QSO 320 Module 7 Project Two Example

Reviewed by Portia Lambrick, MBA

This QSO 320 Module 7 Project Two sample builds a Monte Carlo simulation in a spreadsheet to recommend a decision under uncertainty, with validation and sensitivity analysis. SNHU QSO 320 (QSO-320) closes its BS Business Administration management science course with this project in Module 7. Grayson Hollow Fir Farm, an invented Christmas tree grower, must decide how many premium trees to hold back from wholesale for four weather-dependent choose-and-cut weekends. Ten thousand simulated seasons show that the best reserve is about 2,950 trees, far above the 1,800 now held, cutting the expected cost of shortages and leftovers by about $28,000 a year, a result that holds across the scenarios tested.

CourseQSO 320 Management Science through Spreadsheets
ModuleModule 7
Paper typeundergraduate project building a Monte Carlo simulation in a spreadsheet to recommend a decision under uncertainty, with validation and sensitivity analysis
LengthAbout 1,120 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for QSO 320 Module 7

1

How Many Firs to Hold Back: A Simulation of Grayson Hollow's Choose-and-Cut Season

[Student Name]

Southern New Hampshire University

QSO 320: Management Science through Spreadsheets

Project Two: Simulation Study and Recommendation

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe weather probabilities, demand figures and costs in this QSO 320 simulation are invented.
2

How Many Firs to Hold Back: A Simulation of Grayson Hollow's Choose-and-Cut Season

Introduction

Grayson Hollow Fir Farm opens its fields for choose-and-cut sales on the four weekends after Thanksgiving. Families want premium Fraser firs, and each fall the owner reserves about 1,800 premium trees for them, sending the rest to wholesale lots. Module 6 explained why that reserve, based on a sense of an average season, leads to frequent shortages. This project builds a Monte Carlo simulation to find the reserve that minimizes the expected cost of having too few or too many premium trees, tests it against the farm's history and checks how sensitive the answer is to the assumptions.

What this page is doingStates the decision.
3

The Uncertain Inputs

Demand depends mainly on weather. Six seasons of sales records, 24 weekends in all, were matched with weather logs and sorted into three weekend types. Good weekends, dry with temperatures that feel like the season, occurred on 13 of 24 weekends and averaged about 780 premium-tree sales. Fair weekends, cloudy or windy, occurred on 7 and averaged about 620. Bad weekends, with steady rain or icy roads, occurred on 4 and averaged about 300. These frequencies were rounded to probabilities of 0.55, 0.30 and 0.15. Within each type, sales varied by about 18 percent of the type's average, so demand on a weekend is drawn from a normal distribution with that mean and a standard deviation of 18 percent of it, truncated at zero. Weekends are drawn independently, since the records show no pattern from one weekend to the next.

What this page is doingDescribes and justifies the distributions.
4

The Costs of Each Error

A shortage occurs when a family wants a premium tree and none is left. About 70 percent of such families buy a standard tree instead, at a margin about $24 lower, and 30 percent leave without buying, losing the full $82 choose-and-cut margin. The expected cost of a shortage is therefore 0.70 × $24 + 0.30 × $82 = $41.40. A leftover occurs when a reserved premium tree goes unsold. That tree could have been shipped wholesale, but Project One showed that trucks, not premium trees, bind the wholesale plan; the shadow price of one more ready premium tree was only $7.78, because it would displace standard trees in the trucks. Adding about $4 for the cost of keeping the tree another year, the leftover cost is about $12.

What this page is doingSets the shortage and leftover costs.
5

Model Logic

Each row of the spreadsheet is one simulated season. Four cells draw the weather for each weekend from the three types using a random number and a lookup table; four more draw demand for each weekend from the matching normal distribution; a ninth cell adds the four. For each reserve level from 1,800 to 3,300 in steps of 50, the row calculates shortages, the demand above the reserve, and leftovers, the reserve above demand, and their combined cost. The model ran 10,000 seasons. Kleijnen (2005) recommends planning simulation experiments deliberately, including enough replications that results are stable; the expected cost at the best reserve changed by less than $100 between runs of 5,000 and 10,000 trials, so 10,000 is sufficient.

