OL 322 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 322 Module 4 Discussion sample asks how a manager should read and respond to an employee's resistance to change. SNHU OL 322 (OL-322) turns to resistance halfway through the BS Business Administration term, and here the focus falls on an objection from a union steward at the composite Merriton, Connecticut, public works department, a 26-year equipment operator who called the tablets "the trackers again." It separates what he believes, feels and intends, checks for a general disposition to resist, applies research on how change agents create resistance and proposes a data-use working group he would co-chair, then asks classmates how they would respond.

CourseOL 322 Managing Organizational Change
ModuleModule 4
Paper typeundergraduate discussion post on interpreting and responding to employee resistance to an organizational change
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 322 Module 4

1

Module Four Discussion

What the Union Steward Is Really Saying

At a department meeting last week, the highway division's union steward, an equipment operator with 26 years in the department, stood up after the director's presentation. "This is the trackers again with a bigger screen," he said. "We fought that once. The guys aren't going to use them." Several crew members nodded. One foreman said afterward that the steward "fights everything" and should be worked around.

What this page is doingThe objection.
2

Piderit (2000) argued that employees' responses to change mix what they think, what they feel and what they plan to do, and that these can pull apart, and that calling the whole response "resistance" hides that ambivalence. The steward's belief is not that paper works; in the readiness focus group he described lost work orders as "a joke." His feeling is anger, rooted in 2017, when crews learned about GPS trackers from a memo. His stated intention, not to use the tablets, follows from the anger, not the belief.

What this page is doingWhat he believes, feels and intends.
3

Oreg (2003) developed a measure of dispositional resistance to change, including a preference for routine and strong emotional reactions to imposed change. Some people do resist change in general. The steward's record suggests he is not one of them: he pushed for the department's new wing plows in 2019 and trained other operators on them.

What this page is doingIs he resistant by nature?
4

Ford et al. (2008) argued that change agents often help produce the resistance they encounter, by breaking agreements, by leaving damaged trust unrepaired and by poor communication, and that resistance can be a useful resource. The 2017 rollout broke an implicit agreement that working conditions would be discussed before they changed, and no one repaired it. The steward is pointing to a real gap in the current plan: nobody has said what location data will be used for.

What this page is doingWho created the resistance?
5

Not work around him. Ask him to co-chair, with the director, a working group of crew members and union officers that drafts a written agreement on how tablet data may and may not be used, to be bargained with the union before launch.

What this page is doingWhat I would do.
6

Think of someone who resisted a change you saw. What did they believe, feel and intend, and what were they pointing to?

What this page is doingYour resister.
7

References

Ford, J. D., Ford, L. W., & D'Amelio, A. (2008). Resistance to change: The rest of the story. Academy of Management Review, 33(2), 362-377. https://doi.org/10.5465/amr.2008.31193235

Oreg, S. (2003). Resistance to change: Developing an individual differences measure. Journal of Applied Psychology, 88(4), 680-693. https://doi.org/10.1037/0021-9010.88.4.680

Piderit, S. K. (2000). Rethinking resistance and recognizing ambivalence: A multidimensional view of attitudes toward an organizational change. Academy of Management Review, 25(4), 783-794. https://doi.org/10.5465/amr.2000.3707722

What the OL 322 Module 4 instructions ask for

This OL 322 discussion has students examine resistance to a change, ideally a specific person's or group's objection, and decide how a manager should respond. You will describe the objection, consider what lies behind it and propose a response. OL 322 posts that score well avoid treating resistance as a character flaw, separate what people think, feel and intend to do, ask whether the objection reveals something real about the change or its history and use research on resistance and ambivalence to frame a response that engages the objector. They propose a concrete step, such as involving the objector in solving the problem he raised, and they recognize the legitimacy of formal channels such as a union.

How this OL 322 Module 4 discussion example is built

The sample examines an objection raised by the union steward for the highway division of the composite Merriton, Connecticut, Department of Public Works, a 26-year equipment operator who told a department meeting that the tablets were "the trackers again" and that crews would not use them. Piderit's multidimensional view of attitudes separates his belief that paper fails, his anger about 2017 and his stated intention not to cooperate. Oreg's measure of dispositional resistance prompts a check of his record, which shows he championed new plow equipment. Ford, Ford and D'Amelio's work on change agents' role in resistance points to the unrepaired breach of 2017. The post proposes a data-use working group he would co-chair, then asks classmates how they would respond.

Where the OL 322 Module 4 rubric puts the points

OL 322 grading for this discussion tends to follow how carefully the objection is described, how well the post separates beliefs, feelings and intentions, the use of research on resistance and ambivalence, attention to history and legitimate concerns, a constructive response and replies that help classmates reconsider their own cases. Top OL 322 posts show how the objection could improve the change. Posts lose credit when they label the objector stubborn or old-fashioned, recommend going around him or the union, rely on more persuasion as the only response, ignore what the objection reveals or answer classmates with agreement rather than an alternative reading of their resister.

OL 322 Module 4 help: the mistakes that cost points

Describe one objection to the change in the objector's own words, along with the setting and their role. Ask three questions: what does this person believe about the change, how do they feel about it and what do they intend to do? Look for history that might explain the reaction, such as a past change that went badly. Check whether the person resists change in general or only this change. Use research on resistance and ambivalence to frame your view. Then propose a response that involves the person in solving the problem behind the objection. End by asking classmates how they would respond, and reply with a different reading of someone in their case.

Get OL 322 Module 4 written to your instructions

Send the Module 4 prompt for OL 322 and the objection or pushback you are examining. We separate beliefs, feelings and intentions, check what history or design problems the objection points to, apply research on resistance and ambivalence and propose a response, ending with a question that draws in classmates. Your first OL 322 resistance post is free and arrives in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 322 papers and related BS Business Administration samples

OL 322 Module 4 questions, answered

Where can I find a free OL 322 Module 4 Discussion sample?

The complete OL 322 Module 4 post appears on this page: what a union steward's objection to tablets in public works trucks really means.

What is ambivalence toward change?

Holding mixed reactions, for example believing a change is needed while feeling anxious about it or unsure whether to cooperate, which research suggests is common.

Is some resistance to change a personality trait?

Research identified dispositional resistance, including preferring routine and reacting emotionally to imposed change, but most resistance responds to how a specific change is handled.

How do managers create resistance?

By breaking agreements, failing to repair trust after earlier problems and communicating poorly, which can turn reasonable doubts into opposition.

How should a manager respond to a union objection?

By treating it as a legitimate concern, meeting through the proper channels and involving union representatives in solving the problem raised.