| Course | OL 322 Managing Organizational Change |
|---|---|
| Module | Module 2 |
| Paper type | undergraduate assignment assessing an organization's readiness for a planned change and recommending steps to build it |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Business Administration |
| Updated | October 2026 |
Free sample paper for OL 322 Module 2
Is the Department Ready? A Change Readiness Assessment for Merriton Public Works
[Student Name]
Southern New Hampshire University
OL 322: Managing Organizational Change
Change Readiness Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Is the Department Ready? A Change Readiness Assessment for Merriton Public Works
Introduction
The Module 1 discussion traced the department's failed 2017 tracking rollout to its process: a memo, no participation and no bargaining. Before the new tablet and zone change is planned in detail, this paper measures how ready the department is for it. It describes the method, reports the results by group, interprets them with readiness research and recommends steps to raise readiness before anything is launched.
Method
Holt et al. (2007) developed a readiness scale built on four dimensions: whether people judge the change to be the right one, whether they expect their leaders to back it, whether they trust their own ability to carry it out, which they called change efficacy, and whether they expect it to benefit them personally, which they called personal valence. A 16-item survey adapted from those dimensions, with four statements per dimension rated from one to five plus two questions answered in people's own words, went to all 186 employees, on paper or online and in English or Spanish as each preferred. Union stewards reviewed the questions in advance and encouraged members to take part. 141 responded, 76 percent. Six focus groups of six to eight people each, two with crews, two with foremen and supervisors and one each with dispatchers and engineers, explored the reasons behind the scores.
Results by Group
Average readiness scores (1 = strongly disagree, 5 = strongly agree)
| Dimension | Crews (n = 92) | Foremen and supervisors (n = 19) | Dispatch and office (n = 16) | Engineers and managers (n = 14) |
|---|---|---|---|---|
| Appropriateness: the change is needed | 3.7 | 3.4 | 4.3 | 4.6 |
| Management support: leaders will see it through | 2.2 | 2.6 | 3.1 | 4.1 |
| Change efficacy: I can do what it requires | 3.1 | 2.7 | 3.9 | 4.4 |
| Personal valence: it will benefit me | 2.4 | 2.3 | 3.6 | 4.0 |
Every group agrees, at least moderately, that the current system needs to change. Beyond that, the groups divide sharply. Engineers and managers are ready on every dimension. Crews and foremen doubt management will support them, doubt the change will benefit them and, in the foremen's case, doubt they can do it.
What People Said
Crews described the problems with paper vividly: work orders lost between the office and the truck, the same pothole visited twice by different crews and residents calling three times before a fallen tree is cleared. But many tied the tablets to 2017. "It's the trackers again with a bigger screen," said one equipment operator. Others feared the zones would break up crews that had worked together for years. Foremen, most of them in their fifties, worried about learning the system in front of their crews and about being judged by numbers they did not control. Dispatchers were the most positive: they spend their days chasing paper and would gain the most.
Differences Within Groups
Averages hide some important differences within the crews. Crew members with fewer than five years in the department scored noticeably higher on change efficacy, 3.6, than those with more than fifteen years, 2.7, which fits their greater comfort with phones and tablets. But on management support the pattern reversed: newer employees, who did not live through 2017, were only slightly more trusting than veterans, suggesting the story of the trackers has been passed down. Spanish-speaking crew members, about a fifth of the field staff, scored lowest on personal valence, and in a focus group several said no one had told them anything about the change in Spanish. Sanitation crews, who already follow fixed routes, saw less benefit in zones than highway and parks crews, whose work is scattered across the city.
Interpreting the Pattern
Armenakis et al. (1993) argued that readiness is built through a message that does two jobs, persuading people that the present way cannot continue and that the new way is within their reach, which they called discrepancy and efficacy, the sense that it can be accomplished, delivered through persuasive communication, active participation and the management of outside information. The department's discrepancy message has largely landed, since crews already see what paper costs them. The efficacy message has not, especially for foremen, and nobody has yet addressed what the change means for each person. Weiner (2009) treated readiness as something a whole organization holds: members must want the change together and believe together that they can pull it off. The shared doubt about management support, rooted in 2017, undermines both: crews will not commit to a change they expect leaders to abandon.
The Weight of History
The lowest scores of all are on management support among crews, 2.2 out of 5. In the focus groups, the reason was not hostility toward the current director, who arrived in 2021, but memory: the last change was announced, fought and abandoned, and no one explained why. Readiness here depends on rebuilding trust that this change will be done differently, and that trust must be shown in actions before launch, not promised in a memo.
Recommendations
Steps to raise readiness, by gap
| Gap | Step | Owner | Before launch |
|---|---|---|---|
| Management support (crews, foremen) | Director meets each division, acknowledges 2017 openly and commits to bargaining tablet use with the union | Director | Month 1 |
| Personal valence (crews) | Written agreement with the union on what location data will and will not be used for | Director; union president | Month 2 |
| Personal valence (crews) | Crews choose zone assignments within guidelines, keeping core teams together where possible | Division superintendents | Month 3 |
| Change efficacy (foremen) | Foremen trained first, in small groups, away from their crews, with practice time | Operations analyst | Months 2 to 3 |
| Change efficacy (all) | A pilot zone with volunteer crews whose experiences are shared | Operations analyst | Months 3 to 5 |
| Appropriateness (all) | Monthly figures on missed and repeated work orders shared with all staff | Dispatch supervisor | From month 1 |
Measuring Again
A second round of the survey will follow the pilot, and another comes before department-wide launch. The aim is to raise crews' and foremen's scores on management support and personal valence above 3.0, a sign that doubts have become manageable. If scores do not move, the launch will wait.
