OL 322 Module 6 Implementation Leadership Assignment Example

Reviewed by Portia Lambrick, MBA

This OL 322 Module 6 Implementation Leadership sample examines how supervisors and leaders should lead a change once it begins, including getting people to adopt new technology. SNHU OL 322 (OL-322) has BS Business Administration students apply implementation research to their change. The organization is the composite Merriton, Connecticut, public works department, where 22 foremen and supervisors will make or break the move to tablets and zones. The paper draws on research on change leadership, technology acceptance and implementation climate to set the behaviors expected of foremen, the support they need, design choices that make tablets useful to crews and measures of real use.

CourseOL 322 Managing Organizational Change
ModuleModule 6
Paper typeundergraduate assignment on how supervisors and leaders should lead the implementation of a change, including adoption of new technology
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 322 Module 6

1

Supervisors First, Then the Trucks: Leading Implementation at Merriton Public Works

[Student Name]

Southern New Hampshire University

OL 322: Managing Organizational Change

Implementation Leadership Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe foremen, crews and adoption figures are fictional, created only for OL 322.
2

Supervisors First, Then the Trucks: Leading Implementation at Merriton Public Works

Introduction

The change plan sequences the move to tablets and neighborhood zones from a data-use agreement through a pilot and training to rollout. Whether crews actually use the system will depend most on 22 foremen and supervisors. Crews see the director at monthly meetings; they see their foreman every morning. This paper examines how foremen should lead the change day to day, what support they need and how the system itself can be shaped so crews want to use it.

What this page is doingExplains why foremen are the key.
3

The Foremen's Starting Point

Most of the department's foremen are in their fifties and came up through the crews. In the readiness survey, they scored lowest of any group on confidence that they could do what the change requires, 2.7 out of 5. In focus groups they described two fears: learning the system in front of crews they supervise and being judged by numbers the system produces, such as how long each job took, that they do not fully control. Several said they would support the change if it made their jobs easier rather than adding screens to their day.

What this page is doingDescribes their situation.
4

Change Leadership, Not Just Leadership

Herold et al. (2008), studying employees across many organizations undergoing change, found that change leadership, meaning concrete actions like spelling out the reasons, bringing people in and following through, was more strongly related to employees' commitment to the change than general transformational leadership, above all where the change reached deep into people's own day-to-day jobs. Tablets and zones will change crews' daily routine more than anything in years. That means foremen do not need to become inspiring leaders overnight; they need to do a handful of specific things consistently.

Foreman behaviors during rollout

BehaviorWhat it looks like in the first six weeks
Explain why, in the crew's terms"We stop getting sent to jobs that are already done" rather than "efficiency"
Use it first and visiblyForeman closes his own inspections on the tablet at the morning lineup
Coach without taking overHands the tablet back and talks a crew member through the step
Clear obstacles the same dayReports dead tablets, bad screens and wrong addresses at the end of each shift
Notice and say what is workingNames crews who close orders with photos, and passes their tips along
What this page is doingApplies research on leading change.
5

What Makes Crews Use It

Venkatesh and Davis (2000), extending the technology acceptance model through field studies in four organizations, found that people's intentions to use a system depended mainly on how useful they thought it was and how easy, and that perceived usefulness was shaped by whether the system was relevant to their job, whether its results were visible and by the views of people important to them. For crews, usefulness has to be concrete. Three design choices from the pilot respond to this. Crews can close a work order with a photo and a voice note instead of typing, which saves time in gloves and cold weather. The tablet shows the full history of an asset, so a crew can see that a catch basin was cleaned last month and why it has backed up again. And the system routes the next nearby job to the truck, which cuts driving back to the garage between assignments. Pilot crews reported the photo closeout and job routing as the features that changed their minds.

What this page is doingApplies technology acceptance research.
6

The Climate Around the Tablets

Klein and Sorra (1996) argued that whether an innovation is used consistently depends on the implementation climate, employees' shared sense that using it is expected, supported and rewarded, and on how well it fits their values. The climate is shaped by small signals. If a foreman accepts paper forms after the backup period ends, crews will learn that the tablets are optional. If the director uses location data in a disciplinary case in violation of the agreement, crews will learn that the 2017 fears were right, and use will collapse. The values fit matters too: crews value doing a job right and being trusted. The design should show crews' work, through photos and closed orders, more than it watches them.

What this page is doingApplies implementation research.
7

A Crew's First Week

On Monday of a zone's launch, the foreman opens the 7 a.m. lineup with the tablet in hand, explains in two minutes what changes today and hands each crew its tablet. The first job is chosen to be simple, such as a sign replacement, so crews can practice closing it with a photo. A peer helper from the pilot rides with each crew for part of the first two days. By Wednesday, crews receive routed jobs on the tablet, and the foreman checks in by radio rather than visiting every job. On Friday, the foreman gathers the crew for fifteen minutes to hear which steps went smoothly, which ones tripped people up and which fix should come first, and reports the answers that afternoon.

