OL 322 Module 7 Final Project Example

Reviewed by Portia Lambrick, MBA

This OL 322 Module 7 Final Project sample lays out a full plan for managing change, from the case for change to how the change will hold after launch. SNHU OL 322 (OL-322) completes its BS Business Administration change course with this plan. The organization is the composite Merriton, Connecticut, Department of Public Works, replacing paper work orders with tablets and reorganizing crews into neighborhood zones. The plan draws its lessons from a failed 2017 rollout, measures readiness, sequences four phases, plans communication, participation and foreman leadership, sets adoption measures and a sustainment plan and budgets about $96,000 beyond the system itself.

CourseOL 322 Managing Organizational Change
ModuleModule 7
Paper typeundergraduate final project presenting a complete change management plan for an organization, built from the course milestones
LengthAbout 1,060 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramBS Business Administration
UpdatedOctober 2026

Free sample paper for OL 322 Module 7

1

Doing It With the Crews This Time: A Change Management Plan for Merriton Public Works

[Student Name]

Southern New Hampshire University

OL 322: Managing Organizational Change

Final Project: Change Management Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe city, its department and every figure in this plan exist only for this OL 322 project.
2

Doing It With the Crews This Time: A Change Management Plan for Merriton Public Works

Introduction

Merriton's Department of Public Works is trading clipboards and radio calls for tablets in every truck and will reorganize its crews into four neighborhood zones over fourteen months. The city has bought the system. Whether crews use it depends on something money cannot buy: confidence that managers will make this change alongside them. Seven years ago the trucks got GPS units after nothing more than a one-page memo; the union grieved, trackers were unplugged and the project was dropped within four months. This plan is built on that lesson.

What this page is doingStates the change and the lesson that shapes the plan.
3

What Changed After Feedback

Comments on the readiness assessment asked whether the survey reached Spanish-speaking crew members; the plan now repeats the survey in both languages before rollout, with results reported separately. Comments on Milestone Two questioned whether the pilot zone would be typical; the pilot now includes a sanitation route as well as highway and parks crews. Comments on the implementation paper asked how foremen's own concerns would be heard; foremen now have a standing monthly meeting with the director.

What this page is doingShows revisions.
4

The Case for Change

About 2,300 of the department's 19,000 work orders last year were lost, duplicated or never recorded. The state stormwater permit requires inspection records the paper files cannot produce, and the city has already received a warning letter. Resident complaints to the mayor's office have doubled in three years. Crews themselves describe lost work orders as a daily frustration. The case for changing the system is not in dispute; the readiness survey found agreement in every group.

What this page is doingSummarizes the drivers.
5

Readiness and the Forces at Work

Armenakis et al. (1993) argued that readiness depends on people believing a change is needed and that it can be done. The survey of 141 employees found the first belief widely shared and the second weak among crews and foremen, along with deep doubt that management would see the change through and fear that location data would be used against crews. The force field analysis showed that what holds this change back most is a question of trust rather than technology. In the words of Ford et al. (2008), those leading change can produce resistance themselves by leaving breaches of trust unrepaired; the plan treats repairing 2017 as its first task.

What this page is doingSummarizes the diagnosis.
6

The Plan in Four Phases

Stouten et al. (2018), integrating management practice models with research evidence, identified principles that successful changes share, including diagnosing the problem, assessing readiness, involving people, leading with clear behaviors and institutionalizing the change. The four phases follow that logic. In months one to three, a working group co-chaired by the highway division's union steward drafts a data-use agreement, which is bargained with the union, and the director acknowledges 2017 openly in every division. In months four to six, four volunteer crews in one zone pilot the tablets and recommend changes. In months five to seven, every foreman is trained in small groups before crews are. From month eight through month fourteen, the other zones follow in sequence, each six weeks after the last. No phase begins until the previous checkpoint is met: a signed agreement, a pilot recommendation, trained foremen and readiness scores above 3.0 among crews.

