| Course | QSO 349 Project Contracting and Procurement |
|---|---|
| Module | Module 4 |
| Paper type | undergraduate discussion post comparing fixed-price, cost-reimbursable and time-and-materials contracts for one purchase and choosing one |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | BS Operations Management |
| Updated | October 2026 |
Free sample paper for QSO 349 Module 4
Module Four Discussion
New Boat, Old Question
Our new ferry will be the first hybrid-electric boat the Casco Narrows Ferry District has bought, and probably the first of its design any yard has built. My first instinct was cost-plus. If no one has built this boat, any fixed price a yard offers is a guess, and yards guess high when they carry the risk.
Bajari and Tadelis (2001) show that the real cost of a fixed price is not the risk premium but renegotiation: when the design is incomplete, every gap becomes a change order, priced when the buyer has no alternative seller. Cost-plus avoids that friction but gives the yard little reason to control cost, and the buyer must audit every invoice. The question is how complete the design will be when yards bid. Ours will be very complete. The naval architect's contract design, with stability, structure and arrangement settled and approved by the Coast Guard, is exactly the document a yard needs to price a hull. Turner and Simister (2001) distinguish uncertainty about the product from uncertainty about how to make it; our product uncertainty will be low by bid day, and building aluminum ferries is ordinary work for the yards we expect to bid. Williamson (1979) observed that the more uncertain a transaction, the more its contract must provide ways to adapt later; a frozen design reduces that need without removing it, which is why the change order clause still matters.
One cost sits outside any yard's control: battery cells, a large share of the propulsion system's cost, whose prices have swung widely in recent years. A yard bidding a fixed price for that cost would add a cushion we would pay whether or not prices rose. So I would use a firm fixed price with an economic price adjustment: the battery portion moves with a published cell price index, capped at 15 percent either way.
If the board rushed the bid before the contract design was approved, I would switch to a fixed price incentive fee contract, sharing overruns and savings with the yard. I would also reconsider if fewer than two yards bid, since a fixed price means little without competition.
Which single cost in your purchase would make a seller's fixed price unreliable?
References
Bajari, P., & Tadelis, S. (2001). Incentives versus transaction costs: A theory of procurement contracts. RAND Journal of Economics, 32(3), 387-407. https://doi.org/10.2307/2696361
Turner, J. R., & Simister, S. J. (2001). Project contract management and a theory of organization. International Journal of Project Management, 19(8), 457-464. https://doi.org/10.1016/S0263-7863(01)00051-5
Williamson, O. E. (1979). Transaction-cost economics: The governance of contractual relations. Journal of Law and Economics, 22(2), 233-261. https://doi.org/10.1086/466942
What the QSO 349 Module 4 instructions ask for
The QSO 349 Module 4 discussion usually concerns contract types. Students are asked to compare fixed-price contracts, including firm fixed price, fixed price incentive fee and fixed price with economic price adjustment; cost-reimbursable contracts, such as cost plus fixed fee, cost plus incentive fee and cost plus award fee; and time-and-materials contracts, and to recommend one for a purchase. Strong posts explain how each type shares cost risk between buyer and seller, link the choice to how completely the work can be specified, consider clauses that adjust a type to the situation and support the choice with research. A good reply asks a classmate what would make the seller's price unreliable or how the buyer would control costs under a cost-plus contract.
How this QSO 349 Module 4 discussion example is built
The post considers the contract for the Casco Narrows Ferry District's hybrid-electric ferry, a fictional first-of-its-kind boat for a Maine operator. Cost-plus looks natural for a new design, but the district will bid the boat only after its contract design is complete and approved by the Coast Guard, so most of the uncertainty about the product is gone. What remains is the price of battery cells, which no yard can control. The post recommends a firm fixed price with an economic price adjustment tied to a battery index and capped at 15 percent. Bajari and Tadelis on renegotiation costs and Turner and Simister on uncertainty support the choice, and the post names what would change it.
Where the QSO 349 Module 4 rubric puts the points
Marks in the QSO 349 Module 4 thread go to posts that describe the main contract types correctly, show how each one moves cost risk between buyer and seller, fit a recommendation to the particular purchase and how uncertain it is, use adjustment or incentive clauses sensibly, apply cited research and offer replies that probe a classmate's recommendation. The best posts admit what the buyer gives up under the chosen type and name the facts that would change it. Weaker posts recite definitions without a purchase, assume new work always calls for cost-plus, forget what overseeing a cost-plus contract costs the buyer or answer peers with a word of praise. Grammar and APA citations are part of the score.
QSO 349 Module 4 help: the mistakes that cost points
Start by asking how completely the work can be described before the contract is signed. If a seller can price it confidently, a fixed price puts cost risk where the seller can manage it. If the scope is unclear or likely to change, a fixed price will either be padded or renegotiated, and a cost-reimbursable contract with controls may be cheaper. Time and materials suits small or open-ended work with a cap. Then look for the single biggest uncertainty and see whether a clause can handle it, such as a price adjustment for a volatile material or an incentive for early delivery. A common mistake is choosing cost-plus because the work is new; another is ignoring the auditing a cost-plus contract requires.
Get QSO 349 Module 4 written to your instructions
Paste the QSO 349 Module 4 prompt and describe the purchase you are contracting. A writer compares fixed-price, cost-reimbursable and time-and-materials options, explains how each shares risk, chooses one with any adjustment or incentive clauses and says what would change the choice, citing contracting research, and asks QSO 349 classmates a question. Your first QSO 349 post is free and comes to you in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More QSO 349 papers and related BS Operations Management samples
- QSO 349 Module 1 Discussion: Why Buying the Ferry Is Most of the Project
- QSO 349 Module 2 Make-or-Buy Assignment: Designing the Ferry In-House or With a Naval Architect
- QSO 349 Module 3 Project One: The Procurement Management Plan
- QSO 349 Module 5 Source Selection Assignment: Scoring Three Shipyard Proposals
- QSO 349 Module 6 Discussion: Negotiating With the Winning Shipyard
- QSO 349 Module 7 Project Two: Changes, a Battery Delay and Closeout
- QSO 349 Module 8 Discussion: A Losing Shipyard's Protest
- MKT 410 Module 1 Discussion: What Digital Analytics Is For
- QSO 330 Module 4 Discussion: One Hinge Supplier or Two?
- ACC 201 Module 7 Final Project Summary Report: Adjustments, statements and owner advice
- HRM 360 Module 2 Analytics Framing Assignment: The Question and the Data Behind It
QSO 349 Module 4 questions, answered
Where can I find a free QSO 349 Module 4 Discussion sample?
This page holds the full QSO 349 Module 4 post: choosing a contract type for an invented ferry district's first hybrid-electric boat.
What is a firm fixed price contract?
A contract in which the seller agrees to deliver the defined work for a set price, bearing the risk of cost overruns, with changes priced only through change orders.
What is a cost-plus contract?
A cost-reimbursable contract in which the buyer pays the seller's allowable costs plus a fee, fixed or tied to incentives or performance, and bears most of the cost risk.
What is an economic price adjustment clause?
A clause in a fixed-price contract that adjusts the price for changes in specified costs, such as materials or labor, usually tied to a published index.
When is a time-and-materials contract used?
For work whose amount cannot be defined in advance, such as support or repairs, paid at agreed hourly rates plus materials, usually with a not-to-exceed limit.