What this page is doingShows the change from the truck.
8

Supporting the Foremen

Foremen will be trained first, in groups of four away from their crews, with two half-days of practice on real scenarios before the pilot ends. Each receives a one-page guide to the five behaviors and a short weekly call with the operations analyst during their zone's first six weeks. Once a month the foremen will sit down together and trade problems and fixes. Their performance reviews for the year will include how their crews adopt the system, but not raw job-time figures, which the data-use agreement excludes from individual evaluation.

What this page is doingPlans what leaders need.
9

Measures of Real Use

Adoption measures by zone

MeasureTarget six weeks after go-live
Work orders closed on tablets90%
Paper backup forms usedUnder 5% after week six
Orders closed with a photo70%
Crews rating the tablet useful (pulse survey)60% agree
Tablet problems reported and fixed within a day90%
What this page is doingDefines adoption.
10

Conclusion

Crews will decide whether the tablets work by watching their foremen and by finding out whether the system saves them trouble. Specific leadership behaviors, foremen trained first and supported, design choices that make the tablets useful and a climate that keeps faith with the data-use agreement give the change its best chance. These elements will be combined in the final change management plan.

What this page is doingConnects to the final plan.
11

References

Herold, D. M., Fedor, D. B., Caldwell, S., & Liu, Y. (2008). The effects of transformational and change leadership on employees' commitment to a change: A multilevel study. Journal of Applied Psychology, 93(2), 346-357. https://doi.org/10.1037/0021-9010.93.2.346

Klein, K. J., & Sorra, J. S. (1996). The challenge of innovation implementation. Academy of Management Review, 21(4), 1055-1080. https://doi.org/10.5465/amr.1996.9704071863

Venkatesh, V., & Davis, F. D. (2000). A theoretical extension of the technology acceptance model: Four longitudinal field studies. Management Science, 46(2), 186-204. https://doi.org/10.1287/mnsc.46.2.186.11926

What the OL 322 Module 6 instructions ask for

The Module 6 assignment in OL 322 has students analyze how a change will be led during implementation, often focusing on supervisors and the adoption of a new system or process. You will identify who will lead the change day to day, what they need to do and what support they will receive, and how the organization will encourage people to adopt the new way of working. OL 322 papers that score well focus on specific, observable leadership behaviors, recognize that front-line supervisors often matter more than senior leaders, use research on what drives adoption of technology, consider how the change can be designed to be genuinely useful and easy and set measures of actual use rather than training attendance.

How this OL 322 Module 6 implementation leadership assignment example is built

The sample examines how the 22 foremen and supervisors at the composite Merriton, Connecticut, Department of Public Works will lead the move to tablets and neighborhood zones. Herold and colleagues' finding that specific change leadership behaviors predicted commitment better than general transformational leadership, especially for high-impact changes, shapes five foreman behaviors. Venkatesh and Davis's extended technology acceptance model and Klein and Sorra's account of implementation climate and values fit guide design choices, such as photo closeout that saves crews a trip back to the office, and the support foremen will receive. Measures track work orders closed on tablets, paper backups used and crews' ratings of usefulness.

Where the OL 322 Module 6 rubric puts the points

OL 322 implementation papers are generally marked on a clear identification of who leads the change day to day, specific leadership behaviors grounded in research, a realistic support plan for those leaders, attention to what drives adoption, design choices that make the change useful, measures of actual use and organized writing. Strong OL 322 papers show how a typical crew's first week would go and what the foreman does at each point. Papers lose marks for focusing only on senior leaders, describing leadership in general terms, assuming training alone produces adoption, ignoring whether the system helps the people using it or measuring success by logins and attendance.

OL 322 Module 6 help: the mistakes that cost points

Identify the people who will lead the change where the work happens, often front-line supervisors. Describe what they need to do, in specific behaviors, during the first weeks: explaining why, coaching, removing obstacles and recognizing progress. Plan their support: training first, time, help and a way to raise problems. Then look at the change from users' point of view: is it useful to them, is it easy and do respected peers use it? Adjust the design where you can. Consider whether the climate rewards use or quietly allows people to fall back. Set measures of real use and of users' experience, and decide how often leaders will review them.

Get OL 322 Module 6 written to your instructions

Share the OL 322 Module 6 instructions and the change you are implementing. We identify the leaders who will make or break it, define the behaviors they need, plan their support, design the change so people find it useful and set measures of real adoption, with research on change leadership and technology acceptance. Your first OL 322 implementation paper is free; the draft lands two days after your request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 322 papers and related BS Business Administration samples

OL 322 Module 6 questions, answered

Where can I find a free OL 322 Module 6 implementation sample?

This page holds the complete OL 322 Module 6 paper on how public works foremen can lead a tablet rollout so crews actually use it.

What is change leadership?

Specific behaviors leaders use to carry out a change, such as explaining its purpose, involving people, coaching and following through, as distinct from general leadership style.

What drives employees to adopt new technology?

Research on technology acceptance found that perceived usefulness and ease of use matter most, shaped by job relevance, visible results and the views of respected others.

What is an implementation climate?

Employees' shared sense that using an innovation is expected, supported and rewarded, which research links to how consistently it is actually used.

Why do front-line supervisors matter in change?

Employees judge a change largely by how their own supervisors explain, support and model it, so supervisors can make or break adoption.