MKT 265 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 265 Module 1 Discussion sample asks how social media has changed marketing communications for a small business, from one-way announcements to conversations the business only partly controls. SNHU MKT 265 (MKT-265) opens its BS Marketing course on social media and marketing communications with that shift. The post introduces Twin Oaks Drive-In, a composite two-screen drive-in near Macon, Georgia, whose page posts showtimes while customers use it to debate double features, report problems and share tailgate photos. It draws on research describing social media as a hybrid part of the promotion mix and on frameworks for its building blocks, then asks where a small business should begin.

CourseMKT 265 Social Media & Marketing Communications
ModuleModule 1
Paper typeundergraduate discussion post on how social media changed marketing communications
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 265 Module 1

1

Module One Discussion

Our Customers Run Our Facebook Page Better Than We Do

I grew up going to a drive-in, so my MKT 265 example is a composite one: Twin Oaks Drive-In, a two-screen drive-in near Macon, Georgia, open February through November with room for about 640 cars. Admission is $10 for adults and $5 for children, and the concession stand earns more of the margin than the tickets. Its Facebook page has 22,000 followers, and it also has small Instagram and no TikTok accounts.

What this page is doingMy example.
2

The owners post showtimes every Monday and little else. The comments are far busier. People argue about whether a horror movie belongs in the same double feature as a family film. Someone reports that the speaker post on row nine crackles, and two others confirm it. A woman shares a photo of her family's truck bed full of pillows, and 300 people react. Nobody from Twin Oaks replies to any of it. When a mother asked whether dogs are allowed, four strangers answered with four different rules before the thread went quiet. The page has become a place where customers help, argue and celebrate, and the business is a spectator on its own page.

What this page is doingWhat happens on the page.
3

Mangold and Faulds (2009) argued that social media blends two roles in promotion: a firm still speaks to its buyers the old way, yet those buyers now speak to each other in public, so managers have to influence talk they will never own. Kaplan and Haenlein (2010) classified social media into types, from collaborative projects to social networking sites and content communities, which helps me see that Twin Oaks needs both a networking site for its regulars and a content community for its photos and videos. Kietzmann et al. (2011) proposed seven functional building blocks, a honeycomb running from identity and presence through sharing, conversations and relationships to reputation and groups. On Twin Oaks's page, conversations, sharing and reputation are all active, but the business takes part in none of them.

What this page is doingWhat the research helps me see.
4

If you ran Twin Oaks, which building block would you work on first: answering the conversations, encouraging the sharing or managing the reputation that the row-nine complaints are shaping?

What this page is doingQuestion.
5

References

Kaplan, A. M., & Haenlein, M. (2010). Users of the world, unite! The challenges and opportunities of social media. Business Horizons, 53(1), 59-68. https://doi.org/10.1016/j.bushor.2009.09.003

Kietzmann, J. H., Hermkens, K., McCarthy, I. P., & Silvestre, B. S. (2011). Social media? Get serious! Understanding the functional building blocks of social media. Business Horizons, 54(3), 241-251. https://doi.org/10.1016/j.bushor.2011.01.005

Mangold, W. G., & Faulds, D. J. (2009). Social media: The new hybrid element of the promotion mix. Business Horizons, 52(4), 357-365. https://doi.org/10.1016/j.bushor.2009.03.002

What the MKT 265 Module 1 instructions ask for

The first MKT 265 discussion pairs a quick hello with a reflection on how social media has changed the way organizations and customers communicate, usually through an example. Some prompts ask about the difference between traditional promotion and social media. A strong post looks at what actually happens on a real or composite organization's pages, separates what the business posts from what customers say to it and to each other and uses research to explain why that shift matters for marketing communications. It ends with a question about where a business should start, since the course will build a social media plan step by step from this first diagnosis.

How this MKT 265 Module 1 discussion example is built

The sample introduces Twin Oaks Drive-In, a composite two-screen drive-in near Macon, Georgia, open February through November with room for about 640 cars. Its Facebook page has 22,000 followers, and the owners post showtimes and little else. Customers, meanwhile, debate the double features, report a broken speaker post on row nine and share tailgate photos. Using Mangold and Faulds's argument that social media blends firm messages with talk among customers, Kaplan and Haenlein's classification of social media types and Kietzmann and colleagues' seven functional building blocks, the post argues that a conversation is already happening and asks classmates which block a small business should develop first. It also notes that the owners have never replied to a single comment.

Where the MKT 265 Module 1 rubric puts the points

In the first week, marks tend to follow four things: how plainly the shift in marketing communications is explained, how concrete the example is, whether sources do real explanatory work and whether replies add something. Strong posts describe what customers do on the pages as well as what the business posts, explain why customer-to-customer talk matters and apply a framework to the example. Points are lost for general statements about social media's popularity, for examples without detail, for dropping in an author's name with no finding attached and for replies that merely nod along. A brief, honest note about what the business is missing shows analytical thinking. Keep the self-introduction short and the analysis central. Concrete observations from the pages, rather than impressions, give classmates something to respond to.

MKT 265 Module 1 help: the mistakes that cost points

Choose a business whose social pages you can read. Spend ten minutes noting what the business posts and what customers write, including complaints, questions and photos. Ask whether the business is part of the conversation or only broadcasting. Use one framework, such as the building blocks of social media, to name what is happening, and cite a source on social media's role in promotion. Suggest where the business should start. Keep your introduction to a few lines. Ask classmates which building block they would develop first, which tends to draw replies based on their own experience as customers. Mention one thing the business does well, too, so the post reads as analysis rather than complaint.

Get MKT 265 Module 1 written to your instructions

Tell us the MKT 265 Module 1 prompt and a business whose social pages you follow. We show how its customers already use those pages, place that in research on social media and the promotion mix and leave classmates a question rooted in their own nights out. Your first post is on the house, and drafts usually come back on the second day. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 265 papers and related BS Marketing samples

MKT 265 Module 1 questions, answered

Where can I find a free MKT 265 Module 1 Discussion sample?

The complete MKT 265 Module 1 post is on this page, examining how a drive-in theater's customers turned its showtime page into a conversation.

How has social media changed marketing communications?

It turned one-way promotion into a conversation in which customers talk to the business and to each other, often more than the business talks to them.

Why do researchers call social media a hybrid part of promotion?

Because businesses use it to talk to customers like traditional promotion, while customers also use it to talk to each other, which businesses can shape but not control.

What are the building blocks of social media?

A widely cited honeycomb has seven cells, covering who users are, what they talk about and share, whether they are online, how they relate, how they are regarded and which groups they form.

Where should a small business start with social media?

Usually by listening to what customers already say and joining those conversations, before adding new platforms or paid campaigns.