QSO 320 Module 5 Transportation Model Assignment Example

Reviewed by Portia Lambrick, MBA

This QSO 320 Module 5 Transportation Model Assignment sample formulates and solves a transportation model in a spreadsheet and compares the optimal plan with current practice. SNHU QSO 320 (QSO-320) assigns network models in Module 5 of its BS Business Administration management science course. Grayson Hollow Fir Farm, an invented Christmas tree grower, ships its own trees and those of two partner farms to eight retail lots across four states. The model has 24 shipment variables, supply and demand constraints and a cost per tree for each route; its optimal plan costs about $8,700 less than the current routing, and the paper explains the dual values and tests a scenario in which one lot closes.

CourseQSO 320 Management Science through Spreadsheets
ModuleModule 5
Paper typeundergraduate assignment formulating and solving a transportation model in a spreadsheet and comparing the optimal plan with current practice
LengthAbout 1,090 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 320 Module 5

1

Three Farms, Eight Lots: A Transportation Model for Grayson Hollow's Wholesale Season

[Student Name]

Southern New Hampshire University

QSO 320: Management Science through Spreadsheets

Transportation Model Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe farms, lots, shipping costs and savings in this QSO 320 assignment are made up.
2

Three Farms, Eight Lots: A Transportation Model for Grayson Hollow's Wholesale Season

Introduction

After the November product mix is set, Grayson Hollow Fir Farm must decide how to ship trees to its eight wholesale lots. It ships its own 26,500 trees and resells trees from two partner farms that lack their own lot contracts: 6,000 from Piney Creek, northeast of the farm near the Virginia line, and 4,000 from Helton, to the west near Tennessee. Routing has always followed relationships: Piney Creek's trees go to the Atlanta lot whose owner first bought from them, and Helton's go to Raleigh. This assignment builds a transportation model to find the lowest-cost shipping plan and compares it with current practice. Hitchcock (1941) first stated this problem in a form close to the one used here: a handful of origins each holding a set amount, many receiving points each needing a set amount and a freight charge for every pairing.

What this page is doingStates the shipping problem.
3

Sources, Destinations and Costs

Supply is 26,500 trees at Grayson Hollow, 6,000 at Piney Creek and 4,000 at Helton, a total of 36,500. Demand at the eight lots is 5,200 at Charlotte North, 4,800 at Charlotte South, 6,500 at Raleigh, 3,800 at Greensboro, 5,000 at Atlanta Buckhead, 4,200 at Atlanta Marietta, 3,000 at Columbia and 4,000 at Knoxville, also 36,500, so supply and demand balance. Costs per tree come from the hauler's 2025 rate card, divided by trees per load.

Shipping cost per tree by route (invented)

From \ ToCharlotte NCharlotte SRaleighGreensboroAtlanta BAtlanta MColumbiaKnoxville
Grayson Hollow$2.10$2.20$3.10$2.40$4.60$4.40$3.30$2.90
Piney Creek$2.40$2.50$2.70$2.00$5.00$4.80$3.60$3.40
Helton$2.50$2.50$3.50$2.90$4.10$3.90$3.40$2.30
What this page is doingSets out the data.
4

Formulation

The model has 24 decision variables, one for the number of trees shipped on each route from source i to lot j. The objective minimizes total freight, adding up every route's per-tree charge multiplied by the trees it carries. Three supply constraints require that the total shipped from each farm equal its supply, and eight demand constraints require that each lot receive exactly its demand. All shipments are non-negative. Because supply and demand balance, all constraints are equalities.

What this page is doingDefines variables and constraints.
5

Spreadsheet and Solution

The spreadsheet places the cost grid above a matching grid of shipment cells, with row totals compared with supply and column totals with demand, and one SUMPRODUCT for total cost. Fylstra et al. (1998) described Solver's simplex engine as well suited to linear models of this kind, and it solved the model in under a second.

