| Course | QSO 320 Management Science through Spreadsheets |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment formulating a linear programming model, defining variables, objective and constraints, and designing its spreadsheet layout |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for QSO 320 Module 2
Trees, Wreaths and Garland in Symbols: Formulating Grayson Hollow's November Product Mix
[Student Name]
Southern New Hampshire University
QSO 320: Management Science through Spreadsheets
Model Formulation Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Trees, Wreaths and Garland in Symbols: Formulating Grayson Hollow's November Product Mix
Introduction
Every fall the farm must settle its season's output of the four products it sells wholesale or ships to order. The owner plans by rule of thumb, as described in Module 1. This assignment formulates the decision as a linear programming model and designs the spreadsheet that will hold it, so that Project One can solve it with Excel Solver and analyze its sensitivity. Dantzig (2002) described linear programming as a method for allocating limited resources among competing activities, and that is the farm's November problem exactly.
Decision Variables
The model has four decision variables, each measured over the four-week harvest season. P is the number of premium trees, seven to eight feet tall, harvested, baled and shipped wholesale. S is the number of standard trees, five to seven feet, harvested, baled and shipped wholesale. W is the number of 24-inch wreaths made. G is the number of 25-foot coils of garland made. Choose-and-cut sales on the farm are treated separately and are not part of this model.
Objective Function
The objective is to maximize total contribution, which is price minus variable cost for each unit, before fixed costs such as land, equipment and year-round salaries. Based on 2025 prices and costs, contribution is $38 per premium tree, $24 per standard tree, $11 per wreath and $9 per coil of garland.
Maximize Z = 38P + 24S + 11W + 9G
Constraints
Harvest crew hours: 60 seasonal workers working 40 hours a week for four weeks provide 9,600 hours. Cutting and carrying a premium tree takes about 0.30 hours and a standard tree about 0.22 hours: 0.30P + 0.22S ≤ 9,600.
Baler hours: two baling machines can run a combined 1,900 hours over the season, and each tree needs about 0.05 hours: 0.05P + 0.05S ≤ 1,900.
Truck slots: the farm has contracted 40 truckloads of 600 slots each. A premium tree uses a full slot; a smaller standard tree uses 0.8 of a slot because more fit in a stack: 1.0P + 0.8S ≤ 24,000.
Wreath shop hours: the shop has 7,200 hours of labor, and a wreath takes 0.35 hours and a coil of garland 0.25 hours: 0.35W + 0.25G ≤ 7,200.
Bough supply: wreaths use six pounds of boughs and garland five pounds. Boughs come from 40,000 pounds bought from neighboring growers plus trimmings from harvested trees, about three pounds per premium tree and two and a half per standard tree: 6W + 5G ≤ 40,000 + 3P + 2.5S, which is rewritten for the spreadsheet as −3P − 2.5S + 6W + 5G ≤ 40,000.
Field inventory: the fall field count found 14,000 premium and 26,000 standard trees ready to cut: P ≤ 14,000 and S ≤ 26,000.
Orders: wreath orders total 18,000 and garland orders 8,000: W ≤ 18,000 and G ≤ 8,000.
Contract minimums: the farm has agreed to supply its lots with at least 6,000 premium and 10,000 standard trees: P ≥ 6,000 and S ≥ 10,000.
Non-negativity: P, S, W, G ≥ 0.
Checking Units and Directions
Each constraint was checked for units: the crew constraint is in hours on both sides, the truck constraint in slots and the bough constraint in pounds. Directions were checked by asking whether the business limit is a ceiling or a floor; only the contract minimums are floors. The bough constraint deserves attention because it links products: cutting more trees creates more boughs, so wood that leaves the farm as a tree also helps make wreaths. Leaving that link out would make the model understate how many wreaths the farm can make.
