QSO 320 Module 3 Project One Example

Reviewed by Portia Lambrick, MBA

This QSO 320 Module 3 Project One sample solves a linear programming model with Excel Solver and interprets the solution and sensitivity report to make a business recommendation. SNHU QSO 320 (QSO-320) places this solve-and-interpret project in Module 3 of its BS Business Administration management science course. The business is Grayson Hollow Fir Farm, an invented Fraser fir grower. The model recommends 14,000 premium and 12,500 standard trees, 18,000 wreaths and 1,050 coils of garland for about $1.04 million in contribution. The sensitivity report shows that truck space is the binding bottleneck, worth $35.63 a slot, which makes hiring four extra truckloads worth roughly $66,000 after their cost.

CourseQSO 320 Management Science through Spreadsheets
ModuleModule 3
Paper typeundergraduate project solving a linear programming model with Excel Solver and interpreting the solution and sensitivity report for a business recommendation
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 320 Module 3

1

Trucks, Not Trees: Solving and Interpreting Grayson Hollow's November Product Mix

[Student Name]

Southern New Hampshire University

QSO 320: Management Science through Spreadsheets

Project One: Optimization Model and Sensitivity Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe model, its solution and every shadow price for Grayson Hollow Fir Farm in this QSO 320 project are fictional.
2

Trucks, Not Trees: Solving and Interpreting Grayson Hollow's November Product Mix

Introduction

Module 2 formulated Grayson Hollow Fir Farm's November product mix as a linear program with four decision variables and eleven constraints. This project solves the model with Excel Solver, reports and interprets the optimal plan, analyzes the sensitivity report and tests the questions the owner is most likely to ask: what limits the farm's contribution, whether more trucks or boughs would pay and how much prices could change before the plan should change. It closes with a recommendation.

What this page is doingStates the purpose of the project.
3

The Optimal Plan

Solver, using the simplex method for linear problems, found the following optimal plan.

Optimal November plan (invented data)

ProductQuantityContribution per unitTotal contribution
Premium trees14,000$38$532,000
Standard trees12,500$24$300,000
Wreaths18,000$11$198,000
Garland coils1,050$9$9,450
Total$1,039,450

The plan cuts every premium tree that is ready, fills the rest of the truck space with standard trees, makes every wreath that has been ordered and uses the remaining boughs for a small amount of garland. It is close to the owner's rule of thumb, which is reassuring, but the model shows why the rule works and where it leaves money on the table.

What this page is doingReports the solution.
4

Binding and Nonbinding Constraints

Four constraints bind. Truck slots are fully used: 14,000 premium trees use 14,000 slots and 12,500 standard trees use 10,000. All 14,000 ready premium trees are cut. The bough supply is exhausted, since wreaths and garland use 113,250 pounds, exactly the 40,000 bought plus 73,250 from trimmings. And wreath production meets the 18,000 orders.

Several resources have slack. The harvest crews use 6,950 of 9,600 hours, leaving 2,650 unused. The balers have 575 hours to spare. The wreath shop has 637.5 hours left. Some 13,500 standard trees remain in the field, garland orders exceed production by 6,950 coils and both contract minimums are comfortably exceeded. Dantzig (2002) emphasized that a linear program's value lies as much in revealing which limits matter as in the answer itself; here the model shows that trucks, not trees or labor, cap the farm's wholesale business.

What this page is doingExplains what limits the plan.
5

Shadow Prices

Shadow prices of binding constraints and their approximate valid ranges

ConstraintShadow priceApproximate allowable increase
Truck slots$35.63 per slotAbout 2,400 slots at full value, declining slowly beyond
Premium trees ready$7.78 per treeAbout 1,200 trees
Bough supply$1.80 per poundWell beyond 10,000 pounds
Wreath orders$0.20 per wreathSmall

Each truck slot is worth $35.63 in contribution. That value has two parts: an extra slot carries 1.25 more standard trees, worth $30, and their trimmings yield more boughs for garland, worth about $5.63. The premium tree shadow price of $7.78 is small, because each additional premium tree displaces 1.25 standard trees in the trucks; the farm gains only the difference. A pound of boughs is worth $1.80, so buying more boughs from neighbors pays if they cost less than that. Additional wreath orders add almost nothing at the margin, because boughs, not orders, limit wreath and garland output together.

