QSO 320 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This QSO 320 Module 1 Discussion sample explains prescriptive analytics and the parts of a decision model through one business decision. SNHU QSO 320 (QSO-320) opens its BS Business Administration course on management science through spreadsheets with this question of what models are for. The business is Grayson Hollow Fir Farm, an invented Christmas tree grower in the North Carolina mountains whose owner plans each November's harvest by rule of thumb. The post shows how the same decision becomes a model with decision variables, an objective and constraints for crews, trucks and boughs, and draws on the origins of linear programming, the design of the Excel Solver and evidence that people choose quantities poorly without models.

CourseQSO 320 Management Science through Spreadsheets
ModuleModule 1
Paper typeundergraduate discussion post explaining prescriptive analytics and the parts of a decision model through one business decision
LengthAbout 380 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 320 Module 1

1

Module One Discussion

Premium Trees First, Then Wreaths

My family runs Grayson Hollow Fir Farm, 520 acres of Fraser fir in Ashe County, North Carolina. Every November we cut and bale trees for eight retail lots from Charlotte to Atlanta, make wreaths and garland from the trimmed boughs and get ready for our own choose-and-cut weekends. My father plans the harvest with a rule that has worked for 30 years: cut every premium tree that is ready, fill the remaining truck space with standard trees, make as many wreaths as customers have ordered and use whatever boughs are left for garland.

What this page is doingThe farm and its rule.
2

The rule hides a real decision with four parts: how many premium trees, standard trees, wreaths and coils of garland to produce this season. Our goal is total contribution, about $38 for a premium tree, $24 for a standard tree, $11 for a wreath and $9 for a coil of garland. The limits are harvest crew hours, the baling machine, 40 truckloads of space, wreath shop hours, the supply of boughs, the trees actually ready in the field, wreath and garland orders and minimum contracts with the lots. Written that way, the decision is a linear program. Dantzig (2002), looking back on the method he developed, traced it to postwar Air Force scheduling, where many activities had to share a fixed pool of people, aircraft and supplies; our November is a small version of that.

What this page is doingThe same decision as a model.
3

A model would do three things the rule cannot. It would check every limit at once, so we would not discover in December that we ran out of boughs. It would tell us which limits actually bind; my guess is trucks, but I have never been sure. And it would put a value on more of a scarce resource, such as an extra hired truck. Fylstra et al. (1998), who designed the Solver built into Excel, wrote that it put this kind of optimization within reach of ordinary spreadsheet users, which matters for a family farm with no analyst. Schweitzer and Cachon (2000) found in experiments that people choosing order quantities with full information still deviated systematically from the best choices, so experience alone may not be enough.

What this page is doingWhat a model adds.
4

Which decision at your workplace runs on a rule of thumb, and what limit do you suspect the rule ignores?

What this page is doingYour decisions.
5

References

Dantzig, G. B. (2002). Linear programming. Operations Research, 50(1), 42-47. https://doi.org/10.1287/opre.50.1.42.17798

Fylstra, D., Lasdon, L., Watson, J., & Waren, A. (1998). Design and use of the Microsoft Excel Solver. Interfaces, 28(5), 29-55. https://doi.org/10.1287/inte.28.5.29

Schweitzer, M. E., & Cachon, G. P. (2000). Decision bias in the newsvendor problem with a known demand distribution: Experimental evidence. Management Science, 46(3), 404-420. https://doi.org/10.1287/mnsc.46.3.404.12070

What the QSO 320 Module 1 instructions ask for

QSO 320 begins with introductions and a first look at what prescriptive analytics is and how it differs from descriptive and predictive analytics, often by describing a decision at work that a model could support. Expect to identify the decision to be made, the goal, the limits that constrain the choice and the data a model would need. Strong posts choose a real, recurring decision with clear trade-offs, name the decision variables, objective and constraints in plain words and explain what the model would offer beyond current practice, such as testing what-if scenarios or valuing more capacity. Replies should help a classmate tighten a decision variable or spot a missing constraint.

How this QSO 320 Module 1 discussion example is built

The post introduces Grayson Hollow Fir Farm, a made-up 520-acre Fraser fir grower whose owner plans each November's harvest by rule: cut premium trees first, fill the trucks with standard trees and make as many wreaths as are ordered. It recasts the decision as a model with four decision variables, premium trees, standard trees, wreaths and garland; an objective of total contribution; and constraints for harvest crews, the baler, 40 truckloads, the wreath shop, bough supply, field inventory and dealer contracts. Dantzig's account of how linear programming began, the paper by Fylstra and colleagues on designing Excel Solver and the newsvendor experiments of Schweitzer and Cachon support the case, and the post asks classmates which of their decisions run on habit.

Where the QSO 320 Module 1 rubric puts the points

Credit in the opening QSO 320 thread follows a clear explanation of prescriptive analytics, a real decision described in terms of decisions, objective and constraints, a sensible view of what a model adds to current practice, sound grounding in the readings and replies that tighten a classmate's formulation. The strongest posts state the decision variables precisely, include constraints people often forget and say what a manager would learn that the rule of thumb cannot tell them. Points slip when posts stay abstract, describe a forecasting problem as if it were prescriptive, omit constraints or answer peers with greetings only. APA citations and readable prose are expected too.

QSO 320 Module 1 help: the mistakes that cost points

Pick a decision that is made repeatedly and involves trade-offs, such as how much of several products to make, how to schedule staff or how to ship goods. Write the decision as a question: how many, how much or which. Then list what you want to maximize or minimize, and every limit on the choice: hours, machines, space, budget, contracts, demand. Those are the objective and constraints. Ask what the current rule of thumb is and what it might miss, such as the value of more of a scarce resource. A common mistake is choosing a decision with no real trade-off; another is confusing a prediction, such as next month's sales, with a decision. Keep the post concrete and ask QSO 320 classmates which decisions at their workplace run on habit.

Get QSO 320 Module 1 written to your instructions

Paste the QSO 320 Module 1 prompt and describe a decision at a business you know. A writer turns it into the parts of a prescriptive model, decisions, objective and constraints, explains what a model would add to the current rule of thumb, supports the points with management science research and asks QSO 320 classmates about decisions they make by habit. The first QSO 320 post is free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 320 papers and related BS Business Administration samples

QSO 320 Module 1 questions, answered

Where can I find a free QSO 320 Module 1 Discussion sample?

This page holds the full QSO 320 Module 1 post: an invented Christmas tree farm's harvest decision recast as a prescriptive model with variables, objective and constraints.

What is prescriptive analytics?

Analytics that recommends a decision, usually by building a model of choices, goals and limits and finding the best feasible choice, as linear programming does.

What are the parts of an optimization model?

Decision variables (what you choose), an objective function (what you maximize or minimize) and constraints (the limits the choice must respect).

Why use a model instead of a rule of thumb?

A model checks all limits at once, finds better combinations, shows which resources are binding and tells you what more of a scarce resource is worth.

Do people make good quantity decisions without models?

Experiments show that even when people know demand and costs, their quantity choices systematically depart from the best ones.