What this page is doingSequences the work.
7

Communication and Participation

Communication follows the questions employees raised: whether data will be used for discipline, whether crews will be broken up, whether they will learn alone and what happens on day one. Each is answered at the stage when it matters, by the most credible messenger, often a foreman or pilot crew member rather than the director. A weekly question-and-answer sheet in every garage and a monthly open hour with the director keep communication two-way. Crews' input can alter the plan itself: the working group writes the data-use rules, pilot crews shape screens and procedures and crews pick their zones under rules meant to keep core teams together.

What this page is doingAnswers the questions people ask.
8

Leading the Change Where the Work Happens

Herold et al. (2008) found that specific change leadership behaviors predicted employees' commitment to a change more than general leadership style, especially when the change heavily affected their jobs. Foremen will practice five behaviors: explaining the change in crews' terms, using the tablet first and visibly, coaching without taking over, clearing obstacles the same day and recognizing what works. They are trained first, supported weekly during their zone's launch and evaluated on their crews' adoption, but not on individual job times, which the data-use agreement excludes.

What this page is doingDefines foremen's role.
9

Measures

Measures and targets

MeasureBaselineSix weeks after each zone launchesTwelve months after full rollout
Work orders closed on tablets0%90%98%
Lost, duplicated or unrecorded ordersAbout 2,300 a yearFallingUnder 500 a year
Stormwater inspections documentedIncompleteComplete for the zoneComplete citywide
Crews agreeing management supports the change2.2 of 5Above 3.0Above 3.5
Grievances about tablet datan/a00
What this page is doingTracks adoption and results.
10

Sustaining the Change

Buchanan et al. (2005) concluded from their review that new ways of working tend to fade when leaders turn to other priorities, and that whether they last depends on many factors, including leadership, the fit of the change with how work is organized and whether it becomes part of everyday routines and the department's systems. The plan builds the change into the department's normal operations. Paper forms are retired after each zone's backup period and removed from the garages. Work order data feed the monthly report to the city council, so leaders keep looking at them. Zone foremen meet monthly to review their zone's measures. The data-use agreement is reviewed jointly with the union each year. New employees learn the system in orientation rather than from a separate training. And the readiness survey is repeated one year after full rollout to catch early signs of slipping.

What this page is doingPlans for the year after launch.
11

Budget

Change management budget (beyond system purchase)

ItemCost
Overtime and reduced routine work during training and zone launches$48,000
Pilot support and spare tablets$14,000
Working group meetings and bargaining time$9,000
Translation, printing and communication materials$6,000
Foreman coaching and monthly sessions$11,000
Readiness surveys and follow-up$8,000
Total$96,000
What this page is doingFunds the support the plan needs.
12

Conclusion

The director and the city must commit, before anything else, to bargaining the data-use agreement and keeping it, to holding each phase until its checkpoint is met and to funding the training time the plan requires. If they do, the department can replace paper with a system its crews trust, and avoid a second abandoned rollout.

What this page is doingStates what leaders must decide.
13

References

Armenakis, A. A., Harris, S. G., & Mossholder, K. W. (1993). Creating readiness for organizational change. Human Relations, 46(6), 681-703. https://doi.org/10.1177/001872679304600601

Buchanan, D., Fitzgerald, L., Ketley, D., Gollop, R., Jones, J. L., Lamont, S. S., Neath, A., & Whitby, E. (2005). No going back: A review of the literature on sustaining organizational change. International Journal of Management Reviews, 7(3), 189-205. https://doi.org/10.1111/j.1468-2370.2005.00111.x

Ford, J. D., Ford, L. W., & D'Amelio, A. (2008). Resistance to change: The rest of the story. Academy of Management Review, 33(2), 362-377. https://doi.org/10.5465/amr.2008.31193235

Herold, D. M., Fedor, D. B., Caldwell, S., & Liu, Y. (2008). The effects of transformational and change leadership on employees' commitment to a change: A multilevel study. Journal of Applied Psychology, 93(2), 346-357. https://doi.org/10.1037/0021-9010.93.2.346