What this page is doingExplains one trial and the trial count.
6

Verification and Validation

Sargent (2013) distinguishes verification, confirming that the model is built as intended, from validation, confirming that it represents the real system closely enough for its purpose. For verification, the shortage and leftover formulas were checked by hand for ten rows, and the share of simulated weekends of each type was confirmed to be 55, 30 and 15 percent. For validation, the simulated distribution of season demand was compared with the six actual seasons, which ranged from about 2,180 to 3,050 premium sales. The simulation's mean of about 2,640, with a middle 90 percent from about 1,940 to 3,310, covers the actual range well, and four of the six actual seasons fall inside its middle half.

What this page is doingChecks the model.
7

Results

Simulated results for selected premium-tree reserves (10,000 seasons)

ReserveExpected costChance of a shortageAverage shortageAverage leftover
1,800 (current)$35,01897 percent845 trees4 trees
2,200$20,05786 percent475 trees34 trees
2,500$11,55664 percent248 trees108 trees
2,700$8,06646 percent138 trees197 trees
2,950$6,53123 percent53 trees362 trees
3,100$6,89114 percent26 trees485 trees
3,300$8,3315 percent8 trees667 trees

The current reserve of 1,800 runs short in almost every season, by an average of 845 trees. Expected cost falls steeply as the reserve rises and reaches its lowest point at about 2,950 trees, where the farm runs short in about one season in four and by only about 53 trees on average. Above that, leftovers begin to cost more than the shortages they prevent. The curve is flat between about 2,850 and 3,050, so the exact number matters less than moving well above 1,800. The best reserve sits about 300 trees above average demand, as the cost asymmetry predicts: the ratio of shortage cost to total error cost is 41.40 / 53.40, or 0.78, so the farm should hold enough to meet demand in roughly 78 percent of seasons.

What this page is doingCompares the reserve options.
8

Sensitivity Analysis

Three assumptions were changed to see whether the recommendation holds. If bad weekends become more common, with probabilities of 0.45, 0.30 and 0.25, average demand falls to about 2,450 and the best reserve to about 2,800. If fewer families leave when premium trees run out, so that the shortage cost falls to $30, the best reserve is about 2,900. If keeping an unsold tree costs more, $20 instead of $12, the best reserve is about 2,850. In every case the best reserve stays between 2,800 and 2,950, far above the current 1,800, so the recommendation is robust.

What this page is doingTests the key assumptions.
9

Recommendation

The farm should reserve about 2,900 premium trees for choose-and-cut, a round figure within the flat part of the cost curve that also allows for wetter seasons. Compared with the current reserve, this cuts the expected cost of shortages and leftovers by about $28,000 a year. Because trucks bind the wholesale plan, the 1,100 extra reserved trees cost the wholesale business little: about $8,600 in contribution at Project One's shadow price, already reflected in the leftover cost for trees that go unsold. Schweitzer and Cachon (2000) found that people choosing quantities for profitable items tend to order too few, and Fisher and Raman (1996) showed how modeling uncertainty explicitly can sharply reduce the cost of stockouts and leftovers; the farm's reserve is a clear case of both.

What this page is doingStates the decision and its value.
10

Limitations

The model treats premium trees as interchangeable, though families also choose by shape and color. It uses six seasons of data, which is a small sample for estimating weather frequencies. And it does not model the possibility of moving trees between the choose-and-cut fields and the wholesale trucks after the first weekend, which could reduce the cost of a wrong reserve further.

What this page is doingNotes what the model leaves out.
11

References

Fisher, M., & Raman, A. (1996). Reducing the cost of demand uncertainty through accurate response to early sales. Operations Research, 44(1), 87-99. https://doi.org/10.1287/opre.44.1.87

Kleijnen, J. P. C. (2005). An overview of the design and analysis of simulation experiments for sensitivity analysis. European Journal of Operational Research, 164(2), 287-300. https://doi.org/10.1016/j.ejor.2004.02.005

Sargent, R. G. (2013). Verification and validation of simulation models. Journal of Simulation, 7(1), 12-24. https://doi.org/10.1057/jos.2012.20