Assumptions
The model assumes that contribution and resource use per unit are constant regardless of volume, that the variables can take fractional values, which is reasonable for numbers in the thousands, and that all coefficients are known. In reality, crew productivity varies with weather, and prices for the last trees of the season can drop. Project One will test how sensitive the answer is to these numbers.
Spreadsheet Design
Panko (1998) summarized research showing that errors occur in a few percent of spreadsheet cells, so that large models almost certainly contain some, and that most spreadsheets are built informally. The layout is designed to make errors easier to catch. The input block at the top lists every coefficient and limit, each in its own labeled cell with its source noted beside it. The decision block holds four cells for P, S, W and G, shaded yellow. The objective cell multiplies the contribution inputs by the decision cells using a single SUMPRODUCT. The constraint block lists each constraint on its own row: a SUMPRODUCT of its coefficients and the decision cells on the left, its limit on the right and the direction written between them. Fylstra et al. (1998) noted that Solver works best when a model is linear and stated through clear cell references, and that common user problems include nonlinear formulas introduced by accident; keeping every constraint as a SUMPRODUCT of inputs and decisions avoids that.
Constraint block as laid out in the spreadsheet
| Constraint | P | S | W | G | Used | Sign | Limit |
|---|---|---|---|---|---|---|---|
| Crew hours | 0.30 | 0.22 | 0 | 0 | formula | ≤ | 9,600 |
| Baler hours | 0.05 | 0.05 | 0 | 0 | formula | ≤ | 1,900 |
| Truck slots | 1.0 | 0.8 | 0 | 0 | formula | ≤ | 24,000 |
| Wreath shop hours | 0 | 0 | 0.35 | 0.25 | formula | ≤ | 7,200 |
| Bough balance | -3 | -2.5 | 6 | 5 | formula | ≤ | 40,000 |
| Premium ready | 1 | 0 | 0 | 0 | formula | ≤ | 14,000 |
| Standard ready | 0 | 1 | 0 | 0 | formula | ≤ | 26,000 |
| Wreath orders | 0 | 0 | 1 | 0 | formula | ≤ | 18,000 |
| Garland orders | 0 | 0 | 0 | 1 | formula | ≤ | 8,000 |
| Premium contract | 1 | 0 | 0 | 0 | formula | ≥ | 6,000 |
| Standard contract | 0 | 1 | 0 | 0 | formula | ≥ | 10,000 |
Conclusion
The farm's November decision can be written as a linear program with four variables and eleven constraints, laid out so every number can be traced and changed. Project One will solve it, interpret the answer and use the sensitivity report to value the farm's scarce resources.
References
Dantzig, G. B. (2002). Linear programming. Operations Research, 50(1), 42-47. https://doi.org/10.1287/opre.50.1.42.17798
Fylstra, D., Lasdon, L., Watson, J., & Waren, A. (1998). Design and use of the Microsoft Excel Solver. Interfaces, 28(5), 29-55. https://doi.org/10.1287/inte.28.5.29
Panko, R. R. (1998). What we know about spreadsheet errors. Journal of End User Computing, 10(2), 15-21. https://doi.org/10.4018/joeuc.1998040102
What the QSO 320 Module 2 instructions ask for
The QSO 320 Module 2 assignment typically asks students to formulate a business problem as a linear programming model and set it up in a spreadsheet. Expect to define the decision variables with units, write the objective function, write each constraint and explain where its coefficients come from, state the assumptions of the model and design a spreadsheet that separates inputs, decision cells, calculations and constraints so Solver can be applied. Strong submissions check every constraint for units and direction, include constraints that are easy to forget, such as minimum commitments or links between products, and explain modeling choices in plain language. The formulation should be clear enough that someone else could build the same spreadsheet.