Fylstra et al. (1998) noted that sensitivity information is among Solver's most useful features and also among the most misread, particularly when users apply it beyond its valid range. Re-solving the model with more truck slots confirms the range: each additional 600-slot truckload adds $21,375 up to about four loads, after which the value per slot falls slightly as the model starts making more garland instead of wreaths.

What this page is doingValues the scarce resources.
6

Objective Coefficient Ranges

The plan stays the same as long as the premium tree margin stays above about $30.75 and the standard tree margin stays below about $31. Below $30.75, it becomes better to fill trucks with standard trees, since 1.25 standard trees per slot would earn more than one premium tree. This range is wide enough that normal price swings of a few dollars will not change the plan. Wagner (1995) argued for global sensitivity analysis, testing many parameters changing together rather than one at a time, and a simple version was run by changing crew productivity, bough yield and margins by 10 percent in combination; the plan changed only when the premium margin and truck capacity were both cut sharply.

What this page is doingTests how robust the plan is to prices.
7

What-If Analysis

Could the farm save by cutting the seasonal crew? The 2,650 spare hours equal about sixteen workers for the whole season. Hiring that many fewer would not change the plan and would save roughly $45,000 in wages, or the farm could keep them and move them to choose-and-cut weekends.

Should the farm hire more trucks? A hired truckload costs about $4,800. Four more loads add 2,400 slots worth $85,500 in contribution at the shadow price, for $19,200, a gain of about $66,300.

Should the farm buy more boughs? At $1.80 a pound of value, buying 10,000 more pounds at the going rate of $0.90 would add about $9,000 net, in garland that customers have already ordered.

What this page is doingAnswers the owner's questions.
8

Checking the Solution

Before trusting the answer, the solution was checked in three ways. First, every constraint row was recalculated by hand for the optimal plan to confirm that used amounts match the reported values; the bough row, for example, is 6 × 18,000 + 5 × 1,050 = 113,250 pounds against 40,000 + 3 × 14,000 + 2.5 × 12,500 = 113,250. Second, the model was re-solved from a different starting point, all decision cells set to zero and then to the owner's rule-of-thumb plan, and Solver returned the same answer both times, as expected for a linear program. Third, last season's actual quantities were entered as a test: the model's contribution for them came within about 1 percent of what the farm's books recorded, which suggests the margins and resource coefficients describe the farm's reality closely. The owner's rule of thumb turns out to be nearly optimal for the resources he had; the real gains come from changing those resources, which only the sensitivity report reveals.

What this page is doingVerifies the answer before relying on it.
9

Recommendation

The farm should follow the optimal plan, hire four additional truckloads for the season, buy about 10,000 more pounds of boughs and reassign spare crew hours to choose-and-cut weekends rather than adding workers. Together these steps raise contribution by roughly $75,000 over the plan without them.

What this page is doingStates the decision and its value.
10

Limitations

The model assumes constant margins and productivity and treats the season as one period, although trucks and crews are scheduled week by week. It ignores choose-and-cut demand, which competes for premium trees; Project Two will address that with simulation.

