OL 322 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 322 Module 1 Discussion sample asks why organizational change efforts fail, using a failure the organization still remembers. SNHU OL 322 (OL-322) opens its BS Business Administration change course with this question. The post introduces the Merriton, Connecticut, Department of Public Works, a composite 186-person department about to put tablets in every truck, and its 2017 attempt to add GPS tracking, announced by memo, grieved by the union and dropped within four months. It applies research on how employees react to change, the content, context and process of change and Lewin's planned approach, then asks classmates about a change they lived through.

CourseOL 322 Managing Organizational Change
ModuleModule 1
Paper typeundergraduate discussion post on why organizational change efforts fail, introducing the change to be managed
LengthAbout 390 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 322 Module 1

1

Module One Discussion

The Tracking System That Lasted Four Months

For this course I will study the Department of Public Works in Merriton, Connecticut, a composite department serving a city of about 58,000 people. It has 186 employees: 128 field workers in highway, parks, sanitation and fleet maintenance, 22 foremen and supervisors, 18 office and dispatch staff and 18 engineers and administrators. Work orders still arrive by phone, are written on paper, assigned by radio and filed in cabinets. I am the department's operations analyst, and the city has paid for software that tracks every job and every city asset, with tablets in every truck, and a reorganization of crews from citywide divisions into four neighborhood zones.

What this page is doingThe organization and the change.
2

In 2017 the department installed GPS trackers in its trucks. Crews learned about it from a one-page memo saying the trackers would "improve efficiency and accountability." Many read "accountability" as surveillance. The union filed a grievance, arguing the change affected working conditions and should have been bargained. Several trackers were found unplugged. Within four months the project was dropped, and the vendor contract was paid off. Seven years later, crews still bring it up.

What this page is doingThe last time.
3

Oreg et al. (2011), reviewing six decades of quantitative research on how employees react to change, concluded that how people respond rests largely on how the change is handled, including how much people were told, whether they could take part and whether they trusted management, as well as on the benefits and harms they expected. Armenakis and Bedeian (1999) distinguished a change's content, what changes, from its context and its process, how it is carried out. The trackers' content was not unreasonable; plenty of fleets use them. The process was the problem: no explanation of purpose, no say for crews and no bargaining with the union. Burnes (2004) argued that Lewin's planned approach to change, often reduced to "unfreeze, move, refreeze," actually stressed participation, group decision making and learning by doing. The 2017 rollout skipped all three.

What this page is doingWhy it failed.
4

The tablets will look like trackers to many crew members, and some will in fact record locations. If we repeat the memo approach, we will repeat the result. This time, the change has to start with the people who will carry the tablets.

What this page is doingWhat it means now.
5

Think of a change you lived through at work. Was its success or failure about what changed or how it was done?

What this page is doingYour change.
6

References

Armenakis, A. A., & Bedeian, A. G. (1999). Organizational change: A review of theory and research in the 1990s. Journal of Management, 25(3), 293-315. https://doi.org/10.1177/014920639902500303

Burnes, B. (2004). Kurt Lewin and the planned approach to change: A re-appraisal. Journal of Management Studies, 41(6), 977-1002. https://doi.org/10.1111/j.1467-6486.2004.00463.x

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

What the OL 322 Module 1 instructions ask for

The opening OL 322 discussion has students introduce an organization facing change and reflect on why changes succeed or fail. You will describe the organization, the change ahead and, ideally, a past change and how it went. OL 322 posts that score well separate what a change was from how it was carried out, use research on employees' reactions and on planned change rather than general opinions about resistance, look honestly at the organization's history and draw a lesson for the change ahead. A specific past failure or success, described in a few concrete sentences, gives classmates something real to discuss and gives the writer a baseline for the OL 322 change plan to come.

How this OL 322 Module 1 discussion example is built

The sample introduces the Department of Public Works in Merriton, Connecticut, a composite department of 186 employees in highway, parks, sanitation, fleet and engineering, which plans to replace paper work orders and radio dispatch with tablets and reorganize crews by neighborhood. In 2017 the department installed GPS trackers in its trucks after a one-page memo; the union grieved, crews disabled units and the project was dropped within four months. Oreg, Vakola and Armenakis's review of research on change recipients, Armenakis and Bedeian's framework of content, context and process and Burnes's reappraisal of Lewin show that the earlier change failed in its process. The post asks classmates about a change they lived through and what made it work or fail.

Where the OL 322 Module 1 rubric puts the points

OL 322 graders reading this first post look for a clear introduction to the organization and its change, an honest account of a past change, use of change research to explain success or failure, a lesson for the change ahead and replies that build on peers' stories. The best OL 322 posts separate the content of a change from the process used to carry it out. Posts lose credit when they blame failure on resistant employees, describe the change without the people affected, cite a change model without applying it, skip the organization's history or reply with sympathy instead of a question about what could have been done differently.

OL 322 Module 1 help: the mistakes that cost points

Describe the organization and the change it faces in a few sentences. Then look back: has the organization tried a similar change before, and what happened? Describe it concretely, including how it was announced, who was involved and how employees reacted. Separate what the change was from how it was done. Use research on how employees react to change and on planned change to explain why it went as it did. Draw one lesson for the current change. End by asking classmates about a change they lived through, and reply with a question about what could have been done differently in theirs.

Get OL 322 Module 1 written to your instructions

Send the Module 1 prompt for OL 322 and a few lines about the change you will study. We explain what went right or wrong in the organization's past changes, connect the lessons to change research and set up the current change, ending on a question that invites classmates' own stories. The first OL 322 post is free and normally arrives two days after you ask. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 322 papers and related BS Business Administration samples

OL 322 Module 1 questions, answered

Where can I find a free OL 322 Module 1 Discussion sample?

This page holds the complete OL 322 Module 1 post on a public works department's failed GPS tracking rollout and what it means for the next change.

Why do organizational changes fail?

Often because of how they are carried out: little explanation or participation, broken trust and poor support, rather than because the change itself was wrong.

What are the content, context and process of change?

Content is what changes, context is the internal and external conditions surrounding it and process is how the change is carried out, all of which shape success.

What was Lewin's planned approach to change?

A set of ideas, including field theory, group dynamics, action research and the three-step model of unfreezing, moving and refreezing, that treats change as a participative learning process.

How do employees react to organizational change?

Research shows reactions depend on the change process, such as participation and communication, on perceived benefits and harms and on employees' traits and context.