Optimal shipping plan (trees)

From \ ToCharlotte NCharlotte SRaleighGreensboroAtlanta BAtlanta MColumbiaKnoxville
Grayson Hollow5,2004,8005003,8005,0004,2003,0000
Piney Creek006,00000000
Helton00000004,000

The optimal plan costs $108,930. The current routing, with Piney Creek supplying Atlanta Buckhead and part of Columbia, Helton supplying Raleigh and Grayson Hollow covering the rest, costs $117,630. The model saves $8,700, about 7 percent.

What this page is doingDescribes the build and the answer.
6

Why the Routes Change

The current routing crosses paths. Piney Creek, near the Virginia line, sends trees more than 300 miles south to Atlanta, while Helton, near Tennessee, sends trees east to Raleigh. The model reverses both: Piney Creek's trees go to Raleigh, its cheapest destination after Greensboro, and Helton's go to Knoxville, just across the state line. Grayson Hollow, closest to Charlotte and Atlanta, covers those lots and most of the rest. Charnes and Cooper (1954) explained transportation solutions by tracing how shifting one unit around a loop of routes changes cost, and the reversal here is such a loop: moving a tree from the Piney Creek to Atlanta route to the Grayson Hollow to Atlanta route, and a Grayson Hollow tree to Raleigh from Piney Creek, saves money at both ends.

What this page is doingInterprets the plan.
7

Dual Values

The dual values show that an extra tree available at Piney Creek would save $0.40 and one at Helton $0.50 compared with shipping the same tree from Grayson Hollow, because the partners sit closer to Raleigh and Knoxville. If the farm can buy more partner trees at no premium, Helton's are the more valuable. The lot duals show the marginal cost of serving one more tree at each lot, from $2.10 at Charlotte North to $4.60 at Atlanta Buckhead, which suggests that Atlanta contracts should carry a higher delivered price.

What this page is doingExplains where capacity is worth most.
8

Checking the Model

Three checks were made before the plan was shared. Every row total in the shipment grid was compared with its farm's supply and every column total with its lot's demand, and all matched. The current routing was entered into the shipment cells by hand, and the model reproduced the hauler's 2025 invoices to within $300, confirming that the per-tree costs are realistic. Finally, the model was re-solved with every cost raised by ten cents, which should raise total cost by exactly $3,650 without changing the routes, and it did. These checks take minutes and catch the most common errors in spreadsheet models, such as a sum that misses a row or a cost entered in the wrong cell.

What this page is doingConfirms the spreadsheet does what it should.
9

Practical Limits of the Plan

The model treats every tree the same, but lots order a mix of premium and standard trees, and a premium tree takes more space than a standard one. It also assumes shipments can be split freely, while the hauler charges by the truckload, so a route carrying 500 trees, like Grayson Hollow to Raleigh in the optimal plan, would ride on a partial load or be combined with Piney Creek's Raleigh shipment. A fuller model would add truck counts as integer variables and keep premium and standard trees separate. For a first season, though, the simpler model points clearly to the two route changes that matter.

What this page is doingNotes what the model ignores.
10

What-If: A Closed Lot

The Knoxville lot's lease is up for renewal, and its operator may close. Re-solving with Knoxville demand set to zero and supply constraints relaxed to less-than-or-equal, the model sends Helton's 4,000 trees to Atlanta Marietta, where they undercut Grayson Hollow by $0.50 a tree, and leaves about 4,000 of Grayson Hollow's own trees without a buyer; shipping cost falls, but the farm would need a new outlet for those trees. The model makes clear that losing Knoxville would hurt Helton's partnership most, since its trees have no other cheap destination.

What this page is doingTests a realistic change.
11

Conclusion

The farm should adopt the optimal routing, explaining to the Atlanta lot owner that its trees will now come from Grayson Hollow, and should consider buying more of Helton's trees while the Knoxville lot remains open.