What this page is doingNotes what the model leaves out.
11

References

Dantzig, G. B. (2002). Linear programming. Operations Research, 50(1), 42-47. https://doi.org/10.1287/opre.50.1.42.17798

Fylstra, D., Lasdon, L., Watson, J., & Waren, A. (1998). Design and use of the Microsoft Excel Solver. Interfaces, 28(5), 29-55. https://doi.org/10.1287/inte.28.5.29

Wagner, H. M. (1995). Global sensitivity analysis. Operations Research, 43(6), 948-969. https://doi.org/10.1287/opre.43.6.948

What the QSO 320 Module 3 instructions ask for

QSO 320 Project One typically asks students to build and solve an optimization model for a business problem in Excel Solver and to interpret the results. Expect to present the model, report the optimal values of the decision variables and the objective, identify binding and nonbinding constraints, interpret the sensitivity report, including shadow prices and their allowable ranges and the ranges over which objective coefficients can change, and use the results to recommend a decision. Many versions ask for what-if scenarios. Strong projects explain what each number means for the business, use shadow prices only within their valid ranges, test the scenarios a manager would actually ask about and state the limits of the model.

How this QSO 320 Module 3 project one example is built

The project solves the linear program formulated in Module 2 for Grayson Hollow Fir Farm, a fictional tree grower. Solver's optimal plan ships 14,000 premium and 12,500 standard trees and makes 18,000 wreaths and 1,050 coils of garland, for $1,039,450 in contribution. Truck slots, ready premium trees, the bough supply and wreath orders bind, while 2,650 crew hours and 575 baler hours go unused. Shadow prices value a truck slot at $35.63 over a range of about 2,400 slots, a pound of boughs at $1.80 and a premium tree at $7.78, so four hired truckloads at $4,800 each would add about $66,000. Fylstra and colleagues on Solver, Wagner on global sensitivity analysis and Dantzig frame the interpretation.

Where the QSO 320 Module 3 rubric puts the points

Instructors assessing QSO 320 Project One look at whether the model is correctly built and solved, the optimal plan and objective are reported accurately, binding and slack constraints are identified and explained, the sensitivity report is interpreted correctly within its valid ranges, relevant what-if questions are tested and the recommendation follows from the analysis. Projects that score highest translate shadow prices into decisions, such as whether to buy more of a resource at a given price, and are honest about assumptions. Credit falls when Solver output is pasted without explanation, shadow prices are used outside their ranges, slack is misread or recommendations ignore costs. Clear tables and APA citations complete the rubric.

QSO 320 Module 3 help: the mistakes that cost points

After solving, write down the plan in business terms: what to make, how much and what it earns. Then go through each constraint and say whether it binds. A binding constraint is a bottleneck; slack means spare capacity. Read the shadow price of each binding constraint as the value of one more unit of that resource, and check its allowable increase before using it for a large change. Read the ranges on objective coefficients to see how much a margin could change before the plan changes. Test the what-ifs a manager would ask, such as buying more of a resource, by changing the input and re-solving. A common mistake is reporting a shadow price without its range; another is recommending more of a resource whose shadow price is zero. End with a clear recommendation and its value.

Get QSO 320 Module 3 written to your instructions

Upload the QSO 320 Project One guidelines with your model or formulation. A writer solves it in Solver, reports the optimal plan and which constraints bind, reads the sensitivity report correctly, including shadow prices and their valid ranges, tests key what-if questions and turns the results into a recommendation. We draft your opening QSO 320 project free of charge, usually within forty-eight hours. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 320 papers and related BS Business Administration samples

QSO 320 Module 3 questions, answered

Where can I find a free QSO 320 Module 3 Project One sample?

This page holds the whole QSO 320 Project One: an invented tree farm's product mix solved in Solver, with binding constraints and shadow prices interpreted.

What is a shadow price?

The change in the optimal objective value for a one-unit increase in a constraint's right-hand side, valid only within that constraint's allowable increase and decrease.

What does a binding constraint mean?

The resource is fully used in the optimal plan, so it limits the objective; more of it would improve the result, as its shadow price shows.

What is the allowable increase in a sensitivity report?

The amount a constraint's limit can rise before its shadow price changes; beyond that range the shadow price is no longer reliable and the model should be re-solved.

What is the range of optimality?

The range over which an objective coefficient, such as a product's margin, can change without changing the optimal values of the decision variables.