Stouten, J., Rousseau, D. M., & De Cremer, D. (2018). Successful organizational change: Integrating the management practice and scholarly literatures. Academy of Management Annals, 12(2), 752-788. https://doi.org/10.5465/annals.2016.0095

What the OL 322 Module 7 instructions ask for

The OL 322 final project brings the course together in a change management plan for one organization. Expect to present the case for change, an analysis of the change and the organization's readiness, a phased implementation plan, communication and participation, the role of leaders, measures and a plan for sustaining the change after launch. OL 322 plans that score well read as one argument grounded in evidence from the organization, sequence the work so that trust and capability are built before rollout, show how employee concerns shaped the plan, plan measurement beyond launch day and explain how the change will become part of normal work. They also show where instructor comments on the milestones led to revisions.

How this OL 322 Module 7 final project example is built

The sample plan addresses the composite Merriton, Connecticut, Department of Public Works, replacing paper work orders and radio dispatch with tablets and reorganizing crews into four neighborhood zones. It traces the lesson of a 2017 tracking rollout that failed within four months, reports readiness by group, sequences four phases from a data-use agreement bargained with the union through a pilot zone and foremen-first training to zone-by-zone rollout and plans communication around employees' questions. It defines five foreman behaviors, sets adoption measures and a sustainment plan and budgets about $96,000 beyond the system. Stouten, Rousseau and De Cremer's evidence-based principles, Armenakis and colleagues on readiness, Ford and colleagues on resistance, Herold and colleagues on change leadership and Buchanan and colleagues on sustaining change support it.

Where the OL 322 Module 7 rubric puts the points

Grading for the OL 322 final project generally weighs a well-supported case for change, sound diagnosis and readiness assessment, a logical phased plan, communication and participation that respond to employees' concerns, attention to leaders at every level, measures of adoption and results, a credible plan for sustaining the change, use of milestone comments and research and professional writing. The most convincing OL 322 plans show how the change will be kept in place a year after launch. Plans lose marks for ending at launch day, casting every objection as an obstacle instead of information, relying on top leaders alone, omitting measures or leaving earlier milestones unrevised.

OL 322 Module 7 help: the mistakes that cost points

Rework each OL 322 milestone in light of your instructor's comments before combining them. Open with the case for change and the most important lesson from the organization's history. Summarize the analysis and readiness findings briefly, then present the plan in phases, with checkpoints between them. Show how communication and participation answer the concerns people raised. Describe what leaders at each level will do. Set measures of both adoption and results, with targets and dates. Then plan how the change will last: routines, roles, policies and reviews that keep it in place after attention moves on. Add a budget. Close with what the organization's leaders must decide now.

Get OL 322 Module 7 written to your instructions

Share your OL 322 Module 7 instructions with the milestones written so far, and we will assemble one change management plan covering diagnosis, readiness, phases, communication, participation, leadership, measures and sustainment, revised with your instructor's comments. The first OL 322 final project costs nothing, and a draft follows two days after you ask. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 322 papers and related BS Business Administration samples

OL 322 Module 7 questions, answered

Where can I find a free OL 322 Module 7 Final Project sample?

This page carries the complete OL 322 final project: a change management plan for a composite public works department's move to tablets and neighborhood crews.

What goes in a change management plan?

The case for change, diagnosis and readiness, a phased plan with checkpoints, communication and participation, leadership roles, measures and a plan for sustaining the change.

What principles does research support for managing change?

A synthesis of research and practice supports diagnosing the problem, assessing readiness, involving people, leading with clear behaviors, communicating continually and institutionalizing the change.

How do you keep a change from sliding back?

By building it into routines, roles, policies, measures and reviews, and by watching for early signs of decay after the launch excitement fades.

Why include a budget in a change plan?

Because training time, pilot support, communication and backup systems cost money, and unfunded support is one of the most common reasons changes stall.