MKT 265 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 265 Module 4 Discussion sample asks how a small business should respond to complaints, reviews and questions on social media, and whether it should answer all of them. SNHU MKT 265 (MKT-265) turns to community management and online reputation here in its BS Marketing sequence. The post follows Twin Oaks Drive-In, a composite drive-in near Macon, Georgia, which has left a year of speaker complaints and questions unanswered. It proposes a reply policy and drafts two responses, uses research on how management responses affect ratings, reviews and customer satisfaction and closes by asking classmates whether every single review deserves an answer.

CourseMKT 265 Social Media & Marketing Communications
ModuleModule 4
Paper typeundergraduate discussion post on responding to complaints and reviews on social media
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Marketing
UpdatedOctober 2026

Free sample paper for MKT 265 Module 4

1

Module Four Discussion

Fixing Row Nine in Public

For a year, Twin Oaks Drive-In, the composite drive-in near Macon I am following, has left its public complaints unanswered. There are 66 negative comments about crackling pole speakers, 38 about the restroom line on busy nights and a stream of questions about pets and rain checks. Regulars often answer for the business, sometimes wrongly.

What this page is doingThe backlog.
2

I would set three rules. Every review and every question gets a reply within one day, signed by one of the two owners by first name. Replies to complaints acknowledge the specific problem and say what is being done, never argue and never promise what the drive-in cannot deliver. Recurring questions get a pinned answer, so the same question does not need answering forty times.

What this page is doingA simple policy.
3

To a one-star review saying the row-nine speaker crackled through the whole movie: "Thank you for telling us, and we're sorry it spoiled the night. Those pole speakers are older than most of our staff. The film's sound also plays on 88.7 FM, which sounds far better, and the box office will now tell everyone that on the way in. We are rewiring rows eight through twelve this month. Your next carload is on us; just mention this review at the gate. Lisa, co-owner."

What this page is doingOne reply, written out.
4

Proserpio and Zervas (2017), studying hotels, found that those that started responding to reviews gained about 0.12 stars and 12 percent more reviews, and that negative reviews became fewer but longer once guests knew the hotel was reading. Gu and Ye (2014), using data from a Chinese travel agency, found that public replies raised the future satisfaction of complainers who received them, but lowered it among complainers who saw others get replies and received none themselves. That is the strongest argument for answering everyone, not just the easy ones. Mangold and Faulds (2009) argued that firms cannot control what customers say to each other but can shape it, and a public reply is one way.

What this page is doingWhat research says.
5

Does every review deserve an answer, including the five-star ones, or would replying to all the praise make the page feel like a form letter?

What this page is doingQuestion.
6

References

Gu, B., & Ye, Q. (2014). First step in social media: Measuring the influence of online management responses on customer satisfaction. Production and Operations Management, 23(4), 570-582. https://doi.org/10.1111/poms.12043

Mangold, W. G., & Faulds, D. J. (2009). Social media: The new hybrid element of the promotion mix. Business Horizons, 52(4), 357-365. https://doi.org/10.1016/j.bushor.2009.03.002

Proserpio, D., & Zervas, G. (2017). Online reputation management: Estimating the impact of management responses on consumer reviews. Marketing Science, 36(5), 645-665. https://doi.org/10.1287/mksc.2017.1043

What the MKT 265 Module 4 instructions ask for

The Module 4 discussion in MKT 265 generally asks how organizations should manage online conversations, including responding to complaints, negative reviews and questions, and what policies help. Some prompts ask you to respond to a sample complaint. A strong post proposes concrete rules, such as response times and who replies, drafts at least one actual response, explains the reasoning with research on management responses and recognizes trade-offs, such as the risk of replying to some complaints but not others. It treats replies as public communication read by many people besides the complainer, which is the key difference from private customer service and the reason the module exists. Policies should fit the staff who will carry them out.

How this MKT 265 Module 4 discussion example is built

In the sample, Twin Oaks Drive-In has a year of unanswered complaints about crackling pole speakers and the restroom line, plus questions about pets and rain checks. The post proposes replying to every review and question within a day, signed by a named owner, and drafts a response to a one-star review about the row-nine speaker that apologizes, explains the radio option and says the posts are being rewired. It cites Proserpio and Zervas's hotel study, in which responding raised ratings and review volume, Gu and Ye's finding that public replies helped complainers but could disappoint others left unanswered and Mangold and Faulds on shaping conversations, then asks whether every review deserves a reply.

Where the MKT 265 Module 4 rubric puts the points

Grading for this discussion typically looks at a workable response policy, the quality of the sample response, use of research on online reputation and replies to peers. Strong posts set rules a small team could follow, write a response that is specific, honest and brief and explain with evidence why public replies matter beyond the individual complainer. Points drop for policies that say only to be polite, for responses that sound like templates or argue with the customer, for research cited without its findings and for replies offering assent but no new point. Recognizing that a reply is read by future customers as much as by the complainer shows a grasp of the medium. Keep the post short enough to read on a phone.

MKT 265 Module 4 help: the mistakes that cost points

Collect a few real complaints and questions, and decide what a reasonable response time is for your business and who will reply. Write one response in full: thank the person, acknowledge the specific problem, say what is being done and invite them back, without arguing or offering what you cannot deliver. Use research to explain why public responses matter and what risks come with answering selectively. Keep the policy short enough for staff to remember. Ask classmates whether every review, including five-star ones, needs a reply, since opinions differ and the evidence on selective replies is interesting. Read your draft reply aloud before posting it; if it sounds like a form letter, rewrite it.

Get MKT 265 Module 4 written to your instructions

Post the MKT 265 Module 4 prompt and a few real or sample complaints you need to handle. We draft a reply policy and example responses, explain what research says about answering in public and pose a question that tests classmates' instincts. A first post is free and usually ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 265 papers and related BS Marketing samples

MKT 265 Module 4 questions, answered

Where can I find a free MKT 265 Module 4 Discussion sample?

The full MKT 265 Module 4 post is on this page, setting a reply policy and drafting responses to a drive-in theater's complaints and reviews.

Should businesses respond to negative reviews?

Generally yes; a study of hotels found that those that began responding saw higher ratings and more reviews, though negative reviews became fewer but longer.

How should a business respond to a complaint on social media?

Thank the person, acknowledge the specific problem, explain what is being done and invite them back, briefly and without arguing.

Can replying to some complaints but not others backfire?

Research on an online travel agency found that complainers who saw others receive replies but received none themselves became less satisfied.

How fast should a business respond on social media?

As fast as it can reliably manage; many small businesses aim for the same day, and a stated, kept standard matters more than speed alone.