Schweitzer, M. E., & Cachon, G. P. (2000). Decision bias in the newsvendor problem with a known demand distribution: Experimental evidence. Management Science, 46(3), 404-420. https://doi.org/10.1287/mnsc.46.3.404.12070

What the QSO 320 Module 7 instructions ask for

The final QSO 320 project typically asks students to use simulation, optimization or both to analyze a business decision under uncertainty and make a recommendation. Expect to describe the decision and the uncertain inputs, justify the probability distributions used, explain the model logic and the number of trials, compare decision alternatives on expected results and risk, verify and validate the model and test how sensitive the recommendation is to key assumptions. Strong projects connect the inputs to real data, report a range of outcomes rather than only an average, explain the costs of different errors and show the recommendation still holds, or how it changes, under different assumptions. Write it so the farm owner, not only the instructor, could follow it.

How this QSO 320 Module 7 project two example is built

The project models Grayson Hollow Fir Farm's premium-tree reserve for four December choose-and-cut weekends at a fictional grower. Each simulated weekend draws its weather, good with probability 0.55, fair 0.30 and bad 0.15, then draws tree buyers around 780, 620 or 300. Ten thousand seasons give a mean demand of about 2,640 trees. Each reserve from 1,800 to 3,300 is scored with a $41.40 shortage cost and a $12 leftover cost, the latter built from Project One's shadow price. The best reserve is about 2,950 trees, cutting expected cost from about $35,000 to $6,500. Kleijnen on simulation experiments, Sargent on validation, Schweitzer and Cachon on ordering bias and Fisher and Raman on demand uncertainty frame the study.

Where the QSO 320 Module 7 rubric puts the points

Grading of QSO 320 Project Two usually rests on a clearly defined decision, well-justified uncertain inputs and distributions, correct simulation logic with enough trials, a fair comparison of alternatives on expected value and risk, evidence of verification and validation, meaningful sensitivity analysis and a clear, supported recommendation. Projects that earn the highest marks tie inputs to data, explain the cost asymmetry that drives the answer, show the distribution of outcomes and test the assumptions a skeptical manager would question. Credit drops when distributions are arbitrary, trials are too few, only averages are reported, the model is never checked against reality or the recommendation ignores risk. APA style and organization complete the rubric.

QSO 320 Module 7 help: the mistakes that cost points

State the decision and its alternatives first, such as how many units to hold. Identify each uncertain input and base its distribution on data where you can, explaining any assumption. Lay out one trial in a single row of the spreadsheet, then copy it thousands of times or use a data table, and calculate the outcome for each alternative in every trial. Report the average result and the spread, such as the chance of a shortage. Check that the simulated inputs look like history before trusting the outputs. Then change the most uncertain assumptions and see whether the best choice moves. A common mistake is running a few hundred trials and treating the result as precise; another is reporting only the best average without the risk.

Get QSO 320 Module 7 written to your instructions

Upload the QSO 320 Project Two guidelines and describe the uncertain decision. A writer builds the simulation logic, chooses and justifies distributions, runs enough trials, compares decision options, checks the model against history, tests how the answer changes with key assumptions and writes a recommendation a manager could act on. The first QSO 320 Project Two is written free, typically in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More QSO 320 papers and related BS Business Administration samples

QSO 320 Module 7 questions, answered

Where can I find a free QSO 320 Module 7 Project Two sample?

This page holds the complete QSO 320 Project Two: a Monte Carlo simulation that sets an invented tree farm's premium-tree reserve for choose-and-cut weekends.

How do you build a Monte Carlo simulation in Excel?

Put one trial's logic in a row, using random number functions to draw uncertain inputs, copy the row thousands of times or use a data table and summarize the outcomes for each decision option.

How do you choose a distribution for a simulation input?

Base it on historical data where possible, choosing a form that matches the data's shape and range, and state any assumption when data are limited.

How is checking a simulation's formulas different from checking its realism?

Verification checks that the model is built as intended, such as formulas working correctly; validation checks that the model represents reality well enough for its purpose.

Why does the best quantity sit above average demand?

When a shortage costs more than a leftover, holding extra reduces the costlier error; the best quantity balances the two costs, which here places it well above the average.