How this QSO 320 Module 2 model formulation assignment example is built
The assignment formulates the November product mix for Grayson Hollow Fir Farm, a fictional tree grower. Four decision variables count premium trees, standard trees, wreaths and coils of garland. The objective maximizes total contribution at $38, $24, $11 and $9 per unit. Eleven constraints cover 9,600 crew hours, 1,900 baler hours, 24,000 truck slots, 7,200 wreath shop hours, a bough balance in which each premium tree trimmed yields three pounds and each standard tree two and a half pounds on top of 40,000 pounds bought, trees ready in the field, wreath and garland orders and contract minimums. Dantzig on linear programming, Fylstra and colleagues on how Solver reads a model and Panko on spreadsheet error rates shape the layout.
Where the QSO 320 Module 2 rubric puts the points
The model formulation assignment in QSO 320 is generally graded on precise decision variables with units, a correct objective, complete and correctly directed constraints with justified coefficients, clearly stated assumptions and a well-organized spreadsheet layout ready for Solver. The best submissions explain where each number comes from, catch links such as by-products that add supply and separate inputs from formulas so the model can be changed safely. Credit drops when variables are vague, constraints are missing or reversed, units do not match, assumptions are ignored or the spreadsheet mixes numbers into formulas. Organization and APA citations complete the grade.
QSO 320 Module 2 help: the mistakes that cost points
Start by writing each decision variable as a sentence with units, such as P = number of premium trees harvested and shipped this season. Then write the objective in the same units. For each limited resource, write how much each unit of each variable uses and how much is available, and check that both sides are in the same units. Look for links between products, such as one product's by-product feeding another, and for commitments that set minimums. In the spreadsheet, put all inputs in one labeled block, decision cells in another and constraint calculations beside their limits, and never type a number inside a formula. A common mistake is writing a constraint in the wrong direction; another is forgetting minimum contracts, which can make a model's answer unusable.
Get QSO 320 Module 2 written to your instructions
Share the QSO 320 Module 2 instructions and describe the decision you are modeling. A writer defines the decision variables, writes the objective and every constraint with units and directions, explains each assumption and lays out a clean spreadsheet with inputs, decisions and constraints separated for Solver. Your first QSO 320 formulation is free, back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 320 papers and related BS Business Administration samples
- QSO 320 Module 1 Discussion: What a Prescriptive Model Can Do for a Tree Farm
- QSO 320 Module 3 Project One: Solving the November Mix With Sensitivity Analysis
- QSO 320 Module 4 Discussion: Should We Believe 1,050 Coils of Garland?
- QSO 320 Module 5 Transportation Model Assignment: Shipping From Three Farms to Eight Lots
- QSO 320 Module 6 Discussion: The Flaw of Planning on Average Weekends
- QSO 320 Module 7 Project Two: Simulating the Choose-and-Cut Season
- QSO 320 Module 8 Discussion: Checking the Model Before the Owner Uses It
- FIN 320 Module 8 Final Project Financial Analysis Report: Financial analysis report for the board
- INT 113 Module 6 Currency and Payment Assignment: Yen or Dollars on the Invoice
- OL 328 Module 7 Final Project: Leadership Development Plan
- SPT 111 Module 1 Discussion: Why a Youth Complex Is a Sport Business
QSO 320 Module 2 questions, answered
Where can I find a free QSO 320 Module 2 Model Formulation Assignment sample?
The complete QSO 320 Module 2 assignment is on this page: an invented tree farm's product mix formulated as a linear program with a Solver-ready spreadsheet layout.
How do you formulate a linear programming model?
Define decision variables with units, write the objective as a linear function of them, write each limit as a linear constraint with correct direction and state the model's assumptions.
What are the assumptions of linear programming?
Proportionality and additivity (contributions and resource use scale linearly), divisibility (variables can take fractional values) and certainty (coefficients are known).
How should a spreadsheet model be laid out for Solver?
Keep inputs, decision cells, calculations, the objective and constraint comparisons in separate, labeled areas, and refer to input cells in formulas rather than typing numbers.
What is a by-product constraint?
A constraint in which producing one item creates supply for another, such as trimmed boughs from harvested trees adding to the boughs available for wreaths.