What this page is doingStates the recommendation.
12

References

Charnes, A., & Cooper, W. W. (1954). The stepping stone method of explaining linear programming calculations in transportation problems. Management Science, 1(1), 49-69. https://doi.org/10.1287/mnsc.1.1.49

Fylstra, D., Lasdon, L., Watson, J., & Waren, A. (1998). Design and use of the Microsoft Excel Solver. Interfaces, 28(5), 29-55. https://doi.org/10.1287/inte.28.5.29

Hitchcock, F. L. (1941). The distribution of a product from several sources to numerous localities. Journal of Mathematics and Physics, 20(1-4), 224-230. https://doi.org/10.1002/sapm1941201224

What the QSO 320 Module 5 instructions ask for

The Module 5 assignment in QSO 320 typically asks students to model a distribution or network problem, often a transportation problem in which goods move from several sources to several destinations at different costs per unit. Expect to define the shipment variables, write supply and demand constraints, set up the cost matrix in a spreadsheet, solve with Solver, interpret the shipping plan and compare it with an alternative such as current practice. Many versions ask for sensitivity or a what-if scenario. Strong submissions explain why the optimal routes differ from intuition, check that supply and demand balance or handle the imbalance explicitly, use the dual information to say which sources or destinations are most valuable and keep the spreadsheet layout simple and traceable.

How this QSO 320 Module 5 transportation model assignment example is built

The assignment models wholesale shipping for Grayson Hollow Fir Farm, a fictional grower that ships 26,500 of its own trees and resells 6,000 from Piney Creek and 4,000 from Helton, two partner farms, to eight lots in Charlotte, Raleigh, Greensboro, Atlanta, Columbia and Knoxville. Twenty-four variables represent trees on each route, with supply and demand constraints and costs from $2.00 to $5.00 per tree. The optimal plan costs $108,930, against $117,630 for the current routing, which sends Piney Creek's trees to Atlanta and Helton's to Raleigh out of habit. Hitchcock's original statement of the transportation problem, Charnes and Cooper's stepping stone method and the Fylstra team's account of Solver frame the work, and a closed Knoxville lot is tested.

Where the QSO 320 Module 5 rubric puts the points

The QSO 320 transportation assignment is generally scored on correct variables and constraints, an accurate cost matrix, a well-organized spreadsheet, a correctly solved model, clear interpretation of the shipping plan and its savings, use of dual or sensitivity information and a sensible what-if analysis. Submissions that earn top marks explain why the optimal routes differ from current practice and what each dual value means for the business. Credit falls when supply and demand do not balance and the model does not account for it, when routes are reported without interpretation, when savings are calculated against the wrong baseline or when the spreadsheet hides its logic. APA citations and organization complete the rubric.

QSO 320 Module 5 help: the mistakes that cost points

List every source with its supply and every destination with its demand, and add them up. If supply exceeds demand, the constraints for sources should be less-than-or-equal; if they balance, both can be equalities. Build the cost matrix with sources in rows and destinations in columns, and a matching grid of decision cells for the shipments. Use row sums for supply constraints and column sums for demand constraints, and one SUMPRODUCT for total cost. After solving, compare the plan route by route with current practice and explain each change. A common mistake is a model in which demand cannot be met because a constraint direction is reversed; another is ignoring what the dual values say about where an extra unit of supply would be worth most.

Get QSO 320 Module 5 written to your instructions

Send the QSO 320 Module 5 instructions and your sources, destinations and costs. A writer formulates the transportation or network model, builds it in a clean spreadsheet, solves it in Solver, compares the plan with current practice, explains the dual values and tests a realistic what-if. Your first QSO 320 Module 5 assignment is free, usually two days out. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 320 papers and related BS Business Administration samples

QSO 320 Module 5 questions, answered

Where can I find a free QSO 320 Module 5 Transportation Model Assignment sample?

The complete QSO 320 Module 5 assignment is on this page: an invented tree farm's shipments from three farms to eight lots, modeled and solved in Solver.

What is a transportation problem?

A linear program that finds the lowest-cost way to ship goods from several sources with limited supply to several destinations with required demand, given a cost per unit on each route.

How do I set up a transportation model in Excel?

Put costs in a source-by-destination grid, create a matching grid of shipment cells, sum rows for supply constraints and columns for demand constraints and minimize total cost with SUMPRODUCT.

What if supply and demand are not equal?

Use less-than-or-equal constraints on the side with extra capacity, or add a dummy source or destination to absorb the difference.

What do dual values mean in a transportation model?

They show how much total cost would change with one more unit of supply at a source or one more unit of demand at a destination, which tells managers where capacity is most valuable.