Free sample paper for QSO 320 Module 6
Module Six Discussion
Four Average Weekends That Never Happen
Every December, Grayson Hollow Fir Farm opens for four choose-and-cut weekends, when families walk the fields, pick a tree and have it cut and baled. Most want premium Fraser firs, seven to eight feet tall. Each fall my father reserves about 1,800 premium trees for these weekends, based on what he thinks a normal season looks like, and the rest go to the wholesale lots. Most years, by the third weekend, the premium rows are picked over and families settle for a smaller tree or drive away.
Over the last six seasons, weekend sales ranged from about 300 trees on a cold rainy Saturday to about 800 on a dry, bright one, with an average near 660, or roughly 2,600 for a season. The reserve of 1,800 is below even that average, but planning on the average would also be a mistake. Running short of a premium tree costs us about $41, because some families buy a smaller tree at a lower margin and others leave, while an unsold premium tree costs only about $12, since it can stay in the ground and the wholesale trucks were full anyway. When shortages cost more than leftovers, the best reserve sits above the average. In the laboratory sessions run by Schweitzer and Cachon (2000), participants setting such quantities, even with the demand distribution in front of them, ordered too few of high-profit items and too many of low-profit ones, which describes my father's reserve exactly.
Fisher and Raman (1996), working with a skiwear maker, showed that modeling demand uncertainty explicitly and responding to early sales sharply reduced the costs of stockouts and leftover inventory. A Monte Carlo model for the farm would draw the weather for each of four weekends, draw the number of buyers given the weather, add them up and compare the total with each possible reserve, thousands of times. Kleijnen (2005) recommends designed experiments with simulation, varying inputs systematically rather than one at a time, so I would also test how the answer changes if bad-weather weekends become more common.
Which plan at your workplace rests on an average, and what does it cost when reality comes in above or below it?
References
Fisher, M., & Raman, A. (1996). Reducing the cost of demand uncertainty through accurate response to early sales. Operations Research, 44(1), 87-99. https://doi.org/10.1287/opre.44.1.87
Kleijnen, J. P. C. (2005). An overview of the design and analysis of simulation experiments for sensitivity analysis. European Journal of Operational Research, 164(2), 287-300. https://doi.org/10.1016/j.ejor.2004.02.005
Schweitzer, M. E., & Cachon, G. P. (2000). Decision bias in the newsvendor problem with a known demand distribution: Experimental evidence. Management Science, 46(3), 404-420. https://doi.org/10.1287/mnsc.46.3.404.12070
What the QSO 320 Module 6 instructions ask for
The QSO 320 Module 6 discussion typically asks students to consider decisions under uncertainty, why using single average values in a model can lead to poor decisions and how simulation can represent uncertain inputs. Students usually apply the idea to a business decision they know. Strong posts show, with numbers if possible, how variation in an input affects the outcome, explain why the costs of having too much and too little often differ and describe how a simulation would sample uncertain inputs many times to produce a distribution of outcomes. They draw on research about uncertainty and decision bias. Replies often ask which inputs a classmate would treat as uncertain and what distribution they would use.
How this QSO 320 Module 6 discussion example is built
The post explains a recurring problem at Grayson Hollow Fir Farm, a made-up tree grower. The farm reserves about 1,800 premium trees for four choose-and-cut weekends, roughly matching its sense of an average season, yet runs out of premium trees most years. Weekend demand depends on weather: a dry, cold weekend brings about 780 tree buyers and a rainy one about 300. A missing premium tree costs about $41 in lost or downgraded sales, while an unsold one costs about $12, so the right reserve sits well above the average. Fisher and Raman's quick-response skiwear study, the newsvendor experiments by Schweitzer and Cachon and Kleijnen's overview of simulation experiments support a Monte Carlo model for Project Two.
Where the QSO 320 Module 6 rubric puts the points
The QSO 320 uncertainty discussion is usually assessed on a clear account of why average-based plans mislead, a specific example with the sources of variation identified, recognition of unequal costs of over- and under-supply, a sound description of how simulation would work, accurate use of research and replies that probe a classmate's inputs. Posts that score well quantify the variation and the costs and say what decision would change. Points drop when posts describe uncertainty in general terms, treat simulation as a black box, ignore cost asymmetry or reply with praise only. Proper citations and plain prose are expected in this QSO 320 module as well.
QSO 320 Module 6 help: the mistakes that cost points
Pick a plan that depends on an uncertain input, such as demand, travel time or yield. Write down the average the plan uses and the range the input actually takes, and if possible the reasons it varies, such as weather or seasons. Then ask what happens when the input is above or below average and what each outcome costs. If running short costs more than having extra, the best plan is above the average, and the reverse if extra costs more. A simulation repeats the uncertain inputs thousands of times to show the spread of outcomes for each plan. A common mistake is assuming the average input gives the average outcome; another is choosing a distribution without data. Describe the simulation you would build and ask classmates which plans at their workplace rest on an average.
Get QSO 320 Module 6 written to your instructions
Post the QSO 320 Module 6 prompt and a plan you know that relies on an average. A writer shows how variation and unequal costs make the average plan go wrong, explains the idea behind simulation with research on decisions under uncertainty, sketches a Monte Carlo model for the case and asks QSO 320 classmates which of their plans rests on an average. Your first QSO 320 Module 6 post is free, about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 320 papers and related BS Business Administration samples
- QSO 320 Module 1 Discussion: What a Prescriptive Model Can Do for a Tree Farm
- QSO 320 Module 2 Model Formulation Assignment: Trees, Wreaths and Garland in Symbols
- QSO 320 Module 3 Project One: Solving the November Mix With Sensitivity Analysis
- QSO 320 Module 4 Discussion: Should We Believe 1,050 Coils of Garland?
- QSO 320 Module 5 Transportation Model Assignment: Shipping From Three Farms to Eight Lots
- QSO 320 Module 7 Project Two: Simulating the Choose-and-Cut Season
- QSO 320 Module 8 Discussion: Checking the Model Before the Owner Uses It
- ACC 315 Module 4 Project One: Evaluating the Current System
- ACC 317 Module 4 Project One: Five Steps for a Resort Contract Under ASC 606
- SPT 333 Module 1 Discussion: Friday Nights in a Mill Town
- SPT 208 Module 1 Discussion: Why a Race Is Not a Jacket
QSO 320 Module 6 questions, answered
Where can I find a free QSO 320 Module 6 Discussion sample?
The full QSO 320 Module 6 post is on this page: an invented tree farm that plans choose-and-cut stock on average weekends and keeps running short.
What is the flaw of averages?
The error of planning with average input values, which can produce plans that perform worse than the average suggests when inputs vary and outcomes depend on them unevenly.
What is Monte Carlo simulation?
A method that repeatedly samples uncertain inputs from probability distributions, runs the model for each sample and summarizes the resulting distribution of outcomes.
Why should the plan differ from the average forecast?
Because the costs of having too much and too little usually differ; when a shortage costs more than a leftover, the best quantity is above the average.
How many simulation trials are enough?
Enough that the summary results stop changing meaningfully when more trials are added; for spreadsheet models, several thousand trials is common.