Conclusion
The department is ready to agree that paper must go. It is not yet ready to believe that management will carry this change out alongside its crews. The steps above address that gap directly, and the next milestone will build them into an analysis of the forces for and against the change.
References
Armenakis, A. A., Harris, S. G., & Mossholder, K. W. (1993). Creating readiness for organizational change. Human Relations, 46(6), 681-703. https://doi.org/10.1177/001872679304600601
Holt, D. T., Armenakis, A. A., Feild, H. S., & Harris, S. G. (2007). Readiness for organizational change: The systematic development of a scale. Journal of Applied Behavioral Science, 43(2), 232-255. https://doi.org/10.1177/0021886306295295
Weiner, B. J. (2009). A theory of organizational readiness for change. Implementation Science, 4, Article 67. https://doi.org/10.1186/1748-5908-4-67
What the OL 322 Module 2 instructions ask for
In OL 322, the Module 2 assignment centers on assessing an organization's readiness for a specific change. You will choose a way to measure readiness, such as a survey based on an established scale plus interviews or focus groups, gather and analyze the results and explain what they mean for the change plan. Readiness assessments that score well in OL 322 measure several dimensions rather than general enthusiasm, break results down by group, since readiness often differs between managers and front-line staff, combine numbers with employees' own words and recommend specific steps to raise readiness where it is low. They treat low readiness as information for the plan, not as a verdict on employees.
How this OL 322 Module 2 change readiness assignment example is built
The sample assesses readiness at the composite Merriton, Connecticut, Department of Public Works for tablets in every truck and four neighborhood crew zones. A survey adapted from Holt and colleagues' four dimensions, appropriateness, management support, change efficacy and personal valence, was answered by 141 of 186 employees, and six focus groups added crews', foremen's and dispatchers' views. Most agreed paper work orders cause missed jobs and duplicate trips, but few believed management would support them through the change, many feared being tracked and crews worried zones would break up long-standing teams. Armenakis, Harris and Mossholder's readiness message and Weiner's theory of shared commitment and efficacy frame the results and the recommended steps. Results are also compared within groups, by tenure and language.
Where the OL 322 Module 2 rubric puts the points
Grading for OL 322 readiness assessments generally weighs a sound method based on established readiness dimensions, adequate participation, analysis by group, use of employees' own words, accurate interpretation with readiness research and specific recommendations, along with clear presentation. Strong OL 322 papers show where readiness is high and low and explain why in each group. Papers lose marks for measuring only whether people like the change, reporting overall averages that hide group differences, ignoring history that shapes trust, blaming low scores on employees' attitudes or recommending generic communication with no link to the specific gaps found.
OL 322 Module 2 help: the mistakes that cost points
Choose an established set of readiness dimensions, such as whether people see the change as appropriate, believe management supports it, feel able to do it and expect it to benefit them. Write a few survey items for each and add open questions. Survey as many affected employees as you can, and run small group conversations to hear the reasons behind the numbers. Break results down by role or unit. Look for the dimensions where readiness is lowest and the groups where it differs most. Use readiness research to interpret the pattern. Recommend specific steps aimed at each gap, and plan to measure readiness again before launch. Offer the survey in the languages employees use.
Get OL 322 Module 2 written to your instructions
Share the OL 322 Module 2 directions and the change you are studying. We design or adapt a readiness survey and focus group questions, analyze results by group, explain them with readiness research and recommend steps to raise readiness before launch. Your first OL 322 readiness paper is free and comes to you within two days of the request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 322 papers and related BS Business Administration samples
- OL 322 Module 1 Discussion: Why Organizational Change Fails
- OL 322 Module 3 Milestone One: Change Analysis and Force Field
- OL 322 Module 4 Discussion: Resistance and Ambivalence
- OL 322 Module 5 Milestone Two: Change and Communication Plan
- OL 322 Module 6 Implementation Leadership Assignment: Leading Implementation and Technology Adoption
- OL 322 Module 7 Final Project: Change Management Plan
- OL 322 Module 8 Discussion: Sustaining Change
- OL 328 Module 2 Leadership Self-Assessment Assignment: Leadership Self-Assessment
- ACC 202 Module 2 Project Milestone One: A candle maker's cost formula
- INT 422 Module 4 Discussion: The Domestic Chinese Challengers
- ACC 330 Module 3 Gross Income and Exclusions Assignment: What Counts and What Does Not
OL 322 Module 2 questions, answered
Where can I find a free OL 322 Module 2 change readiness sample?
The full OL 322 Module 2 paper is on this page: a readiness assessment for tablets and neighborhood zones at a composite public works department.
What is readiness for change?
The extent to which people believe a change is needed and appropriate and feel able and committed to carry it out, assessed before a change begins.
How is change readiness measured?
Often with surveys based on established dimensions, such as appropriateness, management support, change efficacy and personal valence, plus interviews or focus groups.
How can leaders build readiness for change?
By communicating clearly why change is needed and that it can be done, involving people in shaping it and showing support, which research calls the readiness message.
Why analyze readiness by group?
Because managers, supervisors and front-line staff often differ sharply in readiness, and an overall average can hide the groups whose doubts will decide the outcome.