| Course | OL 317 Small Business Management |
|---|---|
| Module | Module 8 |
| Paper type | undergraduate discussion post on succession planning and exit options for a small business owner |
| Length | About 390 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 317 Module 8
Module Eight Discussion
When the Owner Wants to Slow Down
My father is 51 and has cut hair for 28 years. He says he wants to cut back by 60 and stop by 65, but he has never said what happens to the shop. I handle the business side and love it, but I do not want to cut hair or manage barbers. The barber who will become shop lead under the final plan is 33, excellent and has said she wants her own shop someday.
DeTienne (2010) argued that exit is a core part of the entrepreneurial process and that owners who think about it early make different, often better, decisions along the way. Wennberg et al. (2010), studying Swedish firms, distinguished harvest sales and harvest liquidations from sales and closures made under financial distress, and found that the route an owner took depended on factors such as experience and the firm's condition. A shop that depends on its owner's chair for half its revenue has little to sell. If my father simply retired, the most likely outcome is that his clients scatter and the shop closes, which research on closures would count as a success for him but which would be a loss for his barbers.
Sharma et al. (2003), applying the theory of planned behavior to succession, found that owners were more likely to plan when they wanted the business to continue and when they believed a capable, willing successor existed. Both are true here: he wants the shop to outlast him, and the shop lead is willing.
A gradual sale to the shop lead over eight years. Years one to three, she manages Lowell and, if it opens, Dracut, with a profit share. Years four to eight, she buys 15 percent of the business each year at a price set by a formula agreed now, such as a multiple of average profit after paying a market wage for the owner's work, paid partly from her share of profits and partly through a note my father holds. He keeps cutting his own clients part time, introducing them to other barbers as he slows down. I would keep the books under a contract for as long as both want.
How does the owner you are studying plan to leave, and is the business ready to be handed on?
References
DeTienne, D. R. (2010). Entrepreneurial exit as a critical component of the entrepreneurial process: Theoretical development. Journal of Business Venturing, 25(2), 203-215. https://doi.org/10.1016/j.jbusvent.2008.05.004
Sharma, P., Chrisman, J. J., & Chua, J. H. (2003). Succession planning as planned behavior: Some empirical results. Family Business Review, 16(1), 1-15. https://doi.org/10.1111/j.1741-6248.2003.00001.x
Wennberg, K., Wiklund, J., DeTienne, D. R., & Cardon, M. S. (2010). Reconceptualizing entrepreneurial exit: Divergent exit routes and their drivers. Journal of Business Venturing, 25(4), 361-375. https://doi.org/10.1016/j.jbusvent.2009.01.001
What the OL 317 Module 8 instructions ask for
The closing OL 317 discussion has students consider how a small business owner will eventually leave the business, through succession to family or employees, sale to an outsider, closure or another route. You will describe the owner's situation, identify the realistic options and recommend a plan. Strong OL 317 posts treat exit as something to plan years ahead, consider what makes the business transferable, such as reduced owner dependence and clean records, use research on exit and succession and recognize the personal side of the decision for the owner and family. They propose concrete steps and timing rather than a general intention to sell someday, and they ask what the owner wants the business to become without him.
How this OL 317 Module 8 discussion example is built
The sample considers the owner of Pawtucket Falls Barber Co., a composite six-chair barbershop in Lowell, Massachusetts. He is 51, wants to cut back by 60 and has no plan. His daughter manages the books but does not want to cut hair or run the shop, and the lead barber hopes to own a shop someday. DeTienne's argument that exit belongs in the entrepreneurial process, Wennberg and colleagues' finding that exits range from planned sales to distress closures and Sharma, Chrisman and Chua's research on what prompts succession planning support a proposal for a gradual sale to the lead barber over eight years, with ownership steps, a valuation method and the owner still cutting hair part time. The post asks classmates how their owners plan to leave.
Where the OL 317 Module 8 rubric puts the points
OL 317 grading for this closing discussion usually follows the realism of the owner's situation as described, a fair look at exit options, use of research on exit and succession, attention to what makes the business transferable, a concrete plan with timing and replies that engage peers' cases. The best OL 317 posts recognize both the financial and the personal sides of leaving. Posts lose credit when they assume a family member will take over without asking, treat selling as simple, ignore the owner's dependence on his own clients, offer no timeline or answer classmates with general encouragement instead of a question about their owner's plans.
OL 317 Module 8 help: the mistakes that cost points
Describe the owner's age, goals and timeline and who might take over: family, employees, outside buyers or no one. List the realistic exit routes for a business of this size and type, including closing, and note what each would mean for the owner, employees and customers. Ask what would make the business transferable, such as reducing the owner's share of revenue and keeping clean records. Use research on exit and succession to explain why planning matters and what drives it. Recommend a route with steps and timing. End by asking classmates how the owners they study plan to leave, and reply with a question about how ready their businesses are to be handed on.
Get OL 317 Module 8 written to your instructions
Send the Module 8 prompt for OL 317 and what you know about the owner's plans for leaving the business. We set out the realistic exit routes, apply research on exit and succession and recommend a plan with timing, ending by inviting classmates to share how their owners will leave. Your first OL 317 exit post is free and is ready within two days of your OL 317 request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 317 papers and related BS Business Administration samples
- OL 317 Module 1 Discussion: What Makes a Small Business Different
- OL 317 Module 2 Feasibility Assignment: Feasibility of a Second Location
- OL 317 Module 3 Milestone One: Small Business Analysis
- OL 317 Module 4 Discussion: Financing Small Business Growth
- OL 317 Module 5 Milestone Two: Small Business Marketing Plan
- OL 317 Module 6 Operations and Staffing Assignment: Booth Rental Versus Employees
- OL 317 Module 7 Final Project: Small Business Growth Plan
- INT 433 Module 7 Final Project: The Multinational Marketing Plan
- ACC 345 Module 7 Project Two: The Valuation Report
- MKT 270 Module 8 Discussion: Keeping the Account After the Sale
- MKT 265 Module 1 Discussion: A Drive-In That Talks Back
OL 317 Module 8 questions, answered
Where can I find a free OL 317 Module 8 Discussion sample?
This page holds the whole OL 317 Module 8 post on how a composite barbershop owner could plan his exit and sell gradually to his lead barber.
What are the main exit routes for a small business owner?
Passing the business to family, selling to employees or managers, selling to an outside buyer or closing it, either by choice or under financial pressure.
Why should exit be planned years ahead?
Because making a business transferable, by reducing owner dependence, building records and preparing a successor, takes time, and unplanned exits more often end in closure.
What drives succession planning in small firms?
Research found owners plan more when they want the business to continue and see a willing, capable successor.
How can an employee buy a small business gradually?
Through staged purchases of ownership over several years, often financed partly by the business's profits or a seller-financed note, with the price set by an agreed method.