two or more replies to peers, punctual posting and clear writing, and every criterion uses SNHU's four levels. The initial post earns top marks when it makes a clear argument, supports it with research and turns the research into specific behaviors. Using a meta-analysis shows the student understands the weight of evidence. Replies score well when they test the argument with a study or a different workplace. APA citation and staying near the word limit count toward writing. PSY 270 instructors often reward posts that apply team research to a concrete problem, such as handoff errors, rather than describing leadership styles in the abstract, since application is the skill the module builds.
PSY 270 Module 7 help: the mistakes that cost points
Leadership posts often describe transformational leadership in general terms and stop there. Writing about leadership without any team or workplace problem leaves nothing to apply the research to. Citing a popular leadership book instead of research weakens the evidence. Recommendations such as be a better leader give no behavior to act on. Make one claim and support it. Use numbers from the meta-analysis only if you explain them. Keep the post near four hundred words. Close with a question about classmates' own shifts, because a PSY 270 thread where peers describe leaderless shifts they worked, and what went wrong or right, gives everyone concrete cases to test the research against in the replies.
Get PSY 270 Module 7 written to your instructions
Send the PSY 270 Module 7 discussion instructions and grading rubric; a reply that puts leadership and team research to work on your example comes back within 24 to 48 hours; the first is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More PSY 270 papers and related BA Psychology samples
- PSY 270 Module 1 Roles of the I/O Psychologist Essay: An I/O psychologist at a farm
- PSY 270 Module 2 Job Analysis Report: Job analysis of a grow technician
- PSY 270 Module 3 Selection System Memo: Hiring technicians who stay
- PSY 270 Module 4 Performance Appraisal and Training Report: Fixing appraisal and training for technicians
- PSY 270 Module 5 Work Motivation Discussion: Technicians who never see the harvest
- PSY 270 Module 6 Job Satisfaction, Stress and Withdrawal Report: Satisfaction, strain and quitting
- PSY 270 Module 8 Final Project Intervention Plan: Intervention plan to keep the growers
- SPT 111 Module 3 Milestone One: Mission, Structure and People
- SPT 333 Module 8 Discussion: Girls Who Want to Play
- HRM 200 Module 6 Training and Performance Assignment: Onboarding, Safety and Reviews That Help
- QSO 320 Module 2 Model Formulation Assignment: Trees, Wreaths and Garland in Symbols
PSY 270 Module 7 questions, answered
What does the PSY 270 Module 7 discussion cover?
The seventh module usually addresses leadership and teams, and its discussion often asks students to apply leadership theories or team effectiveness research to a workplace situation and explain how leadership affects team outcomes.
What is laissez-faire leadership?
Laissez-faire leadership is the absence of leadership: avoiding decisions, being unavailable when needed and not responding to problems. Research consistently finds it is associated with worse outcomes for followers than active forms of leadership.
What is psychological safety?
Psychological safety is a shared belief within a team that it is safe to take interpersonal risks, such as admitting mistakes, asking questions or raising concerns, without being embarrassed or punished. It supports learning behavior in teams.
Where can I find a free PSY 270 Module 7 discussion sample?
The full post is on this page: leadership styles and psychological safety applied to a night shift with no leader present, with specific behaviors for a new lead and a question for classmates. Use it as a model.
What is transformational leadership?
Transformational leaders inspire followers with a vision, set an example, challenge them to think in new ways and attend to their individual needs. Meta-analyses link it to higher follower satisfaction